50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
  • Grid developement
    • Onshore projects
      • 380 kV overhead line Pasewalk – Bertikow
      • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
      • 380-kV overhead line Perleberg – Wolmirstedt
      • 380 kV overhead line Pulgar – Vieselbach
      • 380-kV Berlin diagonal power link
      • 380 kV overhead line "Nordring Berlin"
      • Third interconnector
      • Grid connection of the Jessen/Nord substation
      • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
      • SuedOstLink
      • South-West Interconnector
      • Uckermark Line
      • Grid reinforcement Mecklar-Vieselbach
    • Offshore projects
      • Combined Grid Solution
      • Hansa PowerBridge
      • Ostwind 2
      • Kontek 400-KV Grid Connection
      • Ostwind 3
    • Interconnectors and phase shifters
    • Concluded projects
      • 380-kV line Bärwalde – Schmölln
      • 380 kV grid connection to the Förderstedt substation
      • Baltic 1
      • Baltic 2
      • Wind Bus Bar
      • Ostwind 1
    • Why expand the grid?
      • Frequently asked questions
      • 50Hertz Energy Transition Outlook 2035
    • Planning criteria
      • Protection for people and nature
      • Bird protection
      • Overhead line and cable
      • Cost-effectiveness
    • Planning and approval process
      • Grid Development Plan (GDP) and Federal Requirement Plan
      • Planning and licensing
      • Transparency and public participation
    • Compensations for municipalities
    • Projects of Common Interest (PCI)
    • BESTGRID
      • 50Hertz pilot project
      • Publications
    • compactLine
  • System control
    • Grid control
    • System balancing
    • Grid availability
    • Redispatch
  • Grid operations
Show All
Home/Grid/Grid developement/Concluded projects/Baltic 2

Baltic 2

Map grid connection project Baltic 2 wind farm. Map: 50Hertz

Since September 2015, another offshore wind farm (OWF) has been producing renewable energy in the Baltic Sea: EnBW's Baltic 2 wind farm. 50Hertz transports the power generated at sea to land and integrates it in the transmission system. The 80 wind turbines of the offshore wind farm to the north of Rügen island can generate 1,200 gigawatt hours for approximately 340,000 households each year – saving 900,000 tonnes of CO2 .


See also the Combined Grid Solution

Volker Gustedt
CONTACT

Volker Gustedt

Press Officer
  • Tel:
    +49 (0) 30 5150-2878
  • E-Mail:
    volker.gustedt@50hertz.com
Technical specifications
Location of the OWF
32 kilometres to the north of Rügen island
Route length (total)
approx. 136 km
Cable length off/onshore
approx. 120 km / 16 km
Onshore connection point
Bentwisch substation near Rostock
Cable operator
50Hertz Transmission GmbH
OWF operator
EnBW Baltic 2 GmbH
OWF / cable status
Operational
Number of turbines in OWF
80
OWF capacity
288 MW (80 turbines of 3.6 MW each)

Video Baltic 2

Grid Connection of offshore wind farm Baltic II

  • ​VIDEO​​​

Flyer Baltic 2

  • DOWNLOAD PDF (1.2 MB - GERMAN)

Brochure Offshore

  • DOWNLOAD PDF (3.9 MB - GERMAN)
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login