50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
    • History
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
  • Grid customers
    • Grid connection
    • Grid access
  • Balancing group customers
  • Market communication
  • System services
    • Interruptible loads
    • Utilisation before limitation
    • Grid losses
    • Grid reserve
  • Standard contracts
  • Suppliers
    • Supplier portal
    • Frequently Asked Questions
    • Downloads
  • EEG registration
Show All
Home/Partners/Suppliers/Downloads

Downloads

Read more

  • SUPPLIER PORTAL
  • FAQ FOR THE SUPPLIER PORTAL

General Purchasing Terms and Conditions (GPT)

  • 01 GENERAL (AS OF 3-2017) Download PDF (203.49 KB)
  • 02 SERVICES (AS OF 3-2017) Download PDF (299.76 KB)
  • 03 DISPOSAL SERVICES (AS OF 3-2017) Download PDF (254.57 KB)
  • 04 TEMPORARY EMPLOYMENT (AS OF 3-2017) Download PDF (149.32 KB)
  • 05 ENGINEERING (AS OF 3-2017) Download PDF (277.5 KB)
  • 06 IT (AS OF 3-2017) Download PDF (267.59 KB)
  • 07 SUPPLY OF HIGH VOLTAGE COMPONENTS (AS OF 3-2017) Download PDF (291.29 KB)
  • 08 ESCROW AGREEMENT Download PDF (88.05 KB)
  • 09 INVOICING REQUIREMENTS (AS OF 3-2020) Download PDF (635.23 KB)
  • 10 TEMPLATE CONTRACT FOR DATA PROCESSING GDPR (AS OF 3-2019) Download PDF (176.74 KB)
  • 11 HANDOUT CREDIT MEMO PROCEDURE (AS OF 12-2016) Download PDF (852.83 KB)
  • 12 CONDITIONS OF USE VIRTUAL IT WORKSPACE (AS OF 08-2019) Download PDF (415.3 KB)

Documents for the 50Hertz supplier portal and the P2P process

  • 01 REGISTRATION CONDITIONS FOR THE 50Hertz SUPPLIER PORTAL (GERMAN AND ENGLISH) Download PDF (71.32 KB)
  • 02 CONDITIONS OF USE FOR THE 50Hertz SUPPLIER PORTAL (GERMAN AND ENGLISH) Download PDF (73.66 KB)
  • 03 USER MANUAL SUPPLIER PORTAL Download PDF (3.21 MB)
  • 04 HANDOUT SUPPLIER PORTAL FOR SERVICE PROVIDER Download PDF (1.66 MB)
  • 05 LIST OF BROWSERS SUPPORTED BY OUR SUPPLIER POPRTAL (VERSION OCTOBER 2019) Download PDF (60.78 KB)
  • 06 HANDOUT CREDIT MEMO PROCEDURE (AS OF 12-2016) Download PDF (852.83 KB)
CONTACT

50Hertz Purchasing

Heidestraße 2 | 10557 Berlin
  • Tel:
    +49 (0) 30 5150-0
  • E-Mail:
    purchasing@50hertz.com

Occupational safety

Learn more about occupational safety at 50Hertz.

  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login