50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Sustainability, Compliance and Human Rights
      Sustainability, Compliance and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Human rights
      • Notices & Reports
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
        • Eger-Elster line
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding SpPS
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing reserve
      Balancing reserve
      • Revenue opportunities
      • Technical requirements
      • Balancing reserve types
      • International cooperations
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding SpPS
Home/Grid/MCCS DSA

MCCS DSA

Die Energiewende und die Dekarbonisierung der Stromversorgung hat die sukzessive Einbindung erneuerbarer Energien und die Anwendung moderner, auf Leistungselektronik basierender Assets bei 50Hertz zur Folge. Mit dem gleichzeitigen Rückbau fossil betriebener Kraftwerke führt dies zu einem veränderten dynamischen Systemverhalten, dessen Stabilitätsgrenzen regelmäßig durch die Systemführung geprüft werden müssen. Wenn nötig, sollen dann auch entsprechende Gegenmaßnahmen automatisiert definiert und eingeleitet werden. 50Hertz plant aus diesem Grunde, zusätzlich zur statischen Sicherheitsbewertung eine dynamische Sicherheitsanalyse (DSA) einzuführen, welche die Herausforderungen der modernen Netzsituation in Bezug auf die Stabilität der Übertragungsnetze angeht.

Die Konzeptionierung und Einführung eines DSA-Tools ist ein umfangreiches Projekt bestehend aus mehreren Phasen, welches letztlich eine schrittweise Integration der Lösung in die Day-Ahead-, Intraday- und Real-Time Prozesse der 50Hertz Systemführung vorsieht. Es ist geplant, DSA als Modul in das „Modular Control Center System“ (MCCS) zu integrieren und in der 50Hertz Systemführung zu betreiben.

Da sich 50Hertz zum Thema DSA eng mit anderen Übertragungsnetzbetreibern abstimmt, können darüber hinaus Synergieeffekte genutzt und erfolgreiche Prozesse und Lösungen auch als Blaupause von der Gemeinschaft verwendet werden.

Angesichts der Größe, Komplexität und Wichtigkeit des Projekts ist 50Hertz daran interessiert, aktuelle Marktlösungen für die dynamische Sicherheitsanalyse zu eruieren. 50Hertz möchte diese Marktsondierung nutzen, um die Umsetzbarkeit unternehmenseigener Anforderungen sowie die Integrierbarkeit von DSA-Produkten zu prüfen. Daher möchten wir Sie bitten, die im Dokument „MEV_DSA_for_50Hertz.xlsx“ befindlichen Fragen bis zum 30. November 2023 für unsere Marktevaluation zu beantworten.

Das Dokument umfasst die nachfolgenden Themengebiete:

DSA-spezifische Fragen:

  • Industriekenntnisse und Erfahrungen mit DSA
  • RMS-Berechnungen
  • Dynamisierung von Netzmodellen
  • Berechnungsmethoden im Frequenzbereich (Modalanalyse)
  • Langzeitspannungsstabilität
  • Gegenmaßnahmen
  • Generelle Anforderungen

IT- & Architekturfragen:

  • Modularität, Schnittstellen-Programmierung und IT-Services
  • IT-Support

Wir würden uns über eine breite Beteiligung freuen und bitten Sie, Ihre Antwortdateien in englischer Sprache einzureichen. Bitte senden Sie diese als Excel-Dokument an pmo_mccs_nextgen@50hertz.com.

Wenn sie mehr über MCCS erfahren möchten, besuchen sie gern unsere MCCS-Grid Control Seite.

Downloads

  • MEV DSA FOR 50Hertz Download XLSX (605.99 KB)
  • MEV DSA MCCSNG EXT-SYSTEM INTEGRATION SCENARIOS Download PDF (826.18 KB)
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login