50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Notices & Reports
      • Test Governance
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
    • Onshore projects
    • Offshore projects
    • Interconnectors and phase shifters
    • Concluded projects
      • Kontek 400-KV Grid Connection
      • Ostwind 1
      • Combined Grid Solution
      • 380-kV line Bärwalde – Schmölln
      • 380 kV grid connection to the Förderstedt substation
      • Baltic 1
      • Baltic 2
      • Wind Bus Bar
    • Planning criteria
    • Planning and approval process
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding: State Estimator MCCS NextGen
Home/Grid/Grid developement/Concluded projects/Baltic 1

Baltic 1

Project map Baltic 1 offshore wind farm connection. Map: 50Hertz

The Baltic 1 grid connection links EnBW's offshore wind farm of the same name to the 50Hertz transmission system and is the first German offshore wind farm (OWF). It is located approximately 15 kilometres north of the Fischland-Darß-Zingst peninsula. 21 wind turbines generate a total of 185 gigawatt hours yearly, which could supply 50,000 households. The voltage is transformed in the Bentwisch substation near Rostock, and connected to the onshore grid by 50Hertz. EnBW Baltic 1 has been operational since 2 May 2011.

Technical specifications
Location of the OWF
15 kilometres to the north of Fischland-Darß-Zingst, inside the 12 nautical mile zone
Route length (total)approx. 77 km
Cable length off/onshore
approx. 61 km / 16 km
Onshore connection point
50Hertz Transmission GmbH
OWF operator
EnBW Baltic 1 GmbH
OWF / cable status
Operational
Number of turbines in OWF
21
OWF capacity
48.3 MW (21 turbines of 2.3 MW each)
Volker Gustedt
CONTACT

Volker Gustedt

Press Officer
  • Tel:
    +49 (0) 30 5150-2878
  • E-Mail:
    volker.gustedt@50hertz.com

Grid connection of the first German offshore wind farm in the Baltic Sea EnBW Baltic 1 

  • ​VIDEO​​​

Links

Website of the Grid Development Plan

  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login