50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Notices & Reports
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
    • Onshore projects
    • Offshore projects
    • Interconnectors and phase shifters
    • Concluded projects
      • Kontek 400-KV Grid Connection
      • Ostwind 1
      • Combined Grid Solution
      • 380-kV line Bärwalde – Schmölln
      • 380 kV grid connection to the Förderstedt substation
      • Baltic 1
      • Baltic 2
      • Wind Bus Bar
    • Planning criteria
    • Planning and approval process
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding: State Estimator MCCS NextGen
Home/Grid/Grid developement/Concluded projects/380-kV line Bärwalde – Schmölln

Upgrade of Bärwalde-Schmölln 380 kV line

The 380 kV line between Bärwalde and Schmölln has connected the Boxberg power plant to the German power grid for over 30 years. 50Hertz is replacing this line with a more modern 380 kV overhead line.

To minimise the impact on the landscape, it was decided to build the new line on the current 46 km long route. The construction work will be carried out while the existing line is still in operation. This sets high demands in the field of building logistics and industrial safety.
 The route of the current and new 380 kV line runs through the districts of municipalities Boxberg/Oberlausitz, Lohsa, Radibor, Neschwitz, Puschwitz, Crostwitz, Panschwitz-Kuckau, Burkau, Demitz-Thumitz, Schmölln-Putzkau, Nebelschütz, Guttau and the city of Bischofswerda.
 Even though construction is taking place on an existing route, 50Hertz had the environmental impact of the project studied in accordance with §3a of the Act on the Environmental Impact Assessment (EIA). For the construction of the upgraded 380 kV line between Bärwalde and Schmölln, the Land administration of Saxony (www.lds.sachsen.de) carried out the plan approval procedure, which was concluded on 18 February 2013. The approval of the plan establishes the compensation measures for landscape conservation necessary to compensate for the construction Project.

CONTACT

Dr. Dirk Manthey

Public participation
  • Tel:
    +49 (0) 30 5150-3419
  • E-Mail:
    dirk.manthey@50hertz.com
The route of the current and new 380 kV line runs through the districts of municipalities Boxberg/Oberlausitz, Lohsa, Radibor, Neschwitz, Puschwitz, Crostwitz, Panschwitz-Kuckau, Burkau, Demitz-Thumitz, Schmölln-Putzkau, Nebelschütz, Guttau and the city of Bischofswerda. photo: 50Hertz

Status 380-kV line Bärwalde – Schmölln

Need

From Boxberg over Radibor and the A4 in the direction of Bischofswerda

The route begins in the Bärwalde substation (municipality of Boxberg), in the Görlitz district. From there, it runs southward through the forest of Milkeler Heide, where it crosses national road 108 and the Horka-Hoyerswerda railway section. Here, it also runs parallel to the 380 kV line connecting Streumen to Bärwalde.

To the west of the ponds of Rauden, the route crosses the Kleiner Spree lowland to pass west of the municipality of Milkel. The route crosses the S106 and continues west of the ponds of Milkel. South-west of Lomske, the line turns away in south-westerly direction and runs on between the ponds of Neschwitz and Großdubrau. Further on, it passes to the north of Radibor, after which the 380 kV line spans district road 7282 and the B96.
 From the B96 on, the route runs west, parallel to a 110 kV line.To the south of Luga, the line spans the "Milkwitzer Wasser" river and the "Hoyerswerdaer Schwarzwasser" further south-west.

South-east of Crostwitz, the 380 kV line veers south-west across several tributaries of the "Kleinhänchner Wasser" river. On the north-western side of Uhyst am Taucher, the line spans the A4 motorway and a few arms of the "Klosterwasser" river. West of Burkau, the route first intersects with a 110 kV line, which it then follows, along with another overhead line.
 Before it reaches the B6, all three lines turn away south, continuing south by south-west, passing west of the urban forest of Bischofswerda. The lines cross the railway sections of Bischofswerda-Bautzen and Bischofswerda-Schmölln-Putzkau. All three lines end at the Schmölln substation, east of Bischofswerda.

Montage von Masten
In late August, the partially pre-installed tower segments were bolted together near Radibor. To the right, you can see the old tower with the partly dismantled crossarm (left), while the system on the right side is still in operation. Photo: 50Hertz

The plan approval procedure for the upgrade of the 380 kV line between Bärwalde and Schmölln was concluded with the key planning decision of 18 February 2013 by the Land administration of Saxony, the authority responsible for the procedure. In the scope of the plan approval procedure, all plans, drawings and explanations related to the application for the planning approval procedure were available for consultation from 29 May to 29 June 2012 in the municipalities of Boxberg/Oberlausitz, Lohsa, Radibor, Neschwitz, Puschwitz, Crostwitz, Panschwitz-Kuckau, Burkau, Demitz-Thumitz, Schmölln-Putzkau, Nebelschütz, Guttau and Bischofswerda. The deadline to submit objections ended two weeks after the consultation round, i.e. on 13 July 2012.

For a detailed study on the environmental effects, an environmental impact assessment (EIA, German) and an accompanying landscape conservation plan (LCP, German: “LBP”) were drawn up in the scope of the plan approval procedure. As such, the effects of the project on nature and landscape could be determined.

Commissioning

The expansion works for the 380 kV overhead line between Bärwalde and Schmölln started in May 2013 and were completed by the end of October 2014: on 24/11/2014, 50Hertz included the renovated line in its regular Operation. 

Construction timeline

In August 2013, the first foundations were placed and the towers were stored on site after the construction sites had been cleared and set up. Before the building operations began, an initial public consultation was held on 16 April 2013.

The construction took place while the system was operational. This was possible by first powering down and dismantling one side or circuit of the existing route. On the disconnected side, the new pylons were constructed and fully equipped on one side. The new circuit then went operational and the second circuit of the existing line could be switched off and disassembled. This created the necessary space to install the second circuit of the new line.

During the new construction, the spans were adjusted to meet current regulations. Their length was increased to 350-500 metres, reducing the number of pylons from 108 to 106. The new lattice towers are two-level pylons, i.e. having two crossarms. Because of the deviated route for the new pylons, the centre line was moved approx. 10 metres.

40% more transmission capacity for the Bärwalde-Schmölln 380 kV line

The current 380 kV line between the substations of Bärwalde and Schmölln was constructed in the days of the DDR. At present, it no longer meets requirements. The existing route, with a length of 46 km, can nevertheless be used to construct a new 380 kV line. As a result, the transmission capacity of this new 380 kV overhead line is increased by 40%. 50Hertz considers the construction of an expanded 380 kV line between Bärwalde and Schmölln instrumental for two main reasons: in Boxberg, a new block with a capacity of 675 MW will be put into operation at the turn of the year (late 2011/early 2012). This will bring the installed capacity of the Boxberg power station to 2,575 MW. In addition, the share of renewables in the grid increases by leaps and bounds every year. The construction of the new 380 kV overhead line and the raised transmission capacity allows for an increase in electricity transport capacity in the southeast of Germany.

Line route

Line route - section 1

  • DOWNLOAD PDF (1.21 MB)

Line route - section 2

  • DOWNLOAD PDF (1.0 MB)
Planning and approval process

Downloads

  • ENVIRONMENTAL IMPACT ASSESSMENT AND LANDSCAPE CONSERVATION PLAN-SCHMÖLLN Download PDF (18.62 MB)
  • PLANNING APPROVAL PROCEDURE Download PDF (838.51 KB)
Construction and commissioning

Commissioning of the upgraded new 380 kV overhead line between Bärwalde and Schmölln

  • VIDEO
Questions? We are here to answer

Citizens‘ Telephone

0800-58952472
Monday-Friday: 8AM-8PM
Free of charge from the German landline and mobile network
Comprehensive view

Newsletter

Keep up to date with the latest developments

SUBSCRIBE HERE
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login