50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • NordOstLink
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
          • Substations onshore/offshore
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Grid Data
    • Installed capacity
    • Production & grid feed-in
      • Production
      • Grid feed-in
      • Wind power
      • Photovoltaics
    • Disclosure of EEG data
    • Congestion management
    • Balancing
  • Positions and Contact
Home/Transparency/Grid Data/Production & grid feed-in/Production

Production in the 50Hertz grid area

Power plants and EEG installations are power producers. Production covers all available feed-in values and output forecasts for the electricity generated in our grid area.

On this page, you will find the archives of data on the electrical production capacity within the 50Hertz grid area for the years from 2010 to 2014 (forecasted as well as actually generated output) as well as the link to thetransparency.entsoe.eu for the respective data from they year 2015 onwards.

This data ist mainly relevant for electricity market traders and we publish it here in accordance with the Transperency Regulation (EU 543/2013).

50Hertz GmbH does not assume liability for the (output and forecast) data and the values determined on their Basis.

Forecast production output

The forecast production output is the sum of all existing production forecasts and schedules of power plants and EEG generators in the 50Hertz grid area for the subsequent day. At the current time, the production forecast does not fully reflect all power production assets of the grid area and is therefore incomplete as information about power plants feeding into downstream distribution systems is not included.

Below is an overview of the forecasted grid area load available from 2010 until 2014. This is available for download in Excel 97 format. Forecast values from the beginning of 2015 can be found at the ‘transparency platform’ of the European Network of Transmission System Operators for Electricity (ENTSO-E) at: transparency.entsoe.eu

Actual electrical production output

The actual electrical production output is the sum of all available feed-in from power plants and the extrapolated feed-in from EEG generators in the 50Hertz grid area. At the current time, it does not fully reflect all production assets of the grid area. It is incomplete to the extent that it partly lacks information on power plants feeding into downstream distribution systems.

Below is an overview of the forecasted grid area load available from 2010 until 2014. This is available as a download in Excel 97 format.
Values as of 2015 you will find at the ‘transparency platform’ of the European Network of Transmission System Operators for Electricity (ENTSO-E) at: transparency.entsoe.eu

Forecast production output 2010-2014

  • ERZEUGUNG-PROGNOSE 2010 Download XLS (855 KB)
  • ERZEUGUNG-PROGNOSE 2011 Download XLS (855 KB)
  • ERZEUGUNG-PROGNOSE 2012 Download XLS (857 KB)
  • ERZEUGUNG-PROGNOSE 2013 Download XLS (855 KB)
  • ERZEUGUNG-PROGNOSE 2014 Download XLS (855 KB)

Actual production output 2010-2014

  • ERZEUGUNG-IST 2010 Download XLS (855 KB)
  • ERZEUGUNG-IST 2011 Download XLS (855 KB)
  • ERZEUGUNG-IST 2012 Download XLS (857 KB)
  • ERZEUGUNG-IST 2013 Download XLS (855 KB)
  • ERZEUGUNG-IST 2014 Download XLS (855 KB)
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login