50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • NordOstLink
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
          • Substations onshore/offshore
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Grid developement
    • Onshore projects
      • 380 kV overhead line Pasewalk – Bertikow
      • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
      • 380-kV overhead line Perleberg – Wolmirstedt
      • NordOstLink
      • 380 kV overhead line Pulgar – Vieselbach
      • 380-kV Berlin diagonal power link
      • 380 kV overhead line "Nordring Berlin"
      • Third interconnector
      • Grid connection of the Jessen/Nord substation
      • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
      • SuedOstLink
      • South-West Interconnector
      • Uckermark Line
      • Grid reinforcement Mecklar-Vieselbach
      • SuedOstLink+
      • Eulenberg substation
    • Offshore projects
    • Interconnectors and phase shifters
    • Concluded projects
    • Why expand the grid?
    • Planning criteria
    • Planning and approval process
    • Compensations for municipalities
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
  • System control
  • Grid operations
  • MCCSNG
Home/Grid/Grid developement/Onshore projects/380 kV overhead line Pasewalk – Bertikow

380 kV overhead line Pasewalk – Bertikow

The 380 kV overhead line between Pasewalk and Bertikow should increase the capacity for electricity transport in the north-eastern part of the 50Hertz control area and guarantee the security of supply in this region for both companies and households following the energy transition. There is already a 220 kV high voltage line between Pasewalk and Bertikow. During gid development, 50Hertz will replace this line with a 380 kV overhead line. For the more powerful 380 kV overhead line, new pylons are constructed on the 40 km long route between the substations of Bertikow in Brandenburg and Pasewalk Nord in Mecklenburg-Western Pomerania. In order to enable the grid connection for a large number of wind turbines operated by Enertrag Netz GmbH, a substation will be built in Pasewalk Nord.

News

CONTACT

Dr. Andreas Paust

Public participation
  • Tel:
    +49 (0) 30 5150-3086
  • E-Mail:
    Andreas.Paust@50hertz.com
A 220 kV high voltage line between Pasewalk and Bertikow. Photo: Andreas Teich

Status 380 kV overhead line Bertikow-Pasewalk

The planned 380 kV overhead line between Bertikow and Pasewalk is a project in different federated states, i.e. Brandenburg and Mecklenburg-Western Pomerania. In the Federal Requirements Plan, the planned 380 kv overhead line is listed under no. 11 as "high voltage transmission line Bertikow-Pasewalk, three phase current nominal voltage 380 kV" and in the 2012 network development plan as measure 21. As such, the necessity of the project for the energy supply and the urgent need to guarantee secure and reliable grid operations has been laid down by law.

Necessity

Project in scope of Federal Requirements Plan

The need for grid capacity is determined by means of annual forecasts made by 50Hertz, based on a questionnaire sent to all distribution system operators and the operators of REA (Renewable Energy Act, in German: Erneuerbare-Energien-Gesetz) installations directly connected to the transmission system. The demand calculated by 50Hertz is based on the following REA feed-in capacities or REA energy being returned to the high voltage transmission grid.

Substationsin 2020
Substation Bertikow800 MW
Substation Pasewalk650 MW

Substation Bertikow: direct connection of wind farm and biomass installation
Substation Pasewalk: site shared with competent DSO

In the next few years, the capacity of the REA installations in the vicinity of the planned line will increase with nearly two gigawatts. This equals the capacity of two large-scale power plants. In the future, the planned generation by conventional power stations will also need to be transported. The exact composition of the feed-in forecast of lead scenario B 2022 for the different federated states is described in the adopted grid development plan 2012 (GDP, in German: Netzentwicklungsplan).

Line route

Mandatory bundling requires parallel routing

The planned 380 kV overhead line to connect Bertikow to Pasewalk has a total length of almost 30 kilometres, consisting of two sections, one of 20 kilometres in Brandenburg and one of 10 kilometres in Mecklenburg-Western Pomerania.

When planning the route, 50Hertz respected the bundling principle: environmental planning and nature conservation legislation requires that the impact on nature is kept to the absolute minimum. Therefore the new line follows, for the most part, the route of the current 220 kV line between the Bertikow substation (Brandenburg) and the substation Pasewalk (Mecklenburg-Western Pomerania). Deviations from the old route are possible to increase the distance to populated areas or to reduce the existing impact on the environment. The starting point of the line is located in Pasewalk in Mecklenburg-Western Pomerania, from where it heads south across the border with Brandenburg and continues to Bertikow, near Prenzlau.

After commissioning of the 380 kV overhead line and the appropriate testing period, the disassembly of the 220 kV line section is planned for those sections running parallel to the 380 kV line.

Approval process

Federal sectoral planning: application conference on 24 September 2014

As the competent authority for the procedure, the Federal Network Agency (FNA) held an application conference for the federal sectoral planning on 24 September 2014 in the city hall of Torgelow. The application conference is held to determine the study scope for the application for federal sectoral planning (according to § 8 of the Grid Expansion Acceleration Act (NABEG)). To this end, 50Hertz drew up documents (application for a permit as per § 6 NABEG), which were published by the Federal Network Agency. 

In an overview of all route corridor variants with bundling opportunities, 50Hertz summarised the different options determined for a route corridor. The analysis of the available spatial planning data allowed the identification of three basic trajectories in combination with existing infrastructures: with the highway in the east, along the existing high voltage transmission line in the centre and along an existing 110 kV overhead line in the west. As a result of intersections, a total of 13 variants resulted for a possible project corridor. 

The application conference was the first major step in the authorisation procedure. At the conference, the determined variants for the route corridor were explained and discussed. By involving all relevant regional institutions and the public, the Federal Network Agency determines which documents 50Hertz should edit before final official assessment. After the application documents have been drawn up in conformity with § 8 of the NABEG, the citizens and representatives of public interests will be able to consult the final planning documents for the last time in the scope of a formal participation procedure and express their objections and suggestions.

In conclusion of the federal sectoral planning, the FNA determines an environmentally compatible corridor with a width of 500 to 1000 metres, depending on local circumstances. The course of the corridor and the overhead line interconnection point between the federated states become part of the federal grid plan and are therefore binding for the subsequent planning and authorisation procedure.

A final route layout with exact pylon positions and heights can only be drawn up in the second phase of the authorisation procedure, i.e. the plan approval procedure initiated following the federal sectoral planning. In this planning and authorisation phase, the participation of the directly affected land owners plays an important role, as following the final route layout, the temporary or permanent use of the land can be considered and assessed in specific detail.

The regulations under which the overhead line construction is requested are laid down in the Grid Expansion Acceleration Act (NABEG), in the Federal Requirements Plan Act and other legislation. More information on the procedure can be found on the website of the NABEG and the federal sectoral planning.

Result of the Federal section planning – Route corridor (final)

As of 3 April 2018

  • DOWNLOAD PDF (3.72 MB)

Alternative route corridors, Federal sectoral planning

As of September 2017

  • DOWNLOAD PDF (2.27 MB)
View permit documentation

Documentation on federal sectoral planning according to § 8 NABEG

  • ​Decision on federal sectoral planning by the Federal Network Agency​​​
  • Explanatory report (Download as zip-file, 27 MB)
  • Spatial compatibility study (Download as zip-file, 35 MB)
  • Environmental report (Download as zip-file, 192 MB)

Further information

All information on the project's progress

  • BACKGROUND INFORMATION
  • MAPS
Comprehensive view

Newsletter

Keep up to date with the latest developments

SUBSCRIBE HERE
Questions? We are here to answer

Citizens‘ Telephone

0800-58952472
Monday-Friday: 8AM-8PM
Free of charge from the German landline and mobile network

Project 5 within the SuedOstLink as a "project of common interest" (PCI) of the European Union is crucial for the further improvement of security of supply and the expansion of renewable energies and receives funding.


The sole responsibility for the content of this website lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EACI nor the European Commission accept any responsibility for any use which may be made of the information contained therein.


Further information on EU funding for our projects can be found here:

  • ​PROJECTS OF COMMON INTEREST (PCI) ​​​
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login