50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
  • Job Offers
  • About 50Hertz
  • Application Procedure
  • Job subscription
Show All
Home/Career/Positions for professionals

Positions for professionals

Positions for professionals

To the job list

If there are currently no job vacancies or if you can't find a position you are interested in, then we recommend our job subscription.

Job subscription

 
You can set up your personal job subscription here. 

Special Jobs System Management

The Transmission Control Center (the "Network Control Center") controls the power grid. Anyone who has a job here is very close to the challenges of the energy revolution: Is it possible to keep the extra-high voltage grid stable live and around the clock? Despite the volatility of renewable energies? Shift engineers, supported by colleagues who develop analyses, concepts, processes and tools for them, keep an eye on this.

  • LEARN MORE

Special Jobs Construction Engineering

No overhead line without steel construction, no transformer station without structural engineering, no cable tunnel without civil engineering. The spectrum of construction tasks ranges from the support of conversion and repair projects during ongoing operations, through the development of standards for construction in the extra-high voltage environment, to the handling of complex large-scale projects.

  • Learn more

Special Jobs at Purchasing

Those working at 50Hertz Purchasing have a deep understanding of the challenges the company is currently facing. There are many of them as 50Hertz is investing in the energy transition. In 2016 only, around 730 million euros were invested in grid infrastructure. Behind these investments are exciting procurement projects with plenty of freedom for purchasers who want to grow with their Tasks.

  • Learn more 

Special IT-Jobs

The digitisation of the energy transition is gaining momentum. IT therefore becomes a key element for the integration of renewable energy. This requires smart solutions to manage the complexity in real-time to connect nature, technology, physics and market economics in an intelligent manner.

  • Learn more 

Special Offshore jobs (Baltic Sea)

Hand in hand with the energy transition, 50Hertz is undertaking challenging projects in the German Baltic Sea to transport the electricity generated by offshore wind farms to the onshore electrical grid by means of submarine cables. This offers exciting job opportunities in the offshore business for experienced specialists. The energy industry is already taking the next decisive step.

  • Learn more 

Where can I work at 50Hertz?

  • TO THE MAP
CONTACT HUMAN RESOURCES
If you have any questions, please feel free to contact us.

Dr. Andreas Holleczek

  • Tel:
    +49 (0) 30 5150-2180
  • E-Mail:
    work@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login