To ensure the security of supply, we are currently planning the construction of several new overhead power lines with an extra high voltage level of 380 kV: among these are the Uckermark line, which will transport electricity from the Prenzlau area in Brandenburg to Neuenhagen bei Berlin, the South-West Interconnector from Halle to Schweinfurt in Bavaria and the 380 kV "Nordring Berlin", the third interconnector between Poland and Germany; Here, you can find all important information on the most significant ongoing projects: planning statuses, maps and contact addresses or people to consult in case of questions or information requests. Help us improve.

South-East DC Passage

South-East DC Passage

The South-East Direct Current Passage planned by 50Hertz is one of the most important new transmission lines between northern and southern Germany that are needed for a successful energy transition. This high voltage direct current (HVDC) power link between Saxony-Anhalt and Bavaria, with its minimum length of 450 kilometres, should be operational in 2022.
Read more
Grid reinforcement of 380-kV Röhrsdorf – Weida – Remptendorf

Grid reinforcement of 380-kV Röhrsdorf – Weida – Remptendorf

The existing 100 km-long 380-kV overhead line between Röhrsdorf in Saxony and Remptendorf in Thuringia is currently operated at 2500 ampere per electrical circuit. It should be upgraded to a current-carrying capacity of 3600 ampere in the future. 

Read more
380-kV Berlin diagonal power link

380-kV Berlin diagonal power link

One of the lines in high demand due to the growth in renewables is the 380-kV diagonal power link running across Berlin. 50Hertz is planning an urgently needed capacity upgrade in the years to come.

Read more
380-kV overhead line Bertikow – Pasewalk

380-kV overhead line Bertikow – Pasewalk

The 380 kv overhead line connecting Pasewalk and Bertikow is intended to ensure security of supply in the region. To this end, 50Hertz is replacing the existing 220 kV EHV line between Pasewalk and Bertikow with a more powerful 380 kV overhead line.

Read more
380-kV overhead line Güstrow – Parchim Süd – Perleberg

380-kV overhead line Güstrow – Parchim Süd – Perleberg

A 220-kV overhead line runs between the substations of Güstrow in Mecklenburg-Western Pomerania and Perleberg in Brandenburg. Its capacity should be increased to 380 kV. The planned overhead line should for the most part run along the existing line route for about 100 kilometres. 

Read more
380-kV overhead line Perleberg – Wolmirstedt

380-kV overhead line Perleberg – Wolmirstedt

50Hertz is planning the replacement of the available 220-kV line between Wolmirstedt and Güstrow with a current-carrying capacity of 1,070 amperes by a more powerful 380-kV line with a 3,600 ampacity. 

Read more
380-kV overhead line "Nordring Berlin"

380-kV overhead line "Nordring Berlin"

Along the A10 north of Berlin, 50Hertz is replacing the current 220 kV line with a 380 kV EHV overhead line, which will connect the Brandenburg substations of Neuenhagen bei Berlin and Wustermark.

Read more
The South-West Interconnector

The South-West Interconnector

The South-West Interconnector is a 380 kV overhead line, constructed by 50Hertz in three sections between Bad Lauchstädt (Saxony-Anhalt) and the Thuringian border with Bavaria.

Read more
Uckermark Line

Uckermark Line

50Hertz is planning an EHV line from the Prenzlau region to Neuenhagen bei Berlin. With this project, 50Hertz factors in the growing segment of renewables in Brandenburg.

Read more
Grid connection of the Jessen/Nord substation

Grid connection of the Jessen/Nord substation

The increasing share of electricity generated from renewable energy sources requires the reinforcement of the grid in the Falkenberg-Herzberg-Jessen region. To this end, 50Hertz is constructing a new substation near Jessen in Saxony-Anhalt.
Read more
380-kV overhead line 3rd interconnector

380-kV overhead line 3rd interconnector

This overhead line of European significance, a transition between the German and Polish transmission systems, is being constructed between Eisenhüttenstadt in Germany and Plewiska in Poland. Polish TSO PSE-O and German TSO 50Hertz are working together as partners to ensure the success of this project.

Read more