50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Notices & Reports
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
    • Onshore projects
      • SuedOstLink
      • SuedOstLink+
      • NordOstLink
      • 380 kV overhead line Pasewalk – Bertikow
      • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
      • 380-kV overhead line Perleberg – Wolmirstedt
      • 380 kV overhead line Pulgar – Vieselbach
      • 380-kV Berlin diagonal power link
      • 380 kV overhead line "Nordring Berlin"
      • Third interconnector
      • Grid connection of the Jessen/Nord substation
      • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
      • South-West Interconnector
      • Uckermark Line
      • Grid reinforcement Mecklar-Vieselbach
      • Eulenberg substation
      • Grid reinforcement Teltow-Fläming
    • Offshore projects
    • Interconnectors and phase shifters
    • Concluded projects
    • Planning criteria
    • Planning and approval process
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding: State Estimator MCCS NextGen
Home/Grid/Grid developement/Onshore projects/380 kV overhead line Pasewalk – Bertikow/Background information

Background information

Flyer: 380-kV overhead line Bertikow – Pasewalk (German)

  • DOWNLOAD (1.6 MB)

Info letter: 380-kV overhead line Bertikow – Pasewalk 1st edition (German)

  • DOWNLOAD PDF (1.36 MB)

Info letter: 380-kV overhead line Bertikow – Pasewalk 2nd edition (German)

  • DOWNLOAD PDF (2.77 MB)

Event Documentation

Results of the event documentation in Prenzlau and Pasewalk

On 11 March 2014, 50Hertz informed Prenzlau and, on 13.March 2014, in Pasewalk the interested public of Brandenburg and Mecklenburg-Western Pomerania about the planned replacement of the 380 kV Bertikow - Pasewalk overhead line. The events marked the launch of a dialogue process to accompany the planning and expansion of the overhead line. The public showed lively interest in the event with around 80 representatives from civil society, politics, business and administration taking part in both events. Here you can download the documentation for all interested parties.

Documentation event Prenzlau 11.3.2014
Download in German as PDF (1,6 MB)

Documentation event Pasewalk 13.3.2014
Download in German as PDF (1,7 MB)

The information tour of the Dialogmobil: Infotour-Blog

From 9 to 17 October 2014, 50Hertz informed citizens in the area affected by the current planning status of the project as part of an information tour. Detailed reports on the course of the tour, its stations and the project were available in a blog about the information tour.

Visitors get informed by the Dialogmobil from 50Hertz. Photo: 50Hertz.
CONTACT

Dr. Andreas Paust

Public participation
  • Tel:
    +49 (0) 30 5150-3086
  • E-Mail:
    andreas.paust@50hertz.com

In the scope of the BESTGRID project, nine European partners, consisting of environmental protection associations and transmission system operators, work together with a research institute to advance understanding of the transmission grid expansion. This grid development project belongs to the four pan-European pilot projects, in which BESTGRID applies innovative forms of public dialogue. Its objective is to improve local and public understanding of the projects and to speed up the approval procedure insofar as possible.

  • Further information on BESTGRID at 50Hertz.com
  • ​WEBSITE BESTGRID​​​

Project of common interest

As a project of common interest (PCI) of the European Union, Project no. 5 of the SuedOstLink is decisive for the further improvement of the security of supply and the development of renewable energy and receives subsidies.


The sole responsibility for the content of this website lies with the authors. Neither the EACI nor the European Commission accept any responsibility for any use which may be made of the information contained therein.


More information about 50Hertz’s projects of European importance can be found here:

  • ​PROJECTS OF COMMON INTEREST (PCI) ​​​
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login