50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Notices & Reports
      • Test Governance
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid Data
    • Installed capacity
    • Production & grid feed-in
    • Disclosure of EEG data
    • Congestion management
      • Measures as per § 13 para. 1 EnWG (Conventional power plants)
      • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
      • Measures as per § 13 para. 2 EnWG
      • Commercial transactions to balance the redispatch balancing group
      • Archive Measures as per § 13 EnWG
      • Countertrading
      • Outage and Planning
    • Balancing
  • Positions and Contact
Home/Transparency/Grid Data/Congestion management

Congestion management

The 50Hertz transmission system is the basis for a reliable, secure and efficient electricity supply. The secure supply is at the centre of our activities. Should grid stability be endangered or disrupted, we immediately take grid- or market-related measures in the scope of congestion management.


The preventive or curative measures include redispatch and counter trading to adjust power feed-in (§13 paragraph 1 EnWG). The volumes indicated for the measures under §13 paragraph 1 EnWG are defined as the sum of all capacity increases as well as the sum of all capacity reductions in the time interval.


If the measures mentioned above cannot prevent a risk or solve a failure or not in time, the system operator is entitled and obliged to adjust all feed-in, transit and consumption of electricity to meet the requirements for secure and reliable operation or to request such an adjustment (§ 13 paragraph 2 EnWG, until 30th of September 2021 in conjunction with §14 EEG). The measures described as per §13 paragraph 2 EnWG, until 30th of September 2021 in conjunction with §14 EEG, exclusively concern capacity reductions.


On 1st of October 2021, the legislator introduced a standardised redispatch regime, the so-called Redispatch 2.0. In addition to conventional power plants, operators of renewable energy generation plants are also affected by the new regulation.


The Act to Accelerate the Expansion of Energy Lines (Gesetz zur Beschleunigung des Energieleitungsausbaus) of 13 May 2019 (BGBl. I p. 706) combined the former redispatch and feed-in management into redispatch 2.0. Accordingly, since 1st of October 2021, all conventional and renewable energy installations are obliged to participate in the process if they have more than 100 kW of installed capacity. In addition to the direct instruction to plant operators, there are also so-called cluster calls, in which a large number of medium-sized plants as well as small and micro plants are aggregated into a virtual call object.


The following overview lists all days on which inadmissible operating states occurred in the control area of 50Hertz Transmission or other network operators and Redispatch 2.0 was carried out. If these measures had not been carried out, the security of the electricity supply system in the 50Hertz control area or a partner control area would have been endangered, so that the maintenance of frequency, voltage or stability could no longer have been guaranteed to the required extent.

In addition to the time periods and power values instructed by 50Hertz Transmission, the reasons for the measures are also given in the individual reports. Larger power plant units are shown individually. All other plants and units are included in the cluster aggregates.

Reports on the implementation of § 13 (1) EnWG

Downloads

  • 20250315 MASSNAHMENBERICHT 13 1 Download XLSX (29.33 KB)
  • 20250312 MASSNAHMENBERICHT 13 1 Download XLSX (29.76 KB)
  • 20250310 MASSNAHMENBERICHT 13 1 Download XLSX (38.93 KB)
  • 20250309 MASSNAHMENBERICHT 13 1 Download XLSX (33.71 KB)
  • 20250308 MASSNAHMENBERICHT 13 1 Download XLSX (29.3 KB)
  • 20250307 MASSNAHMENBERICHT 13 1 Download XLSX (32.13 KB)
  • 20250306 MASSNAHMENBERICHT 13 1 Download XLSX (37.39 KB)
  • 20250305 MASSNAHMENBERICHT 13 1 Download XLSX (47.61 KB)
  • 20250304 MASSNAHMENBERICHT 13 1 Download XLSX (43.67 KB)
  • 20250303 MASSNAHMENBERICHT 13 1 Download XLSX (39.55 KB)
  • 20250301 MASSNAHMENBERICHT 13 1 Download XLSX (29.33 KB)
  • 20250225 MASSNAHMENBERICHT 13 1 Download XLSX (31.26 KB)
  • 20250223 MASSNAHMENBERICHT 13 1 Download XLSX (34.42 KB)
  • 20250222 MASSNAHMENBERICHT 13 1 Download XLSX (33.71 KB)
  • 20250221 MASSNAHMENBERICHT 13 1 Download XLSX (42.43 KB)
  • 20250220 MASSNAHMENBERICHT 13 1 Download XLSX (43.24 KB)
  • 20250219 MASSNAHMENBERICHT 13 1 Download XLSX (38.07 KB)
  • 20250218 MASSNAHMENBERICHT 13 1 Download XLSX (31.54 KB)
  • 20250217 MASSNAHMENBERICHT 13 1 Download XLSX (29.32 KB)
  • 20250212 MASSNAHMENBERICHT 13 1 Download XLSX (38.97 KB)
  • 20250211 MASSNAHMENBERICHT 13 1 Download XLSX (52.55 KB)
  • 20250210 MASSNAHMENBERICHT 13 1 Download XLSX (43.12 KB)
  • 20250209 MASSNAHMENBERICHT 13 1 Download XLSX (49.15 KB)
  • 20250208 MASSNAHMENBERICHT 13 1 Download XLSX (48.1 KB)
  • 20250207 MASSNAHMENBERICHT 13 1 Download XLSX (50.09 KB)
  • 20250206 MASSNAHMENBERICHT 13 1 Download XLSX (30.66 KB)
  • 20250205 MASSNAHMENBERICHT 13 1 Download XLSX (35.48 KB)
  • 20250204 MASSNAHMENBERICHT 13 1 Download XLSX (33.99 KB)
  • 20250203 MASSNAHMENBERICHT 13 1 Download XLSX (31.57 KB)
  • 20250201 MASSNAHMENBERICHT 13 1 Download XLSX (29.79 KB)
  • 20250131 MASSNAHMENBERICHT 13 1 Download XLSX (34.6 KB)
  • 20250130 MASSNAHMENBERICHT 13 1 Download XLSX (34.66 KB)
  • 20250129 MASSNAHMENBERICHT 13 1 Download XLSX (37.69 KB)
  • 20250128 MASSNAHMENBERICHT 13 1 Download XLSX (35.52 KB)
  • 20250127 MASSNAHMENBERICHT 13 1 Download XLSX (42.82 KB)
  • 20250126 MASSNAHMENBERICHT 13 1 Download XLSX (33.77 KB)
  • 20250125 MASSNAHMENBERICHT 13 1 Download XLSX (40.38 KB)
  • 20250124 MASSNAHMENBERICHT 13 1 Download XLSX (46.69 KB)
  • 20250123 MASSNAHMENBERICHT 13 1 Download XLSX (50.44 KB)
  • 20250122 MASSNAHMENBERICHT 13 1 Download XLSX (29.34 KB)
  • 20250121 MASSNAHMENBERICHT 13 1 Download XLSX (34.06 KB)
  • 20250116 MASSNAHMENBERICHT 13 1 Download XLSX (29.71 KB)
  • 20250115 MASSNAHMENBERICHT 13 1 Download XLSX (32.47 KB)
  • 20250114 MASSNAHMENBERICHT 13 1 Download XLSX (35.27 KB)
  • 20250113 MASSNAHMENBERICHT 13 1 Download XLSX (30.41 KB)
  • 20250112 MASSNAHMENBERICHT 13 1 Download XLSX (45.19 KB)
  • 20250111 MASSNAHMENBERICHT 13 1 Download XLSX (59.38 KB)
  • 20250110 MASSNAHMENBERICHT 13 1 Download XLSX (38.56 KB)
  • 20250109 MASSNAHMENBERICHT 13 1 Download XLSX (33.06 KB)
  • 20250108 MASSNAHMENBERICHT 13 1 Download XLSX (50.69 KB)
  • 20250107 MASSNAHMENBERICHT 13 1 Download XLSX (47.66 KB)
  • 20250106 MASSNAHMENBERICHT 13 1 Download XLSX (46.48 KB)
  • 20250105 MASSNAHMENBERICHT 13 1 Download XLSX (37.87 KB)
  • 20250104 MASSNAHMENBERICHT 13 1 Download XLSX (33.46 KB)
  • 20250103 MASSNAHMENBERICHT 13 1 Download XLSX (46.29 KB)
  • 20250102 MASSNAHMENBERICHT 13 1 Download XLSX (38.26 KB)
  • 20250101 MASSNAHMENBERICHT 13 1 Download XLSX (39.73 KB)
Reports on the implementation of § 13 (1) EnWG - Archive

Downloads

  • 2024 MASSNAHMENBERICHT ARCHIV Download ZIP (8.9 MB)
  • 2023 MASSNAHMENBERICHT ARCHIV Download ZIP (9.28 MB)
  • 2022 MASSNAHMENBERICHT ARCHIV Download ZIP (7.16 MB)
  • 2021 MASSNAHMENBERICHT ARCHIV Download ZIP (1.51 MB)
Reports on the implementation of § 13 (2) EnWG in combination with §14 EEG

From 01.10.2021 due to the introduction of Redispatch 2.0 the reports on the application of § 13 (2) EnWG in conjunction with § 14 EEG will no longer apply.

The reduction of RE - plants is part of the reports according §13 Abs. 1 EnWG.

Downloads (in German only)

  • INFORMATION EEG14 MIT 13-2 ARCHIV-JAHR 2021 Download ZIP (4.33 MB)
  • INFORMATION EEG14 MIT 13-2 ARCHIV-JAHR 2020 Download ZIP (9.75 MB)
  • INFORMATION EEG14 MIT 13-2 ARCHIV-JAHR 2019 Download ZIP (10.97 MB)
  • INFORMATION EEG14 MIT 13-2 ARCHIV-JAHR 2018 Download ZIP (22.09 MB)
  • INFORMATION EEG14 MIT 13-2 ARCHIV-JAHR 2017 Download ZIP (23.67 MB)
  • INFORMATION EEG14 MIT 13-2 ARCHIV-JAHR 2016 Download ZIP (27.38 MB)
  • INFORMATION EEG14 MIT 13-2 ARCHIV-JAHR 2015 Download ZIP (35.1 MB)
  • INFORMATION EEG14 MIT 13-2 ARCHIV-JAHR 2014 Download ZIP (9.54 MB)
  • INFORMATION EEG14 MIT 13-2 ARCHIV-JAHR 2013 Download ZIP (8.8 MB)
  • INFORMATION EEG14 MIT 13-2 ARCHIV-JAHR 2012 Download ZIP (2.06 MB)
Reports on the implementation of § 13 (2) EnWG from 2009 to March 2012

Downloads (in German only)

  • ANGESPANNTE NETZSITUATION 2012.03.28 BIS 2012.03.29 Download PDF (10.07 KB)
  • ANGESPANNTE NETZSITUATION 2012.03.19 Download PDF (7.92 KB)
  • ANGESPANNTE NETZSITUATION 2012.03.18 BIS 2012.03.19 Download PDF (8.07 KB)
  • ANGESPANNTE NETZSITUATION 2012.03.10 Download PDF (7.62 KB)
  • ANGESPANNTE NETZSITUATION 2012.03.08 Download PDF (7.49 KB)
  • ANGESPANNTE NETZSITUATION 2012.02.28 Download PDF (8.04 KB)
  • ANGESPANNTE NETZSITUATION 2012.02.23 BIS 2012.02.25 Download PDF (12.5 KB)
  • ANGESPANNTE NETZSITUATION 2012.02.22 BIS 2012.02.23 Download PDF (47.29 KB)
  • ANGESPANNTE NETZSITUATION 2012.02.21 Download PDF (7.54 KB)
  • ANGESPANNTE NETZSITUATION 2012.02.14 BIS 2012.02.15 Download PDF (46.98 KB)
  • ANGESPANNTE NETZSITUATION 2012.01.27 Download PDF (7.1 KB)
  • ANGESPANNTE NETZSITUATION 2012.01.21 BIS 2012.01.22 Download PDF (9.36 KB)
  • ANGESPANNTE NETZSITUATION 2012.01.20 BIS 2012.01.21 Download PDF (13.92 KB)
  • ANGESPANNTE NETZSITUATION 2012.01.12 BIS 2012.01.14 Download PDF (8.52 KB)
  • ANGESPANNTE NETZSITUATION 2012.01.09 BIS 2012.01.10 Download PDF (7.81 KB)
  • ANGESPANNTE NETZSITUATION 2012.01.03 BIS 2012.01.06 Download PDF (10.94 KB)
  • ANGESPANNTE NETZSITUATION 2012.01.02 Download PDF (44.46 KB)
  • ANGESPANNTE NETZSITUATION 2011.12.29 Download PDF (9.19 KB)
  • ANGESPANNTE NETZSITUATION 2011.12.24 BIS 2011.12.26 Download PDF (8.93 KB)
  • ANGESPANNTE NETZSITUATION 2011.12.16 BIS 2011.12.18 Download PDF (9.05 KB)
  • ANGESPANNTE NETZSITUATION 2011.12.14 Download PDF (8.71 KB)
  • ANGESPANNTE NETZSITUATION 2011.12.13 Download PDF (8.78 KB)
  • ANGESPANNTE NETZSITUATION 2011.12.08 BIS 2011.12.09 Download PDF (9.15 KB)
  • ANGESPANNTE NETZSITUATION 2011.12.07 Download PDF (8.62 KB)
  • ANGESPANNTE NETZSITUATION 2011.12.05 BIS 2011.12.06 Download PDF (8.87 KB)
  • ANGESPANNTE NETZSITUATION 2011.12.02 BIS 2011.12.04 Download PDF (9.37 KB)
  • ANGESPANNTE NETZSITUATION 2011.11.26 BIS 2011.11.28 Download PDF (9.05 KB)
  • ANGESPANNTE NETZSITUATION 2011.10.24 Download PDF (8.63 KB)
  • ANGESPANNTE NETZSITUATION 2011.10.18 Download PDF (11.58 KB)
  • ANGESPANNTE NETZSITUATION 2011.10.10 Download PDF (11.55 KB)
  • ANGESPANNTE NETZSITUATION 2011.10.06 BIS 2011.10.08 Download PDF (11.98 KB)
  • ANGESPANNTE NETZSITUATION 2011.09.14 Download PDF (11.89 KB)
  • ANGESPANNTE NETZSITUATION 2011.09.13 Download PDF (9.63 KB)
  • ANGESPANNTE NETZSITUATION 2011.09.07 Download PDF (11.9 KB)
  • ANGESPANNTE NETZSITUATION 2011.08.19 Download PDF (12 KB)
  • ANGESPANNTE NETZSITUATION 2011.08.09 Download PDF (7.38 KB)
  • ANGESPANNTE NETZSITUATION 2011.07.30 Download PDF (7.01 KB)
  • ANGESPANNTE NETZSITUATION 2011.07.22 BIS 2011.07.23 Download PDF (7.36 KB)
  • ANGESPANNTE NETZSITUATION 2011.07.15 Download PDF (12.19 KB)
  • ANGESPANNTE NETZSITUATION 2011.07.02 Download PDF (12.69 KB)
  • ANGESPANNTE NETZSITUATION 2011.04.08 Download PDF (11.7 KB)
  • ANGESPANNTE NETZSITUATION 2011.03.10 BIS 2011.03.11 Download PDF (12.76 KB)
  • ANGESPANNTE NETZSITUATION 2011.02.04 BIS 2011.02.08 Download PDF (15.98 KB)
  • ANGESPANNTE NETZSITUATION 2011.01.01 Download PDF (12.64 KB)
  • ANGESPANNTE NETZSITUATION 2010.12.11 Download PDF (13.16 KB)
  • ANGESPANNTE NETZSITUATION 2010.11.15 Download PDF (11.59 KB)
  • ANGESPANNTE NETZSITUATION 2010.11.11 BIS 2010.11.12 Download PDF (12.56 KB)
  • ANGESPANNTE NETZSITUATION 2010.11.05 Download PDF (11.89 KB)
  • ANGESPANNTE NETZSITUATION 2010.01.29 BIS 2010.01.30 Download PDF (11.52 KB)
  • ANGESPANNTE NETZSITUATION 2009.12.25 BIS 2009.12.26 Download PDF (486.29 KB)
  • ANGESPANNTE NETZSITUATION 2009.03.22 BIS 2009.03.24 Download PDF (7.85 MB)
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login