Projects

To ensure the security of supply, we are currently planning the construction of several new overhead power lines with an extra high voltage level of 380 kV: among these are the Uckermark line, which will transport electricity from the Prenzlau area in Brandenburg to Neuenhagen bei Berlin, the South-West Interconnector from Halle to Schweinfurt in Bavaria and the 380 kV "Nordring Berlin", the third interconnector between Poland and Germany; Here, you can find all important information on the most significant ongoing projects: planning statuses, maps and contact addresses or people to consult in case of questions or information requests. Help us improve.

380 kV overhead line - third interconnector

380 kV overhead line - third interconnector

This overhead line of European significance, a transition between the German and Polish transmission systems, is being constructed between Eisenhüttenstadt in Germany and Plewiska in Poland. Polish TSO PSE-O and German TSO 50Hertz are working together as partners to ensure the success of this project.

Read more
380 kV overhead line Pasewalk-Bertikow

380 kV overhead line Pasewalk-Bertikow

The 380 kv overhead line connecting Pasewalk and Bertikow is intended to ensure security of supply in the region. To this end, 50Hertz is replacing the existing 220 kV EHV line between Pasewalk and Bertikow with a more powerful 380 kV overhead line.

Read more
380 kV overhead line "Nordring Berlin"

380 kV overhead line "Nordring Berlin"

Along the A10 north of Berlin, 50Hertz is replacing the current 220 kV line with a 380 kV EHV overhead line, which will connect the Brandenburg substations of Neuenhagen bei Berlin and Wustermark.

Read more
South-East DC Passage

South-East DC Passage

The South-East Direct Current Passage planned by 50Hertz is one of the most important new transmission lines between northern and southern Germany that are needed for a successful energy transition. This high voltage direct current (HVDC) power link between Saxony-Anhalt and Bavaria, with its minimum length of 450 kilometres, should be operational in 2022.
Read more
The South-West Interconnector

The South-West Interconnector

The South-West Interconnector is a 380 kV overhead line, constructed by 50Hertz in three sections between Bad Lauchstädt (Saxony-Anhalt) and the Thuringian border with Bavaria.

Read more
Uckermark Line

Uckermark Line

50Hertz is planning an EHV line from the Prenzlau region to Neuenhagen bei Berlin. With this project, 50Hertz factors in the growing segment of renewables in Brandenburg.

Read more
Netzverstärkung 380 kV Röhrsdorf – Weida – Remptendorf

Netzverstärkung 380 kV Röhrsdorf – Weida – Remptendorf

Die Energiewende stellt auch neue Anforderungen an das Stromnetz. Durch den Neubau einer 380-kV-Freileitung zwischen den Umspannwerken Röhrsdorf und Remptendorf soll die Stromübertragungsfähigkeit im Süden der 50Hertz-Regelzone erhöht, und die Versorgungssicherheit gewährleistet werden.
Mehr erfahren
380-kV-Freileitung Pulgar – Vieselbach

380-kV-Freileitung Pulgar – Vieselbach

Im Rahmen des Ausbaus und der Ertüchtigung des Übertragungsnetzes im Norden und Osten Deutschlands plant 50Hertz den Ersatzneubau der 380-kV-Freileitung zwischen den Umspannwerken Pulgar bei Zwenkau (Sachsen) und Vieselbach bei Erfurt (Thüringen).
Mehr erfahren