50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
  • Grid Data
    • Production
      • Grid feed-in
      • Photovoltaics
      • Wind power
    • Disclosure of EEG data
      • Annual EEG bill
      • Publications on EEG balancing group
    • Congestion management
      • Measures as per § 13 para. 1 EnWG
      • Measures as per § 13 para. 2 EnWG
      • Commercial transactions to balance the redispatch balancing group
      • Archive Measures as per § 13 EnWG
      • Outage planning
      • Outages
      • Redispatch Calculator SWKL
    • Balancing
      • Control reserve (capacity provision)
      • Control energy (activated balance energy)
  • Positions
Show All
Home/Transparency/Grid Data/Congestion management/Outages

Information about unplanned outages

In the following, we provide information on potentially market-relevant unplanned outages in the transmission grid of 50Hertz Transmission GmbH that have an impact on the transmission capacity (NTC value) which affects the grid users of 50Hertz.

An overview of planned outages can be found here.

Search

You can search for details on market-relevant unplanned outages back to 2012. A place name can be searched by entering it in the free text field.

Zurück zur Übersicht
Kategorie Ausfall
Revisions-ID 49472944586666822
Zeitraum 2/16/2021  10:50 AM - 2/17/2021  9:05 AM
Änderung
2/17/2021  9:13 AM
Beginn 2/16/2021  10:50 AM
Ende 2/17/2021  9:05 AM
Voraussichtliches Ende
Spannungsebene 380-kV
Netzelement Goldisthal - Altenfeld 462
Revisions-ID 49472944586666822
Marktgebiet 50Hertz-Regelzone
Beeinträchtigte Kapazität
Betroffener Betriebsstoff Elektrischer Strom
Grund Outage
Weitere Informationen
Änderung
2/16/2021  1:23 PM
Beginn 2/16/2021  10:50 AM
Ende
Voraussichtliches Ende
Spannungsebene 380-kV
Netzelement Goldisthal - Altenfeld 462
Revisions-ID 49472944586666822
Marktgebiet 50Hertz-Regelzone
Beeinträchtigte Kapazität
Betroffener Betriebsstoff Elektrischer Strom
Grund Outage
Weitere Informationen

Information of the connecting transmission system operator in accordance with §17f Para. 3 EnWG (offshore) 

The reports published on this page are updated quarterly. This page lists reports on interruptions to the offshore grid Connection.

Interruptions of the offshore grid connection

  • 2020 Q4 Download PDF (204.57 KB)
CONTACT

50Hertz Transmission GmbH

Heidestraße 2 | 10557 Berlin Germany
  • Tel:
    0049 (0) 30 - 5150 - 0
  • E-Mail:
    info@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login