50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
  • Structure
    • Management
    • Supervisory Board
  • Roles
  • Business locations
  • Sustainability
    • CSR Portal
    • Occupational safety
    • Engagement
    • Governance
  • Innovation
  • Partnerships
  • History
  • Strategy
    • Future. Renewable
    • Future. Economic
    • Future. Digital
    • Future. Thoughtful
Show All
Home/Company/Business locations

Business locations

With ten business locations, our teams ensure electricity is always available to over 18 million people in the German Federal states of Berlin, Brandenburg, Hamburg, Mecklenburg-Western Pomerania, Schleswig-Holstein, Saxony, Saxony-Anhalt and Thuringia.

The company’s administrative centre is situated in Berlin-Mitte. Maintenance of the transmission system, substations and switching stations is organised through seven regional centres. At the Control Center (CC) in Neuenhagen near Berlin 50Hertz monitors the energy flowing through the systems in order to maintain the balance between generation and consumption at all times.

Competent Regional Centre - line information, manhole certificates, construction measures

The map below shows the distribution of our regional centres within our grid area based on their responsibilities. Enter your location to show the Regional Centre responsible for your area. This especially applies when you require information on a line, a manhole certificate or have a question about the region.

We recommend that you use the Internet platform InfreSt (Infrastruktur eStrasse GmbH) for fast line information. Your advantage: At the same time you receive information about existing systems of other connected line carriers and authorities.

50Hertz Transmission GmbH - Headquarters

Heidestraße 2, 10557 Berlin

 How to find us

Northern Regional Centre

Location Güstrow: Rostocker Chaussee 18, 18273 Güstrow

Location Greifswald: Am Koppelberg 17, 17489 Greifswald

Line information Northern Reginal Centre

  How to find us (Location Güstrow)

Ralf Plischke
CONTACT

Ralf Plischke

Head of Northern Regional Centre
  • Tel:
    +49 (0) 3843-285295
  • E-Mail:
    ralf.plischke@50hertz.com

Central Regional Centre and Control Center (CC)

CC and Location Neuenhagen: Am Umspannwerk 10, 15366 Neuenhagen bei Berlin

Location Berlin: Darwinstraße 17, 10589 Berlin

Line information Central Regional Centre

 How to find us (Location Neuenhagen)

Carsten Hose
CONTACT

Carsten Hose

Head of Central Regional Centre
  • Tel:
    +49 (0) 3342-233221
  • E-Mail:
    carsten.hose@50hertz.com
CONTACT

Andreas John

Head of System Operations
  • Tel:
    +49 30 5150-0
  • E-Mail:
    info@50hertz.com

Eastern Regional Centre

Location Lübbenau: Sigmund-Bergmann-Straße 1, 03222 Lübbenau / Spreewald

Location Röhrsdorf: Haardt 33, 09247 Röhrsdorf 

Line information Eastern Regional Centre

How to find us (Location Standort Lübbenau)

How to find us (Location Röhrsdorf)

CONTACT

Uwe Granzow

Head of Eastern Regional Centre
  • Tel:
    +49 (0) 3542-87190431
  • Tel:
    +49 (0) 3722-639300
  • E-Mail:
    uwe.granzow@50hertz.com

Southern Regional Centre

Location Bad Lauchstädt: Zentrales Umspannwerk 8, 06246 Bad Lauchstädt 

Location Vieselbach: Erfurter Allee 50, 99098 Erfurt

Line information Southern Regional Centre

How to find us (Location Bad Lauchstädt)

CONTACT

Uwe Herrmann

Head of Southern Regional Centre
  • Tel:
    +49 (0) 3456-136471
  • E-Mail:
    uwe.herrmann@50hertz.com

Western Regional Centre

Location Wolmirstedt: Am Umspannwerk 1, 39326 Wolmirstedt

Location Hamburg: Hegenredder 50, 22117 Hamburg

Line information Western Regional Centre

How to find us (Location Wolmirstedt)

CONTACT

Andreas Mötzing

Head of Western Regional Centre
  • Tel:
    +49 (0) 39201-68411
  • Tel:
    +49 (0) 40-68871577-300
  • E-Mail:
    andreas.moetzing@50hertz.com

Central Storehouse

Sigmund-Bergmann-Straße 1
03222 Lübbenau / Spreewald

+49 (0) 3542-87190380

lager.luebbenau@50hertz.com

How to find us

  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login