50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Notices & Reports
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
    • Onshore projects
    • Offshore projects
    • Interconnectors and phase shifters
    • Concluded projects
      • Kontek 400-KV Grid Connection
      • Ostwind 1
      • Combined Grid Solution
      • 380-kV line Bärwalde – Schmölln
      • 380 kV grid connection to the Förderstedt substation
      • Baltic 1
      • Baltic 2
      • Wind Bus Bar
    • Planning criteria
    • Planning and approval process
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding: State Estimator MCCS NextGen
Home/Grid/Grid developement/Concluded projects/Ostwind 1/Background information

Background information

Offshore substation: Heart of Arkona wind farm

  • VIDEO

How 50Hertz progesses with Ostwind 1

  • VIDEO

Wind farm connector project Ostwind 1 on schedule

  • VIDEO

Removal of military waste along the submarine cable route (in German language)

  •  VIDEO

Flyer Ostwind 1

Our German flyer offers an overview of the different aspects of OWF grid connections in the Baltic Sea and provides particular information on the Ostwind 1 Project

  • DOWNLOAD PDF (6.9 MB)

Downloads (only in German)

  • 01 OSTWIND 1 – DATEN UND FAKTEN Download PDF (488.28 KB)
  • 02 OSTWIND 1 – HINTERGRUND ALLGEMEIN Download PDF (101.44 KB)
  • 03 OSTWIND 1 – HINTERGRUND BAU ON- UND OFFSHORE Download PDF (849.88 KB)
  • 04 OSTWIND 1 – HINTERGRUND KOMPENSATION Download PDF (794.06 KB)
  • 05 OSTWIND 1 – HINTERGRUND MUNITIONSBERGUNG Download PDF (601.3 KB)

Links

Website of the Grid Development Plan 

Information for ship navigation and water sports

Check information before departure 

Due to the cable-laying works, special conditions will apply for the shipping and fishing industries as well as for water sports in the Greifswalder Bodden area and coastal waters as of mid May 2016. For this reason, 50Hertz and the water police of Mecklenburg-Western Pomerania ask anyone visiting these waters to always check the most recent information before heading out in the interest of their own safety.

The CABLE ENTERPRISE, seen here during the loading of the first cable section, will lay the submarine cable in the deep water as from kilometre 39.

The construction measures in the scope of the cable-laying works along the 90-kilometre offshore route section include the following:

  • Installation of the individual submarine cable sections by large, slowly moving special barges 
  • Embedding the submarine cable into the seabed with cable jets or ploughs 
  • Partially parallel installation in surface water (Lubmin landfall point until kilometre 39 / higher Prorer Wiek bay) and deep water (as of kilometre 39 up to the substation platform) 
  • Selective dredging works immediately ahead of the cable and transport of the sediments the dumping area 551 (east of Usedom) 
  • Positioning of the laying barges using anchors - use of up to two anchor-handling vessels and a survey vessel, a tug as well as a transport vessel

The water police especially advises to respect the following rules:

  • Consistently adhere to the Maritime Shipping Lane Ordinance. 
  • Comply with the International Regulations for Preventing Collisions at Sea (Collision Regulations - Colregs).
  • Update nautical charts and rutters and keep them close at hand. 
  • Instruct your crew on the planned navigated area and its special characteristics. 
  • Travel at a safe speed and keep sufficient distance. 
  • Strictly follow the instructions of the crews of the traffic safety vessels.
Emergency telephone numbers to call during an emergency at sea:
Maritime Rescue Coordination Centre (MRCC) BremenT +49 (421) 53687 0
Bremen Rescue at VHF channels16 and 70 (DSC)
For all German mobile systems 1124124
Emergency numbersT 110 and 112
Water police inspection (WSPI) SassnitzT +49 (38392) 308-224
Water police inspection (WSPI) StralsundT +49 (3831) 2614-224
Water police inspection (WSPI) WolgastT +49 (3836) 2372-224

Info flyer

The info flyer "Ostwind 1 - submarine cable for Baltic Sea power" provides information on the special conditions for navigation and water sports that need to be taken into account during the cable laying works in the Baltic Sea.

  • DOWNLOAD FLYER (5.76 MB)

Navigational announcements

  • 01 BFS 116-2016 ZUM BAU DER KABELTRASSE Download PDF (38.09 KB)
  • 02 BFS 014-2016 ZUM BAU DES OWP WIKINGER Download PDF (50.47 KB)
  • 03 BFS 027-2016 ZUM BAU DES OWP WIKINGER Download PDF (58.47 KB)

Links

Navigational announcements (German website)

  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login