50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
    • Roles
    • Sustainability, Compliance and Human Rights
      Sustainability, Compliance and Human Rights
      • Human rights
      • Occupational safety
      • Engagement
      • Notices & Reports
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • Berlin projects
          Berlin projects
          • 380-kV Berlin Diagonal Power Link: Reuter – Teufelsbruch
          • 380-kV Berlin North Vertical Power Link
          • 380-kV Berlin South Vertical Power Link
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
        • Eger-Elster line
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
      • Shared use of private property
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding SpPS
    • OT/IT Gateway
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing reserve
      Balancing reserve
      • Revenue opportunities
      • Technical requirements
      • Balancing reserve types
      • International cooperations
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Grid figures
        Grid figures
        • Total load
        • Vertical Grid Load
        • Peak load time windows
        • Annual energy extraction
        • Static grid model
        • Grid losses
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Countertrading
        • Outage and Maintenance
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
    • Onshore projects
    • Offshore projects
      • Grid connection OST-6-1
      • Hansa PowerBridge
      • Ostwind 2
      • Ostwind 3
      • Ostwind 4
      • LanWin3
      • Bornholm Energy Island
    • Interconnectors and phase shifters
    • Concluded projects
    • Planning criteria
    • Planning and approval process
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
    • Shared use of private property
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding SpPS
  • OT/IT Gateway
Home/Grid/Grid developement/Offshore projects/Grid connection OST-6-1

Grid connection OST-6-1

The OST-6-1 grid connection will connect the Gennaker offshore wind farm, located in the O-6 area designated for that purpose around 15 kilometres north of the Fischland-Darß-Zingst peninsula in the Baltic Sea, to the onshore 50Hertz transmission grid. The area to be connected is located in the territorial waters of Mecklenburg-Western Pomerania, i.e. within the 12 nautical mile zone. The cable route required for the grid connection up to the Gnewitz substation that is under construction in Mecklenburg-Western Pomerania will be up to around 90 km long in total, of which up to 53 km in the Baltic Sea and around 35 km onshore.


The Gennaker offshore wind farm, developed by Skyborn Renewables, will inject a total maximum output of 927 megawatts into the grid. That is why 50Hertz is constructing three submarine cable systems at the 220-kilovolt alternating current level, which will transport the generated wind power to the coast via two offshore substations.


You can find more about the project and the current planning status under “Status”.

Overview of grid connection
Location of the offshore wind farmAround 15 km north of the Fischland-Darß-Zingst peninsula or 24 km west of the island of Hiddensee
CapacityMax. 927 megawatts
Alternating current level220 kV
Off-/onshore route lengthAround 35 to 53 km / around 35 km
Onshore point of common couplingGnewitz substation
Operator of the grid connection50Hertz Transmission GmbH
Permitting authorityMinistry of Economy, Infrastructure, Tourism and Labour of Mecklenburg-Western Pomerania
Status of the approval proceduresThe approval process for the OST-6-1 grid connection was divided into four sections: the offshore substations, the section in the coastal waters, the onshore cable route and the Gnewitz substation. The required permits and approvals for all four sections have been obtained.
Expected completion date/according to § 17 (7) sentence 2 of the Energy Industry Act (Energiewirtschaftsgesetz, EnWG)1 July 2028

Status of the OST-6-1 grid connection

Line route

The cable route for the OST-6-1 grid connection runs around 53 km from the eastern offshore substation via the western offshore substation to the planned landing point on the territory of the municipality of Dierhagen. From there on, the onshore route of around 35 km in length leads up to the new substation to be constructed in Gnewitz.

Offshore route

Between the offshore substations and the landing point in Dierhagen, a line route was chosen that minimises the impact on nature and the environment. That is why the length of the route is as short as possible and is bundled with existing and planned lines to the greatest possible extent. Sensitive nature reserves and protected biotopes, such as the Darßer Schwelle Site of Community Importance (SCI), are bypassed where possible. Where a bypass is not possible, the impact is limited to the extent required.

Landing area

The landing area is planned in the municipal territory of Dierhagen. As the existing corridor that was approved in the spatial planning for this area is already completely occupied by other cable projects, a different landing area is needed for OST-6-1. The study to find a suitable landing area must take into account both the technical feasibility and the minimisation of potential effects on people and the environment.

Onshore route

From the planned landing area of the submarine cable in the municipal territory of Dierhagen, the electricity generated at sea will be transported to the new substation to be constructed by means of a 35-km underground cable. On the land side, three 220-kV AC underground cable systems will be laid within an already approved cable corridor of around 12-15 km. To meet the expected development needs in the Baltic Sea, the construction of an empty or protective conduit system along the route is also planned.

The underground cable route, which is still being planned, should follow as straight a line as possible and is subject to a number of spatial planning, environmental and other criteria. Intersections with other lines, buildings, residential areas, streets and gas mains shall for instance be avoided as much as possible. Nature conservation areas and forests shall also be circumvented.

Permits

50Hertz is legally obliged to connect the wind farms in the Baltic Sea and manage the overall electricity system throughout the federal states of Berlin, Brandenburg, Hamburg, Mecklenburg-Western Pomerania, Saxony, Saxony-Anhalt and Thuringia. The establishment of the grid connection for projects in territorial waters follows § 17d (6) of the Energy Industry Act (Energiewirtschaftsgesetz, EnWG).

The OST-6-1 grid connection is subdivided into four primary permit sections.

Permit for offshore substations, offshore and onshore route

The offshore substations, the section in the territorial waters and the onshore cable route were approved in three separate planning approval procedures. The responsible authority was the Ministry of Economic Affairs, Infrastructure, Tourism and Labour of Mecklenburg-Western Pomerania.

The planning approval procedure is a comprehensive and detailed permit review that, among other things, also grants the building permit for the project, in this case including the spatial planning review. Simply speaking, the planning approval procedure mainly deals with the “where” and “how” (specifying the location, structures, technical execution) of the construction project. During the permit procedure, the relevant authorities and public-interest organisations, environmental associations as well as the public are formally involved in accordance with legal requirements. Moreover, 50Hertz ensured early public participation, also referred to as citizen dialogue, even before the start of the planning approval procedure (see also More transparency and public participation).

Substation permit

The 220-kilovolt (kV) alternating current cables are connected to the German extra high voltage transmission grid in a substation, the so-called point of common coupling. The necessary transformation of the voltage level from 220 kV to 380 kV takes place in this substation.

The Gnewitz substation was approved by the Rostock district under the Federal Immission Control Act (Bundes-Immissionsschutzgesetz, BImSchG) and forms the end point of the OST-6-1 grid connection as well as the connection to the existing grid, which is furthermore being upgraded as part of the grid reinforcement of the Rostock region. You can find more information about this here (German only).

Cable laying

50Hertz is laying submarine cables between the offshore substations and the landing point in Dierhagen. From there on, onshore cables lead up to Gnewitz.

Offshore cable laying

During offshore cable laying, the water depth and the condition of the seabed are the main factors determining which technology is used. The seabed of the Baltic Sea was shaped by the ice age and has different characteristics from region to region. In many places, it consists of soft materials such as silt, sand and peat, in other places of hard materials such as clay, marl and stony soil. In case of soft soil conditions, the submarine cable is jetted or ploughed into the seabed. These methods are particularly gentle from the perspective of environmental protection and nature conservation. If the seabed is very hard, stony or very peaty, other laying tools such as cutters or excavators need to be used. Following the laying, the cable is once more covered with soil from the seabed.

Landing area

To protect the sensitive coastal area, it is undercut using the closed construction method of horizontal directional drilling (HDD). As part of this process, around 1.2 km of underground channels are drilled between an offshore construction site and an onshore construction site at a depth of up to 20 m. The cable conduits are then pulled into these channels, followed by the submarine cables at a later stage. During closed construction, the cables are laid underground without the need to excavate the soil.

Onshore cable laying

From the landing point on the Dierhagen municipal territory, the cable route runs to the Gnewitz substation over a distance of around 35 km in length. For the main part of the route, cables will be laid using the open construction method. This involves digging cable trenches, laying cable conduits and backfilling. The cables are pulled in at individual points during a later step. The original soil is reused if possible and restored in separate layers in the order in which they were originally found.

To minimise the impact of the construction measures, roads, railways or conservation areas are crossed using the closed construction method. This involves horizontal directional drilling and microtunnelling.

CONTACT

Dimitrij Umansky

Offshore Projects
  • Tel:
    +49 (0) 30 5150-6585
  • E-Mail:
    dimitrij.umansky@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Projects Newsletter
  • Elia Group External newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login