50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
    • History
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380-kV overhead line Pulgar-Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 1
        • Ostwind 2
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Intra-year monthly billing
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
  • Grid developement
    • Onshore projects
      • 380 kV overhead line Pasewalk – Bertikow
      • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
      • 380-kV overhead line Perleberg – Wolmirstedt
      • 380-kV overhead line Pulgar-Vieselbach
      • 380-kV Berlin diagonal power link
      • 380 kV overhead line "Nordring Berlin"
      • Third interconnector
      • Grid connection of the Jessen/Nord substation
      • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
      • SuedOstLink
      • South-West Interconnector
      • Uckermark Line
    • Offshore projects
      • Combined Grid Solution
      • Hansa PowerBridge
      • Ostwind 1
      • Ostwind 2
    • Interconnectors and phase shifters
    • Concluded projects
      • 380-kV line Bärwalde – Schmölln
      • 380 kV grid connection to the Förderstedt substation
      • Baltic 1
      • Baltic 2
      • Wind Bus Bar
    • Why expand the grid?
      • Frequently asked questions
      • 50Hertz Energy Transition Outlook 2035
    • Planning criteria
      • Protection for people and nature
      • Bird protection
      • Overhead line and cable
      • Cost-effectiveness
    • Planning and approval process
      • Grid Development Plan (GDP) and Federal Requirement Plan
      • Planning and licensing
      • Transparency and public participation
    • Compensations for municipalities
    • Projects of Common Interest (PCI)
    • BESTGRID
      • 50Hertz pilot project
      • Publications
    • compactLine
  • System control
    • Grid control
    • System balancing
    • Grid availability
    • Redispatch
  • Grid operations
Show All
Home/Grid/Grid developement/Onshore projects/Grid connection of the Jessen/Nord substation

Grid connection of the Jessen/Nord substation

In Jessen on the Elster river in the Wittenberg district, 50Hertz and regional distribution system operator MITNETZ STROM built a new substation from 2014 to 2016. The increasing share of electricity generated from renewable energy sources requires the reinforcement of the grid in the Falkenberg-Herzberg-Jessen region. The Jessen/Nord substation is an interface between the 380 kV transmission system and the 110 kV distribution system. It is situated in the immediate vicinity of both the existing extra high voltage transmission lines between Ragow and Förderstedt and Ragow and Lauchstädt.

The connection of the existing line from Ragow to Lauchstädt (near Halle) was established in 2015/2016 in the form of conventional steel lattice towers. For the two-kilometre long power link of the line between Ragow and Förderstedt (near Magdeburg), 50Hertz is using the new compactLine pilot line. The compactLine was developed as a tower type with a compact structure, which owing to its lower height (approx. 36 metres) and more narrow corridor (approx. 55-60 metres) can offer a technical alternative, especially for the replacement of existing 220 kV overhead lines. The pilot project near Jessen offers good conditions for the first practical test as an additional connection to the substation.

News

The compactLine near Jessen in Saxony-Anhalt. Copyright: 50Hertz
25.09.2018 |
Project News
Video shows development and construction of the compactLine
Since August 2018, the compactLine pilot line near Jessen in Saxony-Anhalt is transporting electricity. 50Hertz has been working on the development, testing and implementation of this space-saving overhead line with several partners since 2013. The video shows the milestones up to the commissioning of the test line.
Read More
Archive
CONTACT

Dr. Dirk Manthey

Public participation
  • Tel:
    +49 (0) 30 5150-3419
  • E-Mail:
    dirk.manthey@50hertz.com
Aerial view of the Jessen/Nord substation. Photo: Jan Pauls

Background information grid connection Jessen/Nord

Need and legal background

A large number of wind farms are being erected in eastern Saxony-Anhalt, more specifically in the region of Falkenberg-Herzberg-Jessen. This region offers particularly good conditions for the generation of wind power. The total surface of the suitable wind power areas increases by half. The transport of the electricity generated in the wind farms makes it necessary to either reinforce existing lines and substations or construct new ones.

According to meticulous research by 50Hertz and distribution system operator MITNETZ STROM, carried out under its obligation to connect renewable energy (RES) installations immediately and as a priority, the Jessen/Nord site has proven to be the optimal economical and technical location. 50Hertz and MITNETZ are building a new interface between the transmission and distribution systems to the east of the city of Jessen. The substation makes optimal use of the existing infrastructure, which reduces the impact on nature and the landscape.

The new substation will be connected to the Ragow-Lauchstädt 380-kV line, between Großkorga and the Schwarze Elster river. The planning for the line integration provides the disassembly of the six existing transmission towers and the erection of seven new ones. 

The towers of the compact line are only between 30 and 36 meters high. Photo: Jan Pauls
Line route

In the area surrounding the substation's building site, the current Ragow–Lauchstädt 380-kV line runs in a south-westerly direction. Two new overhang points (terminal towers) enable the substation's Integration.

Survey map grid connection Jessen/Nord

  • DOWNLOAD AS JPG (543 KB)
Authorisation procedure

Substation

The approval and construction of substations is subject to the Federal Immission Control Act (BImSchG) and are therefore different from the approval procedure for a 380-kV overhead line.

The application for a permit under the BImSchG for the construction of a new 380/110-kV outdoor switchyard was submitted on 14 November 2013. On 5 September 2014, the competent environmental department of the Wittenberg district approved the project and as such granted the building permit for the Project.

Overhead line

The selected location is best suited for the construction of a 380-kV overhead line, so that the construction works do not affect nature conservation areas or other ecologically valuable Areas.

In January 2015, the application documents for the 380-kV overhead line were submitted to the Administrative Office of Saxony-Anhalt. After a thorough review of the documents, the authority decided to release the 380-kV overhead line from the planning approval proceedings and approved the plan that was submitted.

In consultation with the local public authorities and the land owners, the Administrative Office was able to confirm the route corridor established by 50Hertz.

The construction permit for the 380-kV grid connection was granted in late January 2015.

Construction and operation

Substation

The new substation has been under construction since September 2014. The foundations for the transformers, all single foundations, the steel constructions as well as the industrial buildings have already been completed. The first transformer was installed in the substation and connected on 5 May 2015. The second 380/110-kV transformer has also arrived at the substation. The final works are currently ongoing at the substation's construction site.  

During normal operation, the complete substation will be controlled and monitored remotely by regional centre Ost. The 50Hertz employees perform regular on-site maintenance and checks on the installation and Equipment.

Overhead line

The construction work on the line section began in July 2015. The tower locations were prepared between early July 2015 and late September 2015. During that period, preparations were also made for the foundations and the testing assembly of the tower constructions. The installation of the conductors is planned for March to April 2016.

The commissioning of the line sections and the substation is expected to take place in April 2016. The old towers will then be disassembled.

Further information

All information on the project's progress

  • BACKGROUND INFORMATION
Questions? We are here to answer

Citizens‘ Telephone

0800-58952472
Monday-Friday: 8AM-8PM
Free of charge from the German landline and mobile network
Keep up-to-date with the latest developments

Newsletter

You can select the relevant newsletters from fourteen areas
SUBSCRIBE HERE
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login