50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Media library
  • Contact
  • Press releases
Home/Media/Contact

Contact

Kerstin Maria Rippel
CONTACT

Kerstin Maria Rippel

Director Communications & Public Affairs
  • Tel:
    +49 (0) 30 5150-0
  • E-Mail:
    presse@50hertz.com
Katrin Dietl
CONTACT

Katrin Dietl

Press Officer
  • Tel:
    +49 (0) 30 5150-4277
  • E-Mail:
    katrin.dietl@50hertz.com
Volker Gustedt
CONTACT

Volker Gustedt

Press Officer
  • Tel:
    +49 (0) 30 5150-2878
  • E-Mail:
    volker.gustedt@50hertz.com
CONTACT

Johanna Martens

Social Media Manager and Press Relations
  • Tel:
    +49 30 5150-2944
  • E-Mail:
    johanna.martens@50hertz.com
Anne-Sophie König
CONTACT

Anne-Sophie König

Social Media Manager and Press Relations
  • Tel:
    +49 (0) 30 5150-2902
  • E-Mail:
    anne-sophie.koenig@50hertz.com
CONTACT

Volker Kamm

Currently on sabbatical
  • Tel:
    +49 30 5150-3417
  • E-Mail:
    volker.kamm@50hertz.com

Contacts for grid extension projects at 50Hertz

CONTACT

Dr. Dirk Manthey

Grid connection of the Jessen/Nord substation, South-West Interconnector, 380 kV grid connection to the Förderstedt substation, Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf, 380-kV line Bärwalde – Schmölln
  • Tel:
    +49  (0) 30 5150-3419
  • E-Mail:
    dirk.manthey@50hertz.com
CONTACT

Axel Happe

SuedOstLink, 380 kV overhead line "Nordring Berlin" 
  • Tel:
    +49  (0) 30 5150-3414
  • E-Mail:
    axel.happe@50hertz.com
CONTACT

Dorit Rößler

Netzausbau Hamburg/Ost – Ämter Büchen/Breitenfelde/Schwarzenbek-Land
Substation Berlin/Südost
Substation Hamburg/Ost
Substation Beetzsee Nord
  • Tel:
    +49  (0) 30 5150-2235
  • E-Mail:
    dorit.roessler@50hertz.com
CONTACT

Marie Bartels

380 kV overhead line Pulgar – Vieselbach
  • Tel:
    +49 (0) 30 5150-2162
  • E-Mail:
    marie.bartels@50hertz.com
CONTACT

Christoph Arnold

380-kV overhead line Güstrow – Parchim Süd – Perleberg
380-kV overhead line Perleberg – Wolmirstedt
  • Tel:
    +49  (0) 30 5150-3553
  • E-Mail:
    christoph.arnold@50hertz.com
Dr. Andreas Paust
CONTACT

Dr. Andreas Paust

Grid reinforcement of 380-kV high-voltage transmission line Helmstedt – Wolmirstedt 
  • Tel:
    +49 30 5150-3086
  • E-Mail:
    Andreas.Paust@50hertz.com
CONTACT

Britta Petersen

Berlin diagonal power link
  • Tel:
    +49 (0) 30 5150-3420
  • E-Mail:
    britta.petersen_ext@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login