50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Grid Data
    • Production
    • Disclosure of EEG data
    • Congestion management
      • Measures as per § 13 para. 1 EnWG (Conventional power plants)
      • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
      • Measures as per § 13 para. 2 EnWG
      • Commercial transactions to balance the redispatch balancing group
      • Archive Measures as per § 13 EnWG
      • Redispatch Calculator SWKL
      • Outage and Planning
    • Balancing
  • Positions and Contact
Home/Transparency/Grid Data/Congestion management/Outage planning

Outage planning

In order to ensure a constant and uninterrupted electricity supply, regular maintenance work and inspections of our grid components are necessary. These are grouped under the term ‘outage’. Below you can find an overview of all planned outages.

Below are shown the planned outages and their impact on the transmission capacity from Poland and the Czech Republic as well as from / to eastern Denmark. 

Planned non-availabilities of operating facilities due to outage or fault elimination or for other reasons are listed, with an indication of the duration. 

Unplanned non-availabilities (e.g. for fault elimination) for the current year are published under unplanned outages as soon as possible with an indication of the duration and the reason.

Replacement of the German land cable of KONTEK

19h May 2020, Validity until 30th June 2023, Bidding zone border: DK2-DE/LU

The KONTEK link (“KONTEK”) is an HVDC cross-border transmission line that was commissioned in June 1996. It runs from Bjæverskov (Eastern Denmark) to Bentwisch (Germany) and connects the asynchronously operated transmission grids of Energinet in Eastern Denmark and 50Hertz.

After roughly 25 years in operation, the German land cable of KONTEK between Hohe Düne and the substation Bentwisch in Mecklenburg-Western Pomerania has reached the last part of its operating ability and needs to be replaced.

In order to minimise the unavailability of KONTEK due to the replacement of the German land cable, the new land cable will be laid first and only upon completion, the old one will be dismantled.

For the switch from the old land cable to the new one, a temporary outage of KONTEK for a lot of about three weeks will be needed – either in the second half of 2022 or in the first half of 2023.

More information will be published when available.


Search

You can search for details on planned and performed outages dating back to 2015. A place name can be searched by entering it in the free text field. 

An overview of the outages performed between 2006 and 2015 can be found further below.

Zurück zur Übersicht
Kategorie Ausfall
Revisions-ID 49472944586704676
Zeitraum 3/22/2022  9:38 AM - 3/22/2022  9:38 PM
Änderung
3/22/2022  9:43 AM
Beginn 3/22/2022  9:38 AM
Ende
Voraussichtliches Ende 3/22/2022  9:38 PM
Spannungsebene 380-kV
Netzelement TPP Boxberg - Bärwalde Ma R
Revisions-ID 49472944586704676
Marktgebiet 50Hertz-Regelzone
Beeinträchtigte Kapazität 100%
Betroffener Betriebsstoff Elektrischer Strom
Grund Outage
Weitere Informationen

Archive outage planning

The outages of the previous years can be downloaded here as PDF files.

Downloads (German)

  • GEPLANTE NICHTVERFUEGBARKEITEN 2006 Download PDF (10.04 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2007 Download PDF (10.12 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2008 Download PDF (10.11 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2009 Download PDF (10.11 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2010 Download PDF (45.28 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2011 Download PDF (45.42 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2012 Download PDF (52.18 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2013 Download PDF (23.36 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2014 Download PDF (22.52 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2015 Download PDF (22.28 KB)
CONTACT

50Hertz Transmission GmbH

Heidestraße 2 | 10557 Berlin Germany
  • Tel:
    0049 (0) 30 - 5150 - 0
  • E-Mail:
    info@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login