50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Notices & Reports
      • Test Governance
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Structure
  • Roles
  • Business locations
  • Sustainability and Human Rights
    • CSR Portal
    • Occupational safety
    • Engagement
    • Notices & Reports
    • Test Governance
  • Innovation
  • Partnerships
  • Strategy
Home/Company/Sustainability and Human Rights/Occupational safety

Occupational safety at 50Hertz

Every accident is one too many. The prevention of accidents and work-related illnesses is therefore a top priority for 50Hertz. This applies to our employees as well as to our partners. In order to achieve this goal, we see occupational safety as a process of continuous improvement with the following focal points:


  • Create safe working conditions and promote safe behaviour

  • Avoid accidents at work by raising risk awareness

  • With the guiding principle “Take care!” (“gib8” in German) we aim at reinforcing our prevention culture and promoting the self-responsibility in terms of occupational safety.

  • We also demand this high standard for occupational safety from our suppliers and the service providers whom we employ and who work for us, for instance on 50Hertz construction sites.

Safety induction for 50Hertz Onshore projects

Safety induction for 50Hertz Offshore projects 

Certified according to ISO 45001:2018

DEKRA Certification GmbH certifies that 50Hertz in the area of operation, maintenance, planning and expansion of the transmission grid at its sites has introduced and maintains an occupational health and safety management system in accordance with ISO 45001:2018.

DOWNLOAD CERTIFICATE

Quality assurance on construction sites

Due to the planned grid development as well as our maintenance measures, we continuously face great challenges. Together with our contractors, we strive to set things in motion in the future as well.

It is 50Hertz’s objective to ensure that our contractors perform their work in accordance with the contract, while paying particular attention to occupational safety, environmental protection and work quality. Inspecting construction sites is one of the elements that contribute to achieving this goal. During these inspections, compliance with the agreed standards for the areas mentioned above is verified using trade-specific checklists and the results are documented in a uniform manner.

Since November 2015, 50Hertz performs its inspections using iPads. When the inspections are concluded, the results are always discussed on site with the supervisor of our contractors. The report is then e-mailed to the contractor and the responsible person at 50Hertz. We give our contractors the opportunity to submit their comments within 10 business days after the report has been sent. The results of the inspections can be used for supplier assessment. In case of violations, we furthermore reserve the right to introduce corresponding measures.

In the case of contracts that contain the "Agreement on Quality Assurance on Construction Sites" including the corresponding criteria lists and escalation models, the special measures contained in the contract must be observed.

The english translation of the OAFN is for information purposes only. The contractual language specified in the contractual documents must be observed.

Downloads

  • 01 INSTRUCTIONS ON GUARANTEEING OCCUPATIONAL SAFETY WHEN CONTRACTING WITH EXTERNAL COMPANIES FOR WORK IN THE SCOPE OF THE 50Hertz (OAFN) - VERSION 06204 Download PDF (527.75 KB)
  • 02 VEREINBARUNG ZUR QUALITÄTSSICHERUNG AUF BAUSTELLEN BEI 50Hertz STAND 10-2017 - GERMAN Download PDF (215.41 KB)
  • 03 ESKALATIONSMODELL QUALITÄTSSICHERUNG AUF BAUSTELLEN BEI 50Hertz - GERMAN Download PDF (285.53 KB)
  • 04 ARBEITSSICHERHEIT UND QUALITÄTSSICHERUNG AUF BAUSTELLEN - GERMAN Download PDF (2.17 MB)
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login