50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
    • History
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
  • Grid developement
    • Onshore projects
      • 380 kV overhead line Pasewalk – Bertikow
      • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
      • 380-kV overhead line Perleberg – Wolmirstedt
      • 380 kV overhead line Pulgar – Vieselbach
      • 380-kV Berlin diagonal power link
      • 380 kV overhead line "Nordring Berlin"
      • Third interconnector
      • Grid connection of the Jessen/Nord substation
      • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
      • SuedOstLink
      • South-West Interconnector
      • Uckermark Line
      • Grid reinforcement Mecklar-Vieselbach
    • Offshore projects
      • Combined Grid Solution
      • Hansa PowerBridge
      • Ostwind 2
      • Kontek 400-KV Grid Connection
    • Interconnectors and phase shifters
    • Concluded projects
      • 380-kV line Bärwalde – Schmölln
      • 380 kV grid connection to the Förderstedt substation
      • Baltic 1
      • Baltic 2
      • Wind Bus Bar
      • Ostwind 1
    • Why expand the grid?
      • Frequently asked questions
      • 50Hertz Energy Transition Outlook 2035
    • Planning criteria
      • Protection for people and nature
      • Bird protection
      • Overhead line and cable
      • Cost-effectiveness
    • Planning and approval process
      • Grid Development Plan (GDP) and Federal Requirement Plan
      • Planning and licensing
      • Transparency and public participation
    • Compensations for municipalities
    • Projects of Common Interest (PCI)
    • BESTGRID
      • 50Hertz pilot project
      • Publications
    • compactLine
  • System control
    • Grid control
    • System balancing
    • Grid availability
    • Redispatch
  • Grid operations
Show All
Home/Grid/Grid developement/BESTGRID/Publications

Publications

Below you can find reports and brochures on the 50Hertz pilot project as well as additional information on BESTGRID and its partners.

Publications regarding the 380-kV overhead line Bertikow-Pasewalk project can be found here. 

Publications on BESTGRID and the 50Hertz pilot Project

Final report 50Hertz pilot project

  • DOWNLOAD PDF (4.4 MB - GERMAN)

Final Report BESTGRID

  • DOWNLOAD PDF (2.4 MB)

Flyer BESTGRID

  • DOWNLOAD PDF (2.5 MB)

Guidelines public participation and transparency

  • DOWNLOAD PDF (1.1 MB - GERMAN)

Guidelines protecting nature

  • DOWNLOAD PDF (5.4 MB - German)
CONTACT

Dr. Danuta Kneipp

Head of Public Participation
  • Tel:
    +49 (0) 30 5150-2198
  • E-Mail:
    danuta.kneipp@50hertz.com

Final report on the 50Hertz pilot project by NABU Deutschland

  • DOWNLOAD PDF (1.7 MB - GERMAN)

Action Plan 50Hertz-Pilotprojekt

  • DOWNLOAD PDF (4.0 MB - GERMAN)

Electrical and magnetic fields: measure, classify, understand

  • DOWNLOAD (1.7 MB - GERMAN)

The sole responsibility for the content of this website lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.


Further information on the BESTGRID project can be found here:

  • WEBSITE BESTGRID
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login