50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
    • Security of supply
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
    • Special-IT-Jobs
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        • Principles
        • Previous versions of purchasing conditions
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • History
    • Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • SuedOstLink Plus
        • Eulenberg substation
      • Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
        • Ostwind 3
      • Interconnectors and phase shifters
      • Concluded projects
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCSNG
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Redispatch Calculator SWKL
        • Outage and Planning
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Structure
    • Management
    • Supervisory Board
  • Roles
  • Business locations
  • Sustainability
  • Innovation
  • Partnerships
  • History
  • Strategy
Home/Company/Structure/Management

Management

Stefan Kapferer. Photo: Jan Pauls

Chief Executive Officer (CEO)

Stefan Kapferer has been CEO of 50Hertz since December 2019 and is also a member of the steering committee of the Belgian-German Elia Group. He looks back on a long career in politics and business. For several years he was State Secretary in various ministries at state and federal level - e.g. from 2011 on at the Federal Ministry of Economics. From 2014 to 2016 Kapferer was Deputy Secretary-General of the OECD in Paris.
From 2016 to 2019 he was Chairman of the Executive Board of the Federal Association of the German Energy and Water Industries (BDEW).

Dr. Frank Golletz. Photo: Jan Pauls

Chief Technical Officer (CTO)

Dr. Frank Golletz, born in 1960, has been the Chief Technical Officer for 50Hertz since 2011. Before, he acted as proxy and Head of the Assets/Grid Projects Department at 50Hertz. Between 1992 and 1997, Frank Golletz was in charge of substations at the Dresden Grid Operation Department of VEAG. He was also stationed at the VEAG branch in Bad Lauchstädt, where he managed grid operations for Saxony-Anhalt and Thuringia.

Dr. Dirk Biermann. Photo: Jan Pauls

Chief Markets & System Operations Officer (CMO)

Dr. Dirk Biermann, born in 1969, has been Chief Markets and System Operations Officer since 2012. Prior to his current position, he acted as proxy for the company and held the position of Head of Energy Management. As such, he was responsible for the company's energy trading activities, which also includes ancillary services, EEG affairs and balancing group management as well as market development and congestion management.
In 1999, Dr Biermann joined VEAG, as it was called at the time. He later moved on to the Vattenfall Europe Holding in 2002, where he took up a leading position in the Grid Strategy Department in 2004.

Marco Nix. Photo: Jan Pauls

Chief Financial Officer (CFO)

Marco Nix, born in 1974, has been responsible for 50Hertz's Finance Department since July 2015. Since 2009, the business economist was Head of Controlling at 50Hertz and in addition from April 2014 onwards the Chief Corporate and Financial Officer of Elia Grid International . Born in Berlin, Nix previously held senior positions in the financial sector of the Vattenfall Group. His professional career in the energy sector began in 2001 at the Berlin based energy company Bewag.

Sylvia Borcherding, Arbeitsdirektorin
Sylvia Borcherding. Photo: Jan Pauls

Chief Human Resources Officer (CHRO)

Sylvia Borcherding is Chief Human Resources Officer at 50Hertz since 2019. Before, she has held leading positions in the Metro group, at healthcare provider IAS and at outsourcing specialist Capita. 

Michael von Roeder
Michael von Roeder. Photo: Jan Pauls

Chief Digital and IT Officer (CDIO) 

Michael von Roeder is Chief Digital and IT Officer at 50Hertz and member of the steering committee of the Belgian-German Elia Group since late 2019 and responsible for the digital transformation of the Group. Prior to his position at 50Hertz, he was CEO of Sensorberg. Until mid of 2016 he was in charge of IT operations at Vattenfall. As COO he led the iconmobile group from 2009 to 2010. Michael von Roeder was manager at Vodafone and Accenture in London, Tokio und Düsseldorf. He studied Technology Management, Organization und International Business in Stuttgart and Lausanne.

  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login