50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • NordOstLink
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
          • Substations onshore/offshore
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Grid Data
    • Installed capacity
    • Production & grid feed-in
    • Disclosure of EEG data
    • Congestion management
      • Measures as per § 13 para. 1 EnWG (Conventional power plants)
      • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
      • Measures as per § 13 para. 2 EnWG
      • Commercial transactions to balance the redispatch balancing group
      • Archive Measures as per § 13 EnWG
      • Redispatch Calculator SWKL
      • Outage and Planning
    • Balancing
  • Positions and Contact
Home/Transparency/Grid Data/Congestion management/Outage and Planning

Outage and Planning

In order to be able to guarantee a constant and uninterrupted power supply, regular maintenance work, repairs and inspections of our network components are necessary. These are summarized here under the term revision.In addition to revisions, there may be unplanned potentially market-relevant outages in the transmission network of 50Hertz Transmission GmbH with an impact on trading capacities affecting network users of 50Hertz.In the following you will find an overview of unavailabilities due to the above mentioned reasons:

ACER RSS RSS
Beginn / Ende
March 2023
March 2023
MoTuWeThFrSaSu
272812345
6789101112
13141516171819
20212223242526
272829303112
3456789
March 2023
March 2023
MoTuWeThFrSaSu
272812345
6789101112
13141516171819
20212223242526
272829303112
3456789
Art
Ausfall Revision
Spannungsebene
110-kV 150-kV 220-kV 380-kV 400-kV
Netzelement
HGÜ Leitung Trafo
Sortierung
Datum Spannungsebene Netzelement Änderungsdatum
Einstellungen zurücksetzen
1-2 von 589 Ergebnissen
 1 2 3 4 5  ...  
Kategorie Revision
Revisions-ID D8-591/2023_1
Zeitraum 3/31/2023  8:00 AM - 3/31/2023  2:00 PM
Letzte Änderung 3/29/2023  2:57 PM
Spannungsebene 380-KV
Netzelement Streumen - Eula 585
Details
Kategorie Revision
Revisions-ID D8-459/2023_1
Zeitraum 3/30/2023  7:00 AM - 3/30/2023  5:00 PM
Letzte Änderung 3/29/2023  10:56 AM
Spannungsebene 380/220-KV
Netzelement Röhrsdorf Tr. 403
Details
1-2 von 589 Ergebnissen
 1 2 3 4 5  ...  

Information of the connecting transmission system operator in accordance with §17f Para. 3 EnWG (offshore)

The reports published on this page are updated quarterly. This page lists reports on interruptions to the offshore grid Connection.

Interruptions of the offshore grid connection (German) 

  • 2022 - Q4 Download PDF (70.42 KB)

Archive outage planning

The outages of the previous years can be downloaded here as PDF files.

Downloads (German)

  • GEPLANTE NICHTVERFUEGBARKEITEN 2006 Download PDF (10.04 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2007 Download PDF (10.12 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2008 Download PDF (10.11 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2009 Download PDF (10.11 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2010 Download PDF (45.28 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2011 Download PDF (45.42 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2012 Download PDF (52.18 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2013 Download PDF (23.36 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2014 Download PDF (22.52 KB)
  • GEPLANTE NICHTVERFUEGBARKEITEN 2015 Download PDF (22.28 KB)
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login