50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
    • History
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
Show All
Home/News/Full article: News of 50Hertz
05.05.2020 |
Press Release

SuedOstLink: First award of contract for plastic-insulated underground cable for 525 kilovolts

SuedOstLink: First award of contract for plastic-insulated underground cable for 525 kilovolts
Laying of cables in open trench. Photo: NKT

Bayreuth/Berlin, 5 May 2020 – One of the energy transition's major grid expansion projects is taking another important step forward. The underground cable suppliers for the SuedOstLink direct current connection, which is around 500 kilometres long and will be between Wolmirstedt near Magdeburg in Saxony-Anhalt and Isar near Landshut in Bavaria, have been confirmed. The transmission system operators TenneT and 50Hertz, who are jointly implementing the direct current connection, have now awarded the contract to two cable manufacturers.

The contract went to NKT GmbH & Co. KG and Prysmian PowerLink S.r.I. In addition to manufacturing, it also includes laying the underground cables. SuedOstLink requires around 1,000 kilometres of the plastic-insulated underground cable for a voltage of 525 kilovolts (kV). The connection will have a transmission capacity of two gigawatts.

"The underground cables are the heart of SuedOstLink. By placing the order for the underground direct current cables, we have made good progress in implementing this important connection for the energy transition", emphasized Tim Meyerjürgens, Managing Director of TenneT. "We will use the innovative, plastic-insulated 525 kV underground cables for the first time worldwide and will thus set new standards in technology and the reduction of environmental impact."

With the higher voltage level, the cables can transmit more power than the conventional 320 kV cable systems. This requires fewer cables to transmit the same power; the route can be narrower and the necessary civil engineering work during the construction phase will decrease. This significantly reduces the impact on the environment.

"The extensive tendering process that started in 2018 ends with the award of the contract; the two successful companies can now go into production and plan the cable laying beginning in 2022. This is a good signal for the SuedOstLink joint venture project as well as for the energy transition across Germany and Europe", said Dr. Frank Golletz, Technical Director at the transmission system operator 50Hertz.

Orders involve extensive work

The companies commissioned are represented in numerous international projects. In Germany, their extra-high voltage cables connect a number of wind farms in the North and Baltic Seas to the German onshore transmission system grid. NKT is supplying the underground cables for the northern part of the SuedOstLink project through Saxony-Anhalt, Thuringia and Saxony. Prysmian PowerLink produces the underground cables for the Bavarian SuedOstLink section. The orders placed include the design, manufacture, delivery and laying of the underground cables, as well as the installation of the connecting sleeves and terminations and the final high voltage test of the cable system. In addition, the suppliers provide support in the detailed routing, specifically in determining the individual cable lengths and the locations of the connecting sleeves.

All bidders had to demonstrate the quality of their cables in an extensive prequalification test. The test simulated the operational load for the planned total operating time of around 40 years within a twelve month period. On the basis of the positive test results, the transmission system operators decided on the system voltage of 525 kV last year. Until then, a voltage of 320 kV was included in the planning as an alternative option.

Important connection for the energy Transition

SuedOstLink is currently undergoing the planning approval procedure. At the end of this procedure, the approval authority - the Bundesnetzagentur (Federal Network Agency for Electricity, Gas, Telecommunications, Post and Railway) - determines the exact course of the underground cable route. SuedOstLink should be completed by the end of 2025.

TenneT and 50Hertz are investing around five billion euros in the SuedOstLink project. The investments are amortised over 40 years. At the same time, SuedOstLink will help to reduce the costs of grid stabilisation measures, which are borne in full by electricity consumers. These costs are around 1.3 billion euros annually nationally. Grid stabilisation measures are necessary because the existing power grid is not designed for the growing share of renewable energy resources in power generation. With connections such as SuedOstLink, these costs are reduced because they will transport decentrally generated wind and solar power flexibly and safely to the customers.

SuedOstLink is a European Union "project of common interest" (PCI) and is funded within the "Connecting Europe" framework. Since 2012, its needs have been repeatedly confirmed in grid development plans and the Federal Requirements Plan Act. SuedOstLink will connect the north-eastern German states, with their high wind and solar power generation levels, to important industrial regions and consumption centres in Bavaria, and is crucial to further improve supply security, expand renewable energy sources and to achieve the 2030 and 2050 climate protection goals.

Download press release as pdf-file

Share via twitter via facebook via mail
previous news
next news
Volker Gustedt
Press Contact

Volker Gustedt

Pressesprecher/Press Officer
  • Phone:
    +49 (0) 30 51 50 2878
  • Mail:
    volker.gustedt@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login