50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • NordOstLink
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
          • Substations onshore/offshore
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Grid developement
  • System control
  • Grid operations
  • MCCSNG
Home/Grid/MCCSNG

Market sounding SCADA/EMS & integration of products in MCCS NextGen

As part of 50Hertz's strategy, the company is developing MCCS NextGen, a new and fully modular control center system that will be able to integrate all relevant capabilities within the domain of system operation. The aim of MCCS NextGen is to quickly respond to the increasing change needs and complexity of system operation.

50Hertz will operate MCCS NextGen within its own control center. MCCS NextGen will also be shared by 50Hertz as a vision, architecture, and reference solution with peers (e.g., other international TSOs) in a MCCS NextGen community, becoming a blueprint for 50Hertz and other TSOs and community partners.

The new control center system can be adjusted easily to respond to possible – current and future – requirements and can implement them flexibly and rapidly. MCCS NextGen shall interact with products from the market. 50Hertz is therefore interested in the market's ability to integrate into MCCS NextGen and would like to use this market sounding to find out the requirements of service providers and suppliers to deliver and integrate their products into MCCS NextGen, and to collaborate with 50Hertz applying innovative delivery models.

The goal of this market sounding is to collect feedback and open a dialogue with suppliers. To this end, 15 questions in categories

  • Service Provider Profile & Portfolio,
  • MCCS NextGen Vision & Architecture, and
  • Delivery, Collaboration & Legal

are included in this market survey.

All information on the market sounding (pdf file, 1 MB)

Thank you very much for your interest and your active contribution in the 50Hertz SCADA/EMS market sounding! The market sounding is hereby finished. Please find the White Paper here:
MCCS NEXTGEN Market Sounding SCADA/EMS White Paper 

Ladies and Gentlemen,

Thank you very much for your interest and your active contribution in the 50Hertz SCADA/EMS market sounding! We have received an incredibly large number of detailed responses and deliberate statements from vendors and service providers covering many different product and service categories in the context of MCCS NextGen.

Your contributions strongly support our vision and the approach that 50Hertz is pursuing with MCCS NextGen. With your interest and encouragement, we feel committed to follow the journey we have started.

In particular, we have found broad support for our Vision, Architecture, Modularization concept and a high willingness of product companies to integrate their products into the MCCS NextGen Ecosystem.

We are glad to share with you and our peers the insights gained with our market sounding in a report that is carefully prepared with regard to confidentiality and trust not to disclose vendor specific information. The summary is published on this website.

The market sounding is hereby finished.

For compliance reasons, please do not approach 50Hertz or Elia regarding the market sounding or related follow-up activities. As a sector-regulated enterprise, 50Hertz will approach the market in appropriate ways as soon as relevant market or procurement actions have been launched. We would be glad to actively work with you in the future.

Warmest regards,

Your MCCS Team

  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login