50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • NordOstLink
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
          • Substations onshore/offshore
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Structure
  • Roles
  • Business locations
  • Sustainability
  • Innovation
  • Partnerships
  • History
  • Strategy
    • Future. Renewable
    • Future. Economic
    • Future. Digital
    • Future. Thoughtful
Home/Company/Strategy/Future. Renewable

Future. Renewable: unlocking potential together

In consultation with the political world and society, 50Hertz is committed to boosting all potentials that are needed for its 100% renewables target by 2032. This means active support when it comes to unlocking extra renewable energy potentials on land and at sea. In doing so, 50Hertz drives the energy transition forward and facilitates the access to green electricity for established as well as for new industries in the grid area.

The share of renewals in the 50Hertz power grid will continue to grow constantly. Nevertheless, this increase can still accelerate and become even more dynamic. On the one hand, through improved dialogue with local stakeholders and on the other hand, through the effective use of renewable potentials in the field of wind and solar that exist but have not yet been ‘unleashed’ in the 50Hertz grid area. If we can achieve this, 100% regenerative energy in the power grid is possible by 2032! That is what we strive for.

By increasing the installed capacity of renewable energy in the grid area ...

Installierte Leistung Erneuerbarer im 50Hertz-Netzgebiet

... the 100% target can be reached by 2032.

Anteil Erneuerbarer bis 2032
.

Dr. Lutz-Christian Funke

Member of the 50Hertz Supervisory Board and Secretary-General of the KfW Bank Group

„Climate change marks the social and political debate. It is necessary to push the change towards a sustainable society forward with great determination. With its new strategy, 50Hertz makes an important contribution to the achievement of the German climate goals.“

Dr. Lutz-Christian Funke

Renewable energy in the 50Hertz grid area

Overview and current data for wind power 

Overview and current data for solar power

All data from the 50Hertz grid are also available on your smartphone via the 50Hertz app

Markus Graebig
You want to get in contact with us?

Markus Graebig

Corporate Development
  • E-Mail:
    anfrage@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login