Master data for EEG generators

Plant operators who put an RES installation into operation after 31 July 2014, shall transmit the installation data to the installation register managed by the Federal Network Agency pursuant to § 6 of the EEG.
By downloading the following file, you can consult the master data of the RES installations put into operation before 31 July 2014.
For reasons of data protection, the installations' locations are only made public up to the postal code level.

Download file

Disclaimer of liability:

The data are disclosed as received from each distribution system operator (DSO). We assume no liability or warranty for the correctness, completeness and topicality of these data, or for the diligence with which the DSOs have researched and checked these data.