50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
    • History
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
Show All
Home/News/Full article: News of 50Hertz
09.10.2018 |
Project News

50Hertz grid enables first partial feed-in of power from offshore wind farm Arkona

Grid connection of second offshore wind farm in Westlich Adlergrund Cluster on track
50Hertz grid enables first partial feed-in of power from offshore wind farm Arkona
Sassnitz – 50Hertz was able to make it possible for the offshore wind farm Arkona to provide a first partial feed-in as part of the Ostwind 1 grid connection project during the construction phase. The project, which started in 2015, is on track. Now, 50Hertz is completing the remaining work along the cable route.

Another submarine cable towards the offshore wind farm Arkona platform is currently being laid. The close coordination of the timing and technical aspects between the companies contributes to bringing about the energy transition.
Share via twitter via facebook via mail
previous news
next news
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login