50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • NordOstLink
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
          • Substations onshore/offshore
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Grid developement
    • Onshore projects
      • 380 kV overhead line Pasewalk – Bertikow
      • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
      • 380-kV overhead line Perleberg – Wolmirstedt
      • NordOstLink
      • 380 kV overhead line Pulgar – Vieselbach
      • 380-kV Berlin diagonal power link
      • 380 kV overhead line "Nordring Berlin"
      • Third interconnector
      • Grid connection of the Jessen/Nord substation
      • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
      • SuedOstLink
      • South-West Interconnector
      • Uckermark Line
      • Grid reinforcement Mecklar-Vieselbach
      • SuedOstLink+
      • Eulenberg substation
    • Offshore projects
    • Interconnectors and phase shifters
    • Concluded projects
    • Why expand the grid?
    • Planning criteria
    • Planning and approval process
    • Compensations for municipalities
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
  • System control
  • Grid operations
  • MCCSNG
Home/Grid/Grid developement/Onshore projects/380-kV overhead line Perleberg – Wolmirstedt

380-kV overhead line Perleberg – Wolmirstedt

New construction to increase current-carrying capacity: Perleberg – Stendal West – Wolmirstedt

50Hertz is planning the replacement of the available 220-kV line between Wolmirstedt and Güstrow with a current-carrying capacity of 1,070 amperes by a more powerful 380-kV line with a 3,600 ampacity. This is achieved through the construction and operation of a 106-kilometre-long 380-kV overhead line from substation Perleberg to substation Wolmirstedt, incorporating substation Stendal West. The existing 220 kV line from the 1950s (named after the "historical" direction of the current from south to north) is disassembled in the scope of the project. In many places, this happens before the new 380-kV line is constructed.

In addition to this replacement construction, conversion measures and new switchyards are needed in the connected substations. However, these are part of a separate Project.

CONTACT

Christoph Arnold

Public participation
  • Tel:
    +49 (0) 30 5150-3553
  • E-Mail:
    christoph.arnold@50hertz.com

Status of Perleberg-Wolmirstedt 380-kV overhead line

Need and legal background

Line approved in grid development plan

The existing 220-kV line from Wolmirstedt to Güstrow, built in the 1950s, no longer meets the requirements for the transmission of electricity. As a result of the continuing growth in RES installations, especially the construction of wind turbines both on- and offshore, the route's transmission capacity has to be increased. The line transmits electricity generated by RES installations in the north of the 50Hertz control area and by conventional power stations in the south of Germany.

This need was identified through the calculations of the 2012 grid development plan (GDP) and the necessity of expansion was confirmed in the 2013 GDP (scenario B): the transfer capacity of the current 220-kV line between Wolmirstedt and Güstrow is too low to meet the challenges to be expected for the next decade. The line faces higher loads due to the feed-in of on- and offshore wind power in Mecklenburg-Western Pomerania and greater transit flows from Denmark. Given the design and tower statics, it is not possible to rewire the line - in other words, replace the conductors - with more powerful high-temperature conductors. The weight of the high-temperature conductors alone is not compatible with the statics of the existing towers.

It is therefore necessary to incorporate a new installation, i.e. the Parchim Süd substation, in the section between Perleberg and Güstrow. This should make it easier for the line to take on onshore wind power from the downstream distribution systems, which also contributes to the higher load on the 220-kV line.

Freileitung Perleberg – Wolmirstedt. Foto: 50Hertz
Line Route

Existing route corridor is used

The course of the planned 380-kV line from Perleberg to Wolmirstedt will, wherever possible, follow the existing corridor of the 220-kV line through Brandenburg and Saxony-Anhalt. Exceptions are the subsections from Rochau to Schinne and Klein Möringen to Groß Schwarzlosen. Here, the new construction route runs parallel to the 380-kV line Lubmin-Stendal West and Stendal West-Wolmirstedt. The planned route was subdivided into three sections for approval. Detailed information is available in the publicly disclosed documents in the scope of the planning approval proceedings.

Line Perleberg – Stendal West (section Brandenburg)

The new 380-kV overhead line starts in the eastern city area of Perleberg. The line begins at tower no. 10 at the crossing of the existing 220-kV overhead line Wolmirstedt-Güstrow at Bundesstraße 5 near Spiegelhagen. Along the 220-kV line route, the new 380-kV overhead line should pass the towns of Düpow and Plattenburg in the direction of the Perleberg forest. Through the forest, up to the crossing at the state border with Saxony-Anhalt (at the Elbe), the new line should follow the existing forest aisle, which does not need to be widened. Between Garsedow and Schadebeuster, the 380-kV line reaches the river Elbe and therefore the state border with Saxony-Anhalt. The Elbe crossing towers, which were renovated a few years ago, will still be used. Only the tower peaks will be modified.

Line Perleberg – Stendal West (section Saxony-Anhalt)

Near Losenrade, to the west of the Elbe, the distance to a farm is increased, for the rest the new line runs along the old route in the direction of the south, until it meets the existing 380-kV Lubmin-Stendal West overhead line to the south-east of Seehausen. As both 380-kV lines can run parallel to each other in the future instead of crossing the 220-kV line as they do today, they will be suspended from five towers in a four circuit configuration over a short section.

From Biesehof on, both lines continue in parallel and the planned 380-kV Perleberg-Wolmirstedt line again follows the 220-kV route. Only in the sections between Rochau and Schinne as well as between Klein Möringen and the Stendal West substation, and from there on to Groß Schwarzlosen, the new 380-kV line leaves the existing 220-kV route to run in parallel to the existing Lubmin-Stendal West 380-kV line. From Klein Möringen on, a four-circuit section has to be constructed up to the Stendal West substation for technical reasons.

Line Stendal West – Wolmirstedt (Saxony-Anhalt)

The third section begins from the south side of the Stendal West substation on the territory of Insel. The planned 380-kV line should run to the east of the existing Stendal West-Wolmirstedt 380-kV line in south-easterly direction. From the eastern border of Groß Schwarzlosen, the new line can again follow the route of the existing 220-kV overhead line. In Uchtdorf, the routes split up again in the 220-kV Wolmirstedt-Güstrow line and the 380-kV Stendal West-Wolmirstedt overhead line. The new line should remain bundled with the Stendal West-Wolmirstedt 380-kV overhead line and follow its curve to the south-west.

The end point of the new overhead line is the Wolmirstedt substation.

Project status

All three planning approval proceedings have been initiated.

For each of the three sections of the planned 380-kV Perleberg-Wolmirstedt line to be approved, there is a state-specific planning approval procedure. Normally, the planning approval procedure is preceded by a regional planning procedure. For the replacement construction of the 380-kV overhead line from Perleberg to Wolmirstedt, an exemption was granted as the new line will for the most part follow the same route as the existing line.

Brandenburg

In Brandenburg, the planning approval proceedings were initiated by submitting the documents. The planning documents were available for public consultation from 3 March to 4 April 2014 in the offices of the cities Perleberg and Wittenberge, district Bad Wilsnack/Weisen and the municipality of Plattenburg.

The competent authority is the State Office for Mining, Geology and Raw Materials (LBGR) in Cottbus.

Saxony-Anhalt

For the part of the line in Saxony-Anhalt, there are approval procedures for two sections. In Saxony-Anhalt, the Administrative Office of Halle is competent.

For the section Stendal-Wolmirstedt, planning approval documents were available for public consultation from 4 March 2015 to 7 April 2015 in the cities of Stendal, Wolmirstedt, Tangerhütte and the municipality of Rogätz, part of the collective municipality of Elbe-Heide.

The planning approval documents for the section of Perleberg-Stendal West were available between 21 October and 20 November 2014 in Stendal and the municipality of Bismark.

After the documents have been disclosed to the public and agents of public concerns the procedures have been tested by the positions and objections submitted by the affected parties, a plan revision procedure was undertaken.

Currently 50Hertz is revising the renewed planning approval documents that were disclosed in for the section between Perleberg and Stendal in December 2018.

Within a renewed disclosure a public hearing was held from 20 to 23 November 2017 for the section between Stendal and Wolmirstedt. Afterwards the Administrative Office issued the planning approval decision in March 2018. After one of construction the power line was commissioned in May 2020.

Flyer: 380-kV overhead line Perleberg – Wolmirstedt (German)

  • ​DOWNLOAD PDF (465 KB)
Questions? We are here to answer

Citizens‘ Telephone

0800-58952472
Monday-Friday: 8AM-8PM
Free of charge from the German landline and mobile network
Comprehensive view

Newsletter

Keep up to date with the latest developments

SUBSCRIBE HERE
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login