50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions and Contact
  • Grid developement
    • Onshore projects
    • Offshore projects
    • Interconnectors and phase shifters
    • Concluded projects
      • 380-kV line Bärwalde – Schmölln
      • 380 kV grid connection to the Förderstedt substation
      • Baltic 1
      • Baltic 2
      • Wind Bus Bar
      • Ostwind 1
    • Why expand the grid?
    • Planning criteria
    • Planning and approval process
    • Compensations for municipalities
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
  • System control
  • Grid operations
  • MCCSNG
Home/Grid/Grid developement/Concluded projects/Ostwind 1/Background information

Background information

Offshore substation: Heart of Arkona wind farm

  • VIDEO

How 50Hertz progesses with Ostwind 1

  • VIDEO

Wind farm connector project Ostwind 1 on schedule

  • VIDEO

Removal of military waste along the submarine cable route (in German language)

  •  VIDEO

Flyer Ostwind 1

Our German flyer offers an overview of the different aspects of OWF grid connections in the Baltic Sea and provides particular information on the Ostwind 1 Project

  • DOWNLOAD PDF (6.9 MB)

Downloads (only in German)

  • 01 OSTWIND 1 – DATEN UND FAKTEN Download PDF (488.28 KB)
  • 02 OSTWIND 1 – HINTERGRUND ALLGEMEIN Download PDF (101.44 KB)
  • 03 OSTWIND 1 – HINTERGRUND BAU ON- UND OFFSHORE Download PDF (849.88 KB)
  • 04 OSTWIND 1 – HINTERGRUND KOMPENSATION Download PDF (794.06 KB)
  • 05 OSTWIND 1 – HINTERGRUND MUNITIONSBERGUNG Download PDF (601.3 KB)
  • 06 OFFSHOREBROSCHUERE Download PDF (3.91 MB)

Links

Website of the Grid Development Plan 

Information for ship navigation and water sports

Check information before departure 

Due to the cable-laying works, special conditions will apply for the shipping and fishing industries as well as for water sports in the Greifswalder Bodden area and coastal waters as of mid May 2016. For this reason, 50Hertz and the water police of Mecklenburg-Western Pomerania ask anyone visiting these waters to always check the most recent information before heading out in the interest of their own safety.

The CABLE ENTERPRISE, seen here during the loading of the first cable section, will lay the submarine cable in the deep water as from kilometre 39.

The construction measures in the scope of the cable-laying works along the 90-kilometre offshore route section include the following:

  • Installation of the individual submarine cable sections by large, slowly moving special barges 
  • Embedding the submarine cable into the seabed with cable jets or ploughs 
  • Partially parallel installation in surface water (Lubmin landfall point until kilometre 39 / higher Prorer Wiek bay) and deep water (as of kilometre 39 up to the substation platform) 
  • Selective dredging works immediately ahead of the cable and transport of the sediments the dumping area 551 (east of Usedom) 
  • Positioning of the laying barges using anchors - use of up to two anchor-handling vessels and a survey vessel, a tug as well as a transport vessel

The water police especially advises to respect the following rules:

  • Consistently adhere to the Maritime Shipping Lane Ordinance. 
  • Comply with the International Regulations for Preventing Collisions at Sea (Collision Regulations - Colregs).
  • Update nautical charts and rutters and keep them close at hand. 
  • Instruct your crew on the planned navigated area and its special characteristics. 
  • Travel at a safe speed and keep sufficient distance. 
  • Strictly follow the instructions of the crews of the traffic safety vessels.
Emergency telephone numbers to call during an emergency at sea:
Maritime Rescue Coordination Centre (MRCC) BremenT +49 (421) 53687 0
Bremen Rescue at VHF channels16 and 70 (DSC)
For all German mobile systems 1124124
Emergency numbersT 110 and 112
Water police inspection (WSPI) SassnitzT +49 (38392) 308-224
Water police inspection (WSPI) StralsundT +49 (3831) 2614-224
Water police inspection (WSPI) WolgastT +49 (3836) 2372-224

Info flyer

The info flyer "Ostwind 1 - submarine cable for Baltic Sea power" provides information on the special conditions for navigation and water sports that need to be taken into account during the cable laying works in the Baltic Sea.

  • DOWNLOAD FLYER (5.76 MB)

Navigational announcements

  • 01 BFS 116-2016 ZUM BAU DER KABELTRASSE Download PDF (38.09 KB)
  • 02 BFS 014-2016 ZUM BAU DES OWP WIKINGER Download PDF (50.47 KB)
  • 03 BFS 027-2016 ZUM BAU DES OWP WIKINGER Download PDF (58.47 KB)

Links

Navigational announcements (German website)

CONTACT

Yvonne Post

Public participation
  • Tel:
    +49 30 5150-3093
  • E-Mail:
    yvonne.post@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login