50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • NordOstLink
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
          • Substations onshore/offshore
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Grid Data
    • Installed capacity
    • Production & grid feed-in
    • Disclosure of EEG data
    • Congestion management
    • Balancing
  • Positions and Contact
Home/Transparency/Grid Data/Grid figures/Annual energy extraction

Annual energy extraction

Duty to disclose on 1 April of each year pursuant to § 27 para. 2 no. 3 of the StromNEV

The annual energy taken from the extra high-voltage grid (380/220 kV grid) or the EHV/HV transformation level of 50Hertz Transmission GmbH is calculated from the sum of all grid users in kWh in the period under review of a calendar year.
They form the basis for calculating the grid usage services of all grid users connected to the voltage levels of the respective withdrawal.

Grid/transformer levelYearly output energy [kWh] in 2021
EHV + EHV/ HV48,200,769,709
Proportion EHV/ HV41,284,022,772
Grid/transformer levelYearly output energy [kWh] in 2020
EHV + EHV/ HV46,170,879,812
Proportion EHV/ HV38,655,317,644
Grid/transformer level
Yearly output energy [kWh] in 2019
EHV + EHV/ HV
47,985,840,398
Proportion EHV/ HV
41,196,068,334
Grid/transformer level
Yearly output energy [kWh] in 2018
EHV + EHV/ HV
50,433,391,473
Proportion EHV/ HV
43,759,516,568
Grid/transformer levelYearly output energy [kWh] in 2017
EHV + EHV/ HV48,750,870,134
Proportion EHV/ HV42,909,192,494
Grid/transformer level
Yearly output energy [kWh] in 2016
EHV + EHV/ HV
51,458,501,623
Proportion EHV/ HV
46,225,659,317
Grid/transformer levelYearly output energy [kWh] in 2015
EHV + EHV/ HV52,376,168,838
Proportion EHV/ HV46,383,527,545
Grid/transformer levelYearly output energy [kWh] in 2014
EHV + EHV/ HV55,573,349,410
Proportion EHV/ HV49,390,728,207
Grid/transformer level
Yearly output energy [kWh] in 2013
EHV + EHV/ HV58,114,427,248
Proportion EHV/ HV52,055,457,082
Grid/transformer level
Yearly output energy [kWh] in 2012
EHV + EHV/ HV58,202,358,231
Proportion EHV/ HV52,309,526,563

Calendar - Work days for changes to the internal interchange           

Any subsequent changes made to the internal interchange schedule of the control area can be made until 16:00 of the work day following the date of performance.

Work days are Monday to Friday inclusive, with the exception of the following days:

  • New Year’s Day
  • Epiphany
  • Good Friday
  • Easter Monday
  • 1 May
  • Ascension Day
  • Whit Monday
  • Feast of Corpus Christi
  • Assumption Day
  • 3 October
  • Reformation Day
  • All Saint’s Day
  • Penance Day
  • Christmas Eve
  • Christmas Day
  • Boxing Day
  • New Year’s Eve
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login