50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
  • Job Offers
  • About 50Hertz
  • Application Procedure
  • Job subscription
Show All
Home/Career/Unsolicited applications

Unsolicited applications


Students

If you are interested in an internship, work student activity or a traineeship as law graduate at 50Hertz, we feel that a proactive application is a very good way to get in touch with us. This also applies if you want to write your bachelor, master or other thesis at our company. Please use the unsolicited application form for students (see above).

Legal clerkship

You have successfully passed your first juristical state examination and want to complete one station of your legal clerkship in the field of energy law? The energy transition offers challenging tasks. At 50Hertz, you get the opportunity to test your knowledge in practice. Please use the 'Bewerbungsformular für Initiativbewerbung Juristisches Referendariat' for your application.

Experienced professionals and young professionals

For experienced professionals and young professionals, we recommend our job subscription instead of a proactive application: we will gladly inform you by e-mail as soon as we advertise a position that corresponds to your desired category.

Where can I work at 50Hertz?

  • TO THE MAP
CONTACT FOR UNSOLICITED APPLICATIONS
We are happy to answer all questions you may have on unsolicited applications.

Hannah Grandinger

  • Tel:
    +49 (0) 30 5150-3623
  • E-Mail:
    work@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login