The energy transition is changing power flows and leads to more stringent requirements for the transmission grids that transport the electricity from generation to consumption centres. This also applies to the capital, especially considering the energy demand that is predicted to keep rising until 2045. By expanding and upgrading the transmission grid in Berlin’s metropolitan area, 50Hertz is fulfilling its social mandate to also secure the energy supply in the future.
Under Project 87, the Federal Requirements Plan Act (Bundesbedarfsplangesetz, BBPlG) establishes several measures in the capital region. One of the five key measures is the 380-kV Berlin South Vertical Power Link. It is a new tunnel construction project that will run between Brandenburg, close to the state border with Berlin in Großbeeren near Lichterfelde, and the Mitte substation in the Mitte district.
The 380-kV Berlin South Vertical Power Link was officially confirmed in the Federal Requirements Plan Act in 2022.