50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Human rights
      • Notices & Reports
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid customers
  • Balancing group customers
  • Market communication
  • System services
  • Standard contracts
  • Suppliers
Home/Partners/Market communication

Market communication

EDIFACT market communication

In order to ensure equal treatment of all market partners on the German and European energy markets and to ensure transparency, traceability and unambiguity in market communication, an international standard is used for the exchange of business data: EDIFACT.

This data format enables automated technical processing of master data and dynamic data and, consequently, uniform and future-oriented market communication. All relevant energy data for balancing and billing can be exchanged between the various market players pursuant the processes defined by the Federal Network Agency.

In accordance with the ‘regulations on transmission channels’ (RezÜ), market communications must be encrypted and signed in order to meet the highest standards of data protection and data security. Below you will find our corresponding safety certificates and communication data sheets.

Market role: Transmission system operator
MP-ID: 9911845000009

transmission.edifact.zip
German certificate, Download zip file (1 KB)

EDI communication data sheet
Download PDF (18.1 KB)

Market role: Accounting coordinator
MP-ID: 9907297000002

edm.bk.abrechnung.cer
German certificate, Download (1 KB)

EDI communication data sheet
Download PDF (18.4 KB)

Market role: Distribution system operator
MP-ID: 9907492000005

data.edifact.cer
German certificate, Download (1 KB)

EDI communication data sheet
Download PDF (19 KB)

Contact data sheet
Download Excel file (55.5 KB)

Market role: Balance responsible party
MP-ID: 9905560000006

bkv.edifact.cer
German certificate, Download (1 KB)

EDI communication data sheet 
Download PDF (19 KB)

Market role: Supplier
MP-ID: 9910060000000

lf.edifact.cer
German certificate, Download (1 KB)

EDI communication data sheet
Download PDF (18.3 KB)

Contact data sheet
Download Excel file (49.5 KB)

Market role: Measuring point operator
MP-ID: 9910891000005

msb.edifact.cer

German certificate, Download  (1.35 KB)

EDI communication data sheet
Download PDF (19 KB)

Contact data sheet
Download Excel file (51 KB)

Smart meter data communication to EMP TSO

To set up 50Hertz as EMP you will need the following information.

Please note: during test operation, 50Hertz also receives data for testing purposes. Interested parties can contact us via Transmission@50hertz.com.

IP-Adresse EMP TSO:
IPv4:http://5.32.184.136:2040/
IPv6:http://[2a01:6ec0:0:2::136]:2040/

Download certificate

Certificate EMT ÜNB (TLS encryption signature)
Download gzip file (1KB)

Scheduling Management

The Exchange of schedules between Balance Responsible Parties (BRP) and Transmission System Operators (TSO) requires a secure communication channel. Please follow the link below to find the current rules for AS4 and E-Mail communication:

https://www.netztransparenz.de/en/Ancillary-Services/System-operations/Schedule-Management

For data exchange via E-Mail, please find attached the certificates:

Certificate Test Environment 

fahrplan_test-pub-27.cer.gz

Certificate Production Environment 

fahrplan_prod-pub-27.cer.gz

Contacts for each market role

CONTACT

50Hertz as Balancing Group Coordinator

MaBiS
  • Tel:
    +49 (0) 30 5150-2950
  • E-Mail:
    mabis.biko@50hertz.com
CONTACT

50Hertz as Transmission System Operator (TSO)

  • Tel:
    +49 (0) 30 5150-3782 
  • E-Mail:
    transmission@50hertz.com
CONTACT

50Hertz as Measuring Point Operator

  • Tel:
    +49 (0) 30 5150-4519 
  • E-Mail:
    msb@50hertz.com
CONTACT

50Hertz as system operator

MPES and WiM
  • Tel:
    +49 (0) 30 5150-4519
  • E-Mail:
    mabis.vnb@50hertz.com
CONTACT

50Hertz as Balance Responsible Party (BRP) and supplier

BRP / Supplier
  • Tel:
    +49 (0) 30 5150-2638
  • E-Mail:
    mabis.bkv@50hertz.com
 
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login