50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Grid Data
    • Installed capacity
    • Production & grid feed-in
    • Disclosure of EEG data
    • Congestion management
    • Balancing
  • Positions and Contact
Home/Transparency/Grid Data/Grid figures/Grid load

Grid load in the grid area

Interactive map of grid load in the grid area

  • TO THE MAP

Data

The data shown belong to 50Hertz. They are directly extracted at the so-called ‘Control Center’, i.e. the central control point in Neuenhagen near Berlin. They are then quality checked to ensure maximum usability. The data is imported into the database on weekdays. As a rule, the status of 24 hours ago is displayed.

50Hertz makes the data available as of 01/03/2012.

Disclaimer

50Hertz determines and provides all data on this website to the best of its abilities and with no guarantee for their correctness and completeness. Should the data be temporarily unavailable for technical or other reasons, 50Hertz will make every effort to immediately restore access to the data. No liability will be accepted for any damage resulting from temporary non-availability or inaccuracy of data, except in the event of wilful intent.
50Hertz reserves the right to subsequently change data should this be required for correction purposes.

For each year a month-by-month overview of the measures and adjustments as per §13 EnWG and §14 EEG is available for download as PDF (only in German language):

Adjustments as per §13 EnWG and §14 EEG

2018

  • 01 JANUAR 2018 Download PDF (52.24 KB)
  • 02 FEBRUAR 2018 Download PDF (53.57 KB)
  • 03 MÄRZ 2018 Download PDF (54.4 KB)
  • 04 APRIL 2018 Download PDF (55.07 KB)
  • 05 MAI 2018 Download PDF (55.66 KB)
  • 06 JUNI 2018 Download PDF (56.71 KB)
  • 07 JULI 2018 Download PDF (56.72 KB)
  • 08 AUGUST 2018 Download PDF (57.83 KB)
  • 09 SEPTEMBER 2018 Download PDF (58.73 KB)
  • 10 OKTOBER 2018 Download PDF (59.23 KB)
  • 11 NOVEMBER 2018 Download PDF (59.93 KB)
  • 12 DEZEMBER 2018 Download PDF (60.37 KB)

2017

  • 01 JANUAR 2017 Download PDF (51.72 KB)
  • 02 FEBRUAR 2017 Download PDF (53.18 KB)
  • 03 MÄRZ 2017 Download PDF (53.97 KB)
  • 04 APRIL 2017 Download PDF (54.65 KB)
  • 05 MAI 2017 Download PDF (54.71 KB)
  • 06 JUNI 2017 Download PDF (56.41 KB)
  • 07 JULI 2017 Download PDF (56.8 KB)
  • 08 AUGUST 2017 Download PDF (57.33 KB)
  • 09 SEPTEMBER 2017 Download PDF (57.78 KB)
  • 10 OKTOBER 2017 Download PDF (58.68 KB)
  • 11 NOVEMBER 2017 Download PDF (59.47 KB)
  • 12 DEZEMBER 2017 Download PDF (60.11 KB)

2016

  • 01 JANUAR 2016 Download PDF (51.79 KB)
  • 02 FEBRUAR 2016 Download PDF (52.92 KB)
  • 03 MÄRZ 2016 Download PDF (54.09 KB)
  • 04 APRIL 2016 Download PDF (54.67 KB)
  • 05 MAI 2016 Download PDF (55.1 KB)
  • 06 JUNI 2016 Download PDF (56.05 KB)
  • 07 JULI 2016 Download PDF (56.46 KB)
  • 08 AUGUST 2016 Download PDF (56.54 KB)
  • 09 SEPTEMBER 2016 Download PDF (57.25 KB)
  • 10 OKTOBER 2016 Download PDF (57.45 KB)
  • 11 NOVEMBER 2016 Download PDF (58.32 KB)
  • 12 DEZEMBER 2016 Download PDF (58.66 KB)

2015

  • 01 JANUAR 2015 Download PDF (51.94 KB)
  • 02 FEBRUAR 2015 Download PDF (52.55 KB)
  • 03 MÄRZ 2015 Download PDF (53.48 KB)
  • 04 APRIL 2015 Download PDF (54.14 KB)
  • 05 MAI 2015 Download PDF (54.72 KB)
  • 06 JUNI 2015 Download PDF (55.86 KB)
  • 07 JULI 2015 Download PDF (56.65 KB)
  • 08 AUGUST 2015 Download PDF (57.76 KB)
  • 09 SEPTEMBER 2015 Download PDF (58.26 KB)
  • 10 OKTOBER 2015 Download PDF (58.9 KB)
  • 11 NOVEMBER 2015 Download PDF (59.58 KB)
  • 12 DEZEMBER 2015 Download PDF (60.04 KB)

2014

  • 01 JANUAR 2014 Download PDF (51.69 KB)
  • 02 FEBRUAR 2014 Download PDF (52.57 KB)
  • 03 MÄRZ 2014 Download PDF (53.32 KB)
  • 04 APRIL 2014 Download PDF (53.87 KB)
  • 05 MAI 2014 Download PDF (54.36 KB)
  • 06 JUNI 2014 Download PDF (55.61 KB)
  • 07 JULI 2014 Download PDF (56.35 KB)
  • 08 AUGUST 2014 Download PDF (56.66 KB)
  • 09 SEPTEMBER 2014 Download PDF (56.85 KB)
  • 10 OKTOBER 2014 Download PDF (57.02 KB)
  • 11 NOVEMBER 2014 Download PDF (57.55 KB)
  • 12 DEZEMBER 2014 Download PDF (58.41 KB)

2013

  • 01 JANUAR 2013 Download PDF (43.4 KB)
  • 02 FEBRUAR 2013 Download PDF (43.75 KB)
  • 03 MÄRZ 2013 Download PDF (52.72 KB)
  • 04 APRIL 2013 Download PDF (52.78 KB)
  • 05 MAI 2013 Download PDF (53.4 KB)
  • 06 JUNI 2013 Download PDF (54.49 KB)
  • 07 JULI 2013 Download PDF (55.13 KB)
  • 08 AUGUST 2013 Download PDF (55.87 KB)
  • 09 SEPTEMBER 2013 Download PDF (56.38 KB)
  • 10 OKTOBER 2013 Download PDF (56.49 KB)
  • 11 NOVEMBER 2013 Download PDF (57.19 KB)
  • 12 DEZEMBER 2013 Download PDF (57.76 KB)

2012

  • 01 JANUAR 2012 Download PDF (43.36 KB)
  • 02 FEBRUAR 2012 Download PDF (44.1 KB)
  • 03 MÄRZ 2012 Download PDF (44.77 KB)
  • 04 APRIL 2012 Download PDF (45.33 KB)
  • 05 MAI 2012 Download PDF (46.34 KB)
  • 06 JUNI 2012 Download PDF (47.15 KB)
  • 07 JULI 2012 Download PDF (47.61 KB)
  • 08 AUGUST 2012 Download PDF (47.93 KB)
  • 09 SEPTEMBER 2012 Download PDF (48.24 KB)
  • 10 OKTOBER 2012 Download PDF (48.94 KB)
  • 11 NOVEMBER 2012 Download PDF (49.73 KB)
  • 12 DEZEMBER 2012 Download PDF (50.24 KB)

Downloads

  • 2013 1. QUARTAL Download CSV (4.78 MB)
  • 2013 2. QUARTAL Download CSV (4.95 MB)
  • 2013 3. QUARTAL Download CSV (4.93 MB)
  • 2013 4. QUARTAL Download CSV (5.06 MB)
  • 2014 1. QUARTAL Download CSV (4.96 MB)
  • 2014 2. QUARTAL Download CSV (5.03 MB)
  • 2014 3. QUARTAL Download CSV (5.08 MB)
  • 2014 4. QUARTAL Download CSV (5.09 MB)
  • 2015 1. QUARTAL Download CSV (4.96 MB)
CONTACT

Cornelia Boldt

Grid connection and grid access
  • Tel:
    +49 (0) 30 5150-2169
  • E-Mail:
    cornelia.boldt@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login