50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Notices & Reports
      • Test Governance
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid Data
    • Installed capacity
    • Production & grid feed-in
      • Production
      • Grid feed-in
      • Wind power
      • Photovoltaics
    • Disclosure of EEG data
    • Congestion management
    • Balancing
  • Positions and Contact
Home/Transparency/Grid Data/Production & grid feed-in/Wind power

Wind power

Wind power in Germany is leading the way in the field of renewable electricity generation. In 2022, around 37.4 TWh of wind power were supplied across the 50Hertz grid area, with 33.8 TWh and 3.6 TWh of this total generated by onshore and offshore wind turbines, respectively.

Information about the installed wind power capacity across the 50Hertz grid area can be found here.

Verstärkung, Bestandsleitung, Exkursion, Projektdokumentation, Landschaft, Freileitung
Overhead line Röhrsdorf-Remptendorf 2015. Photo: Jan Pauls

The operators of the German energy supply grids are obliged by the EEG to feed in all electricity generated from renewable sources into the grid with a high priority. In order to maintain the balance between offer and demand, 50Hertz (as transmission system operator, TSO) has to compensate for the fluctuations in generational capacity which, at times, can be considerable.
As the TSO is responsible for the grid area in the eastern German states and Hamburg, 50Hertz ensures the permanent balance between the electricity offered and demanded - and therefore maintains a constant grid frequency, which is a decisive factor for supply security.

Below, you will find a summary relating to wind power in the 50Hertz grid area.

Grid area of 50Hertz Transmission: wind power specifications 2021 to 2022

Description20212022
Maximum wind power infeed16,728 MW16,885 MW
Minimum wind power infeed5 MW3 MW
Largest quarter-hourly jump in wind power+1,179 MW / -1,344 MW1,522 MW / 1,412 MW
Largest hourly jump in wind power+3,230 MW /-3,562 MW3,277 MW / -2,590 MW
Largest daily jump caused by wind power13,878 MW10,950 MW
Installed capacity of wind power plants onshore at the end of the year19,748 MW20,414 MW
Installed capacity of wind power plants offshore at the end of the year1,093 MW1,093 MW

The data from the table refer to wind power generational capacity, including direct marketing, and are based on the extrapolation of the actual figures (15 minute mean capacity figures).

The following forecasted and extrapolated data show the wind power being fed into the 50Hertz grid area.

These data are of particular interest for market players such as wind power electricity traders and direct marketers, but also for associations, politics or universities, which is why 50Hertz makes them publically available.

Current forecast

Current activity value: MW
Date:

The forecast values for wind power feed-in to the 50Hertz grid area are based on values from service providers. The data provided is always those of 09:00 hrs the previous day and the publication takes place daily at 18:00 hrs for the entire following 24 hours.

Based on the weather models (e.g. GFS, ECMWF) and the master data (geographic coordinates, address etc.) of the individual PV installations, physical as well as statistical capacities are calculated for the near future of up to eight days.

Forecast values per 15 minutes

For each 15 minute duration, a capacity value is supplied in megawatts (MW). A quarter of an hour for which no values are given, is entered as ‘not available’ (n.a.).

No data available.
Datum Von Bis Summe [MW] Onshore [MW] Offshore [MW]
Show more Show less

A table of the wind power feed-in values, including past values, is available here for download in CSV Format:

  •  
  •  
  •  

Extrapolation

Current activity value: MW
Date:
Extrapolated actuals per 15 minutes

The actual (onshore & offshore) wind power feed-in values in the 50Hertz grid area presented in the chart are determined by extrapolation of the current measured values from selected wind farms.

The 15 minute mean from the extrapolation is published as the capacity value in megawatts (MW) for the relevant quarter of an hour. A quarter of an hour for which no values are given, is entered as ‘not available’ (n.a.) up to and including 2008, and is given -1 as value as of 2009.

No data available.
Datum Von Bis Summe [MW] Onshore [MW] Offshore [MW]
Show more Show less

A table, including past values, is available here for download in CSV Format:

  •  
  •  
  •  

Here you can find our publications on wind power feed-in of the previous years:

Archive wind power

Forecast

  •  
  •  
  •  

Extrapolation

  •  
  •  
  •  
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login