50hertz.com
EN

Sprache auswählen

  • EN
50hertz.com
EN
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Human rights
      • Notices & Reports
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • EN

  • Structure
  • Roles
  • Business locations
  • Sustainability and Human Rights
    • CSR Portal
    • Occupational safety
    • Engagement
    • Human rights
    • Notices & Reports
  • Innovation
  • Partnerships
  • Strategy
Home/Company/Sustainability and Human Rights/Test Governance

Test Governance

ESG Governance Index

Good governance is essential for ensuring our sustainable success in the long term. In addition to designing clear objectives regarding ethics and transparency, an environmental, social, and governance (ESG) index was created to help us embed ESG factors into our business activities and decision-making processes, including the variable remuneration of our workforce.

The ESG Governance Index consists of the following commitments:

0 or 1
Develop an ESG journey, including an annual sustainability governance workshop, with the Board
0 or 1
Provide a bi-annual assessment of the risk situation in every Group entity
0 or 1
Add Sustainability aspects to charter of BoD Committees
0 or 1
Establish an annual Board performance review
0 or 1
Have an ESG expert in the BoD
0 or 1
Create a remuneration Committee within Eurogrid GmbH
0 or 1
Review and publish Severance pay policy for senior executives leaving the company: (1) No specific termination clause, (2) just local regulation applies
0 or 1
Add an Executive-level responsibility for ESG topics both at Group and local levels (GRI 102-20)
0 or 1
Ensure a minimum of 20% for the weight of Act Now objectives in the variable remuneration of EXCO and EGMB members
0 or 1
Set up annual local Exco meeting on how to embed Sustainability in the decision-making process (Budgets, Strategic planning, organisation)
0 or 1
Have all Act Now objectives in the Strategic Business Roadmaps of local entities and allocate required resources (FTE and €)
0 or 1
Bridge 90% of the gaps between Elia/50Hertz's operations and the preselected set of ESG standards published by ratings agencies, investors and regulators


                                                               ∑ 0 … 12/12 ESG Governance score

Compliance Index

Next to the ESG governance index, a compliance index, which guides us in introducing the right measures to ensure compliance with all relevant legal and regulatory requirements, was created. The index consolidates key requirements needed to ensure that we are not only compliant with all relevant regulatory requirements  but also prevent any kind of fraud or abuse, detect compliance issues at an early stage, and implement prompt corrective actions.

The Compliance Index consists of the following commitments:

0 or 1Assign one Compliance coordinator in 50Hertz and ETB
0 or 1Set-up an anti-bribery and corruption policy for all Group entities
0 or 1Write a conflict of interest policy for all Group entities
0 or 1% employees having followed the training on anti-bribery and corruption and conflict of interest >80%
0 or 1% of the procurement volume spent from suppliers having signed the supplier Code of Conduct > 80%
0 or 1Report according to IIRC as from 2023 and TCFD from 2024
0 or 1Is the% of timely implemented internal audit recommendations > 95%. If yes, 1; else 0
0 or 1No confirmed incidents of corruption and actions taken (GRI 205-3)
0 or 1No non-compliance with environmental laws and regulations notified by authorities or certification body (GRI 307-1)
0 or 1No Legal actions for anti-competitive behavior, anti-trust, and monopoly practices (GRI 206-1)
0 or 1No data breaches notified to the data protection authorities (GDPR violations)
0 or 1Publication of a corporate tax disclosure (GRI 207)
                                                                  ∑ 0 … 12/12 Compliance score
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login