50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Grid developement
    • Onshore projects
    • Offshore projects
    • Interconnectors and phase shifters
    • Concluded projects
      • Ostwind 1
      • Combined Grid Solution
      • 380-kV line Bärwalde – Schmölln
      • 380 kV grid connection to the Förderstedt substation
      • Baltic 1
      • Baltic 2
      • Wind Bus Bar
    • Why expand the grid?
    • Planning criteria
    • Planning and approval process
    • Compensations for municipalities
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
  • System control
  • Grid operations
  • MCCSNG
Home/Grid/Grid developement/Concluded projects/Baltic 1

Baltic 1

Project map Baltic 1 offshore wind farm connection. Map: 50Hertz

The Baltic 1 grid connection links EnBW's offshore wind farm of the same name to the 50Hertz transmission system and is the first German offshore wind farm (OWF). It is located approximately 15 kilometres north of the Fischland-Darß-Zingst peninsula. 21 wind turbines generate a total of 185 gigawatt hours yearly, which could supply 50,000 households. The voltage is transformed in the Bentwisch substation near Rostock, and connected to the onshore grid by 50Hertz. EnBW Baltic 1 has been operational since 2 May 2011.

Technical specifications
Location of the OWF
15 kilometres to the north of Fischland-Darß-Zingst, inside the 12 nautical mile zone
Route length (total)approx. 77 km
Cable length off/onshore
approx. 61 km / 16 km
Onshore connection point
50Hertz Transmission GmbH
OWF operator
EnBW Baltic 1 GmbH
OWF / cable status
Operational
Number of turbines in OWF
21
OWF capacity
48.3 MW (21 turbines of 2.3 MW each)
Volker Gustedt
CONTACT

Volker Gustedt

Press Officer
  • Tel:
    +49 (0) 30 5150-2878
  • E-Mail:
    volker.gustedt@50hertz.com

Grid connection of the first German offshore wind farm in the Baltic Sea EnBW Baltic 1 

  • ​VIDEO​​​

Links

Website of the Grid Development Plan

  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login