50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • NordOstLink
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
          • Substations onshore/offshore
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Grid customers
  • Balancing group customers
  • Market communication
  • System services
  • Standard contracts
  • Suppliers
    • SAP Business Network
    • Frequently Asked Questions
    • Downloads
  • EEG registration
Home/Partners/Suppliers/alt Downloads

Downloads

Read more

  • SUPPLIER PORTAL
  • FAQ FOR THE SUPPLIER PORTAL

General Purchasing Terms and Conditions 50Hertz 

  • 01 GENERAL (AS OF 3-2017) Download PDF (203.49 KB)
  • 02 SERVICES (AS OF 3-2017) Download PDF (299.76 KB)
  • 03 DISPOSAL SERVICES (AS OF 3-2017) Download PDF (254.57 KB)
  • 04 TEMPORARY EMPLOYMENT (AS OF 3-2017) Download PDF (149.32 KB)
  • 05 ENGINEERING (AS OF 3-2017) Download PDF (277.5 KB)
  • 06 IT (AS OF 3-2017) Download PDF (267.59 KB)
  • 07 SUPPLY OF HIGH VOLTAGE COMPONENTS (AS OF 3-2017) Download PDF (291.29 KB)
  • 08 ESCROW AGREEMENT Download PDF (88.05 KB)
  • 09 INVOICING REQUIREMENTS (AS OF 3-2020) Download PDF (635.23 KB)
  • 10 TEMPLATE CONTRACT FOR DATA PROCESSING GDPR (AS OF 3-2019) Download PDF (176.74 KB)
  • 11 HANDOUT CREDIT MEMO PROCEDURE (AS OF 12-2016) Download PDF (852.83 KB)
  • 12 SUPPLIER CODE OF CONDUCT Download PDF (434.14 KB)
  • 13 CONDITIONS OF USE VIRTUAL IT WORKSPACE (AS OF 08-2019) Download PDF (415.3 KB)

Since June 2021 a new version of the General Purchasing Conditions is applicable for the purchasing of IT and Electrical Equipment (see table below). For smaller purchases we have developed a short version set of the general and specific terms and conditions. 

For the other purchasing categories the previous version remain applicable. For any question relating to these new General Purchasing Conditions, please contact your usual contact person at the Purchasing Department.

The English versions of the GENERAL PURCHASING CONDITIONS (FOR IT respectively FOR THE SUPPLY (AND INSTALLATION) OF ELECTRICAL EQUIPMENT) and the English versions of the applicable SPECIFIC PRUCHASING CONDITIONS (FOR IT respectively FOR THE SUPPLY (AND INSTALLATION) OF ELECTRICAL EQUIPMENT) incorporated into the Contract shall prevail in case of discrepancies between the original English versions and its translations (German). Deviating from this, only the German language shall be authoritative for the GENERAL PURCHASING CONDITIONS SHORT VERSION and the SPECIFIC PRUCHASING CONDITIONS SHORT VERSION.  

General and specific purchasing conditions Elia Group 

  • 01 GENERAL PURCHASING CONDITIONS SHORT VERSION Download PDF (158.02 KB)
  • 02 SPECIFIC PURCHASING CONDITIONS SHORT VERSION – GERMANY Download PDF (96.64 KB)
  • 03 GENERAL PURCHASING CONDITIONS FOR IT Download PDF (635.67 KB)
  • 04 SPECIFIC PURCHASING CONDITIONS FOR IT – GERMANY Download PDF (295.32 KB)
  • 05 SPECIFIC PURCHASING CONDITIONS FOR IT – BELGIUM Download PDF (395.4 KB)
  • 06 GENERAL PURCHASING CONDITIONS FOR THE SUPPLY (AND INSTALLATION) OF ELECTRICAL EQUIPMENT Download PDF (718.57 KB)
  • 07 SPECIFIC PURCHASING CONDITIONS FOR THE SUPPLY (AND INSTALLATION) OF ELECTRICAL EQUIPMENT Download PDF (387.57 KB)
  • 08 SPECIFIC PURCHASING CONDITIONS FOR THE SUPPLY (AND INSTALLATION) OF ELECTRICAL EQUIPMENT – BELGIUM Download PDF (400.4 KB)

Documents for the 50Hertz supplier portal and the P2P process

  • 01 FREQUENTLY ASKED QUESTIONS SAP BN Download PDF (1.08 MB)
  • 02 MANUAL ACCOUNT SET-UP SAP BN Download PDF (1.67 MB)
  • 03 MANUAL CREATE ORDER CONFIRMATION SAP BN Download PDF (1.3 MB)
  • 04 HANDOUT CREATE SHIP NOTICE SAP BN Download PDF (920.67 KB)
  • 05 HANDOUT SEND A SERVICE ENTRY SHEET SAP BN Download PDF (1.01 MB)
  • 06 HANDOUT SEND AN INVOICE SAP BN Download PDF (1.02 MB)
  • 07 USER MANUAL SAP BUSINESS NETWORK Download PDF (1.85 MB)
  • 08 HANDOUT CREDIT MEMO PROCEDURE (AS OF 12-2016) Download PDF (852.83 KB)
CONTACT

50Hertz Purchasing

Heidestraße 2 | 10557 Berlin
  • Tel:
    +49 (0) 30 5150-0
  • E-Mail:
    purchasing@50hertz.com

Occupational safety

Learn more about occupational safety at 50Hertz.

  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login