50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
    • Roles
    • Sustainability, Compliance and Human Rights
      Sustainability, Compliance and Human Rights
      • Human rights
      • Occupational safety
      • Engagement
      • Notices & Reports
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • Berlin projects
          Berlin projects
          • 380-kV Berlin Diagonal Power Link: Reuter – Teufelsbruch
          • 380-kV Berlin South Vertical Power Link
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
        • Eger-Elster line
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
      • Shared use of private property
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding SpPS
    • OT/IT Gateway
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing reserve
      Balancing reserve
      • Revenue opportunities
      • Technical requirements
      • Balancing reserve types
      • International cooperations
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Grid figures
        Grid figures
        • Total load
        • Vertical Grid Load
        • Peak load time windows
        • Annual energy extraction
        • Static grid model
        • Grid losses
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Countertrading
        • Outage and Planning
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
    • Onshore projects
      • SuedOstLink
      • SuedOstLink+
      • NordOstLink
      • 380 kV overhead line Pasewalk – Bertikow
      • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
      • 380-kV overhead line Perleberg – Wolmirstedt
      • 380 kV overhead line Pulgar – Vieselbach
      • Berlin projects
        • 380-kV Berlin Diagonal Power Link: Reuter – Teufelsbruch
        • 380-kV Berlin South Vertical Power Link
      • 380-kV Berlin diagonal power link
      • 380 kV overhead line "Nordring Berlin"
      • Grid connection of the Jessen/Nord substation
      • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
      • South-West Interconnector
      • Uckermark Line
      • Grid reinforcement Mecklar-Vieselbach
      • Eulenberg substation
      • Grid reinforcement Teltow-Fläming
      • Eger-Elster line
    • Offshore projects
    • Interconnectors and phase shifters
    • Concluded projects
    • Planning criteria
    • Planning and approval process
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
    • Shared use of private property
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding SpPS
  • OT/IT Gateway
Home/Grid/Grid developement/Onshore projects/Berlin projects

Berlin projects

Berlin is growing and requires a reliable and efficient power supply - today and in the future. The growing power demand and the development of new, high energy-consuming technologies require an upgrade of existing extra high voltage lines and the construction of new, powerful supply lines.

  • Project 87 “Berlin grid development and reinforcement”, which the legislator confirmed in the Federal Requirements Plan in 2022, is key to this. The project concerns several measures with a total length of around 75 kilometres in Berlin and Brandenburg.
  • In Berlin, the section of the Berlin Diagonal Power Link between Rudolf Wissell bridge and the Mitte substation is already under construction.
  • Another section, between Teufelsbruch and Reuter, is being planned as a replacement construction project.
  • Two new lines, the Berlin South Vertical Power Link and Berlin North Vertical Power Link are also planned as new construction projects.
  • The measure from Biesdorf Süd to the Wuhlheide substation is currently being prepared.

Project overview

Open map in new tab
Karte nicht konfiguriert.

If you want more information about the individual measures, you can find it here:

Berlin Diagonal Power Link Rudolf Wissel bridge – Mitte substation

The cable tunnel of some seven kilometres is currently being constructed and will replace the underground cable from the 1970s with a 380-kV line.

  • LEARN MORE

Berlin Diagonal Power Link Reuter – Teufelsbruch

The new cable tunnel will replace the existing line, which is an underground cable running underneath Spandau at a depth of approximately two metres.

  • LEARN MORE

Berlin South Vertical Power Link

The new construction project is planned as a tunnel with a length of around 14 kilometres between Großbeeren in Brandenburg and the Mitte substation in Berlin.

  • LEARN MORE
  • Contact
  • Imprint
  • Data protection
  • Projects Newsletter
  • Elia Group External newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login