50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Notices & Reports
      • Test Governance
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding: State Estimator MCCS NextGen
Home/Grid/Market sounding: State Estimator for MCCS NextGen

Market sounding: State Estimator for MCCS NextGen

The current situation in the energy world is characterized by numerous political, social, and technical challenges and changes. The energy system is transforming and requires a higher and better integration of renewables. This also implies the increase of measurable and controllable units and at the same time the need to deal with rapidly growing data. There is a need for new complex functionalities, and likewise an increasing need for system monitoring, system state analysis, decision support and automation to deal with the volume of events and actions in the electrical system.

With MCCS NextGen, 50Hertz plans to completely replace all application software systems and integration technologies in its system operation, including SCADA, EMS, LFC, CMS, scheduling, etc., as well as adding or enhancing relevant capabilities such as dynamic system analysis, dynamic voltage management, topology optimization, online analytics and more. Associated with MCCS NextGen is a strict focus on modularization of applications, loose data- and event-driven coupling of modules, and flexible integration of modules.

MCCS NextGen will be shared by 50Hertz as a vision, architecture, and reference solution with peers (e.g., other international TSOs) in a MCCS NextGen community, becoming a blueprint for 50Hertz and other TSOs and community partners to quickly respond to the increasing change needs in electric (and other) infrastructure management applications.

For further information about MCCS please check: https://www.50hertz.com/en/Grid/MCCSNG

One module of MCCS will be the online “State Estimation” as part of the Grid Analysis Suite. This market sounding aims to identify potential vendors for a State Estimation solution that fits within the modular approach of MCCS.

As can be seen in the illustration below, we are not necessarily aiming to procure all necessary parts of a State Estimation, but focus on the core calculation capabilities. Since MCCS has its own unified user interface, the State Estimation does not necessarily need to be delivered with an inbuild UI. Also, the Topology Processing is needed for various MCCS modules and therefore does not necessarily have to be part of the State Estimation Module, as it will be provided by MCCS.

Figure 1: Overview of a State Estimation process and the different parts a State Estimation solution consists of.

Given the size, complexity and importance of the project, 50Hertz is interested in exploring current market solutions for State Estimation solutions. 50Hertz would like to use this market sounding to assess the feasibility of its specific requirements as well as the integrability of State Estimation solutions. Therefore, we would like to ask you to answer the questions in the document "Market Sounding State Estimation.xlsx" by 09. February 2024 for our market evaluation.

The document covers the following topics:

  • Industry Knowledge and Experience
  • General Requirements
  • Topology Processing & Plausibility Check
  • Observability Analysis
  • State Estimation Solution
  • Bad Data Handling
  • User Interface
  • Additional functionalities


IT- & Architecture topics:

  • Modularity, Programming Interfaces and IT-Services
  • IT-Support

We would appreciate broad participation and ask that you submit your response files in English. Please send them as a pdf document to pmo_mccs_nextgen@50hertz.com.

Downloads

  • MARKET SOUNDING STATE ESTIMATION Download XLSX (683.27 KB)
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login