50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
    • Roles
    • Sustainability, Compliance and Human Rights
      Sustainability, Compliance and Human Rights
      • Human rights
      • Occupational safety
      • Engagement
      • Notices & Reports
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
        • Eger-Elster line
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding SpPS
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing reserve
      Balancing reserve
      • Revenue opportunities
      • Technical requirements
      • Balancing reserve types
      • International cooperations
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Grid figures
        Grid figures
        • Total load
        • Vertical Grid Load
        • Peak load time windows
        • Annual energy extraction
        • Static grid model
        • Grid losses
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid customers
  • Balancing group customers
  • Market communication
  • System services
    • Utilisation before limitation
    • Grid losses
    • Grid reserve
  • Standard contracts
  • Suppliers
Home/Partners/System services/Grid reserve

Grid reserve

Call for expressions of interest in accordance with § 4 (2) of the German Regulation on the Network Reserve (NetzResV) for the winter period 2026/2027 (1 October 2026 – 31 March 2027)

In accordance with the provisions of the German regulation on the network reserve of power plants (Netzreserveverordnung) as last amended on 22 December 2023, the German national regulatory authority (Bundesnetzagentur, NRA) has confirmed the requirement for additional reserve capacity for the network reserve for the winter period 2026/2027 in accordance with § 3 (1) NetzResV. To cover this demand, an expression of interest procedure will be initiated by the transmission system operators in accordance with § 4 (1) NetzResV.

The German transmission system operators hereby invite interested power plant operators to submit expressions of interest in accordance with § 4 (2) NetzResV for the participation of their power plants in the network reserve for  the period from 4 May 2026 to 19 May 2026, 12:00 p.m. CET. To submit an expression of interest, interested operators are required to complete the documents supplied for this purpose and send them electronically (provided with a qualified electronic signature) to the responsible transmission system operator:

  • for Germany: the relevant connecting transmission system operator
  • for Italy and Switzerland: TransnetBW GmbH
  • for France and Luxembourg: Amprion GmbH

Details of the specific prerequisites and requirements for the power plants and/or power plant operators, including the geographical network region in question and the technical parameters involved, are included in the documents provided.

The deadline for submitting expressions of interest for participation in the network reserve is 19 May 2026,12:00 p.m. CET. The timely electronic receipt of the duly signed documents shall be decisive for meeting the deadline.

Possible resulting contracts are subject to approval by the German NRA, in particular with regard to the selection of plant operators to be contracted and resulting financial obligations of the responsible transmission system operator. There is no legal entitlement to the conclusion of a contract.

50Hertz Transmission GmbH reserves the right to amend the published information at any time without prior notice.

Contact persons for expressions of interest to be submitted to

CONTACT

Georg Meyer-Braune

  • Email:
    georg.meyer-braune@50hertz.com
CONTACT

Matthias Gerdes

  • Email:
    matthias.gerdes@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login