50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
    • Roles
    • Sustainability, Compliance and Human Rights
      Sustainability, Compliance and Human Rights
      • Human rights
      • Occupational safety
      • Engagement
      • Notices & Reports
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
        • Eger-Elster line
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding SpPS
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing reserve
      Balancing reserve
      • Revenue opportunities
      • Technical requirements
      • Balancing reserve types
      • International cooperations
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Grid figures
        Grid figures
        • Total load
        • Vertical Grid Load
        • Peak load time windows
        • Annual energy extraction
        • Static grid model
        • Grid losses
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Countertrading
        • Outage and Planning
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
    • Onshore projects
    • Offshore projects
      • Grid connection OST-6-1
      • Hansa PowerBridge
      • Ostwind 2
      • Ostwind 3
      • Ostwind 4
      • LanWin3
      • Bornholm Energy Island
    • Interconnectors and phase shifters
    • Concluded projects
    • Planning criteria
    • Planning and approval process
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding SpPS
Home/Grid/Grid developement/Offshore projects

Offshore projects

Offshore wind farms make an important contribution to increasing the share of renewable energy in electricity generation. In 2026, two grid connections for future offshore wind farms are under construction with the projects Ostwind 3 off the coast of Rügen and OST‑6‑1 off the Darß peninsula.

In addition, 50Hertz is planning the hybrid interconnector “Bornholm Energy Island” together with the Danish transmission system operator Energinet. Once completed in the 2030s, it is intended to feed electricity from future offshore wind farms near Bornholm into the power grids of Denmark and Germany.

With the Ostwind 4 grid connection, the first direct current (DC) project by 50Hertz in the Baltic Sea is also in preparation. 50Hertz is also active in the North Sea: the LanWin3 project is intended to connect an offshore wind farm northwest of Helgoland to the German transmission grid.

Grid connection OST-6-1

  • FURTHER INFORMATION

Hansa PowerBridge

  • FURTHER INFORMATION

Kontek 400-KV Grid Connection

  • FURTHER INFORMATION
Submarine cable installation in the Baltic Sea

Ostwind 2

  • FURTHER INFORMATION

Ostwind 3

  • FURTHER INFORMATION

Ostwind 4

  • FURTHER INFORMATION

Lanwin3

  • FURTHER INFORMATION

BEI interconnector Bornholm-Germany

  • FURTHER INFORMATION
  • Contact
  • Imprint
  • Data protection
  • Projects Newsletter
  • Elia Group newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login