Capacity allocation

This page provides you with current data on grid capacity at the hubs of the 50Hertz control area with transmission system operators in Poland (PSE), the Czech Republic (CEPS) and Denmark (Energinet.dk).

Disclaimer:

All figures published on the following pages have been determined and made available to the best of our ability. We accept no responsibility for accuracy and completeness, or for occurrence of the described scenario. The capacity offered and awarded in the auctions may differ from the indicated figures; any legal claims shall be excluded. No liability will be accepted for any damage resulting from temporary non-availability or incorrectness of figures. Should technical or other reasons temporarily prevent determination or posting of these figures, 50Hertz will endeavour to re-enable posting of the figures as soon as possible.

50Hertz reserves the right to subsequently change data should this be required for correction purposes.

Grid capacity at the border between 50Hertz and CEPS, a.s., and PSE S.A.

The indicated figures represent the total of capacities of all hubs, in each case after netting for both directions of the load flow.

Loading data Webservice not available There are no data available
ID: 4487

Download csv files for each month

 

Webservice not available

Grid capacity at the border between 50Hertz and Energinet.dk

The indicated figures represent the total of capacities of all hubs, in each case after netting for both directions of the load flow.

Loading data Webservice not available There are no data available
ID: 4490

Downloads CSV-Dateien monatsweise

Downloads
You have the possibility to download the presented grid data monthly.

Webservice not available