50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • NordOstLink
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
          • Substations onshore/offshore
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Structure
  • Roles
  • Business locations
  • Sustainability
    • CSR Portal
    • Occupational safety
    • Engagement
    • Governance
  • Innovation
  • Partnerships
  • History
  • Strategy
Home/Company/Sustainability/Engagement

Engagement

In its grid area, 50Hertz primarily supports projects that promote a diverse cultural landscape, serve to protect nature or meet social demands. In some cases, partnerships are also promoted in other thematic areas, such as sports.

We enter into long-term sponsoring partnerships in order to achieve the greatest possible benefit and sustainable economic effect for society, the region, its citizens and our company.

Collaboration between 50Hertz and a school to create an educational nature path and bee cart. Photo: Jan Pauls

Regarding donations, we support concerns about promoting young talent, education, sport, social affairs, culture and the environment in our grid area. It is important to us that the projects supported have a positive influence on the local living environment.

To maintain our independence, we do not support individuals or political parties. Our commitment for sponsoring and donations can only take place within our grid area which includes the German federal states of Brandenburg, Mecklenburg-Western Pomerania, Saxony, Saxony-Anhalt and Thuringia, as well as the city states of Berlin and Hamburg.

Tour at 50Hertz – Cooperation with the National Gallery, National Museums in Berlin

In cooperation with the Nationalgalerie, Staatliche Museen zu Berlin, 50Hertz supports graduates of art schools in our network area. With the exhibition series Rundgang 50Hertz, young positions of contemporary art are promoted and presented to the public. Since 2017, there has been an annual exhibition of selected graduation works created at the art colleges in Berlin, Leipzig and Hamburg. These can be seen digitally at rundgang50hertz and live for a few days at Hamburger Bahnhof.

Exhibition series "Rundgang 50Hertz": Opening 2017. Photo: Jan Pauls
Innovation Partner Concert Hall Berlin

As an innovation partner, 50Hertz supports digitization projects of the concert hall in particular.

Mecklenburg-Western Pomerania Festival

In the framework of the Mecklenburg-West Pomerania Festival each spring and summer numerous events take place in the German federal state of Mecklenburg-West Pomerania. 50Hertz is repeatedly sponsoring a number of concerts during the current festival season

Interactive exhibit „Energie gemeinsam wenden“ (Changing energy together)

„Energie gemeinsam wenden“ (Changing energy together) is the title of an interactive exhibit developed by 50Hertz and the Independent Institute for Environmental Issues (Unabhängiges Institut für Umweltfragen e.V.) and used at schools in Mecklenburg- West Pomerania for spring 2013. Thus, students of the fifth and sixth grade playfully learn about the energy transition.

Rennsteig Autumn Run

Since 2011, 50Hertz has supported the annual Rennsteig Autumn Run in the Thuringian Forest. More than 500 runners conquer the 20.5 kilometre long course through the Thuringian Forest.

Rennsteig Autumn Run 2015. Photo: 50Hertz
Young biathletes - SV Schorfheide Groß Schönebeck e. V.

50Hertz supports the young biathletes of the sports club Schorfheide in the south of the Brandenburg Uckermark. In a hilly area, the youngest "biathinos" learn Nordic winter sports with the support of 50Hertz so that one day they can run at the top.

Young volleyball talents - VFB 91 Suhl e. V.

In Thuringia, 50Hertz supports the young female volleyball players ofVfB 91 Suhl e. V.

  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login