50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
    • History
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
Show All
Home/News/Full article: News of 50Hertz
26.11.2020 |
Press Release

50Hertz and SPIE will use lasers and sensors to detect eventual faults in overhead power lines

50Hertz and SPIE will use lasers and sensors to detect eventual faults in overhead power lines
Hightech in the air - helicopter with cameras and laser-technology on board. Photo: SPIE

With multi-sensor inspection flights by helicopter 50Hertz has begun to check its overhead power line network with a new type of tests to optimize the grid for the energy transition. Therefore the Transmission System Operation has concluded a multi-year framework contract with SPIE, a European market leader for multi-technical services in the areas of energy and communications.

Since July 2020, SPIE has scanned 1,465 kilometres of 50Hertz power lines by helicopter and gathered important data to improved maintenance and repair management and to record in detail the condition of the overhead power line network. The inspection makes it possible to more quickly assess any defects - for example, at bollards or conductors - or the distances between vegetation and power lines. Maintenance measures can therefore be instantly initiated. This, in turn, reduces the risk of line failures and helps to cut costs. The framework contract concluded between 50Hertz and SPIE will run for three years. It includes conducting flights and inspections of 50Hertz's entire overhead power line network in Germany, which is around 5,000 kilometres in length.

"For us, this process is more than simply a maintenance and servicing measure," says Dr. Frank Golletz, the Chief Technical Officer of 50Hertz. "Multi-sensor flights enable us to identify problems with the lines much more easily than ever before and initiate a swift and efficient response. The aim is to utilise our lines to the maximum permissible capacity so that as much electricity from renewable sources as possible can flow through them to our end users. This project, which fits seamlessly into our '60 to 100 by 2032' strategy for covering all the energy requirements in our grid area over the course of a year with renewables by 2032, will help us to achieve this."

Markus Holzke, CEO of SPIE Deutschland & Zentraleuropa: "The combination flight, which includes all the necessary sensor technology and delivers flawless data, is an innovative and efficient method we developed for assessing the condition of overhead power lines in just a single flyover. We came up with this idea together with our customer 50Hertz, and it has since proved highly successful in practice. This is a fantastic example of how sophisticated analysis technology can help to optimise infrastructure and deploy it in an economically efficient manner."

This project was motivated by the ever-increasing capacity utilisation of the existing power line network as part of the energy transition. This is why it is vital that it is always in perfect condition and that any problems or anomalies can be identified as quickly as possible. The methods used previously were extremely costly and time-consuming, and the new state-of-the-art inspection flights and on-board technology will help to speed up the processes.

The multi-sensor inspection flights are performed by a helicopter equipped with a range of sensor and camera systems. This includes laser scanning (LIDAR) capability as well as thermal and corona cameras. Corona cameras are special video cameras that are equipped with an additional UV-sensitive sensor and capable of detecting flaws invisible to the naked eye. A visual inspection of the lines is also performed during the flyover.

Thanks to this new procedure, around 78,000 photos of poles, fittings, connectors and damage have already been taken for assessing the condition of the overhead power lines operated by 50Hertz. Around 81 hours of video footage has also been recorded. The photo and video documentation has already helped to identify around 800 problems - whether visually or with the help of the infra-red or corona cameras - which now have to be assessed by specialists.

Download press release as pdf-file

Share via twitter via facebook via mail
previous news
next news
Volker Gustedt
Press Contact

Volker Gustedt

Pressesprecher/Press Officer
  • Phone:
    +49 (0) 30 51 50 2878
  • Mail:
    volker.gustedt@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login