50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
    • Roles
    • Sustainability, Compliance and Human Rights
      Sustainability, Compliance and Human Rights
      • Human rights
      • Occupational safety
      • Engagement
      • Notices & Reports
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • Berlin projects
          Berlin projects
          • 380-kV Berlin Diagonal Power Link: Reuter – Teufelsbruch
          • 380-kV Berlin North Vertical Power Link
          • 380-kV Berlin South Vertical Power Link
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
        • Eger-Elster line
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
      • Shared use of private property
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding SpPS
    • OT/IT Gateway
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing reserve
      Balancing reserve
      • Revenue opportunities
      • Technical requirements
      • Balancing reserve types
      • International cooperations
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Grid figures
        Grid figures
        • Total load
        • Vertical Grid Load
        • Peak load time windows
        • Annual energy extraction
        • Static grid model
        • Grid losses
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Countertrading
        • Outage and Maintenance
        • Trade transactions to maintain the system balance
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
    • Onshore projects
    • Offshore projects
      • Grid connection OST-6-1
      • Hansa PowerBridge
      • Ostwind 2
      • Ostwind 3
      • Ostwind 4
      • LanWin3
      • Bornholm Energy Island
    • Interconnectors and phase shifters
    • Concluded projects
    • Planning criteria
    • Planning and approval process
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
    • Shared use of private property
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding SpPS
  • OT/IT Gateway
Home/Grid/Grid developement/Offshore projects/Ostwind 4/Stilow converter system

Stilow converter system

A converter is a technical installation that converts direct current (DC) into alternating current (AC) or vice versa. Converters are used wherever electricity is transported using high voltage direct current (HVDC) technology. DC technology makes it possible to controllably transmit large volumes of electricity across large distances while minimising energy losses in the process. For technical reasons, transmission takes place between two defined grid connection points. The line route does not branch off at any given point, nor is electricity injected or discharged along the line.

As part of the Ostwind 4 project, an onshore converter is now planned at the Stilow site in the German municipality of Brünzow to convert the direct current that is generated offshore into alternating current onshore. In a neighbouring substation at the same site, the converted alternating current will then be injected into the transmission grid.

The converter at a glance

The planned converter is to be installed on the Stilow substation site (located in the municipality of Brünzow, in the Vorpommern-Greifswald district). The expansion area for the converter will cover around 6 hectares, expanding the area beyond the existing Stilow substation, erected for Ostwind 3, to the west of the existing site. As such, the total area of the site will increase from what was originally 10.5 hectares to around 16 hectares following the planned installation of the converter.

Technical equipment such as switchgear bays, transformers and disconnectors will be visible from the outside of the converter. The actual system responsible for converting direct current into alternating current is set to be housed in two inner halls, intended to protect the system against adverse weather conditions, abate the generated noise as well as to shield off electrical and magnetic fields.

Additionally, the system includes six single-pole transformers, which are each equipped with noise hoods.

Visualisation of the planned converter system at the Stilow substation

The Stilow site

This site had already been chosen in the scope of the previous Ostwind 3 project following an extensive assessment of various alternative sites. The explicit goal of the search was to find a site that could be expanded to a total area of 16 hectares to accommodate future projects, such as Ostwind 4.

In all, eleven alternative large-scale sites were considered for the substation.

Stilow was eventually preferred for several reasons:

  • The Stilow site offers the closest overhead line connection to the existing transmission grid.
  • Compared to the alternative sites taken into consideration, Stilow has the lowest adverse effects on humans and the environment.
  • There are sufficient surrounding expansion areas so that no new sites need to be created, existing infrastructure can be bundled and the use of additional space is minimised.
  • The access roads that were already created for Ostwind 3 can be used following only minor adjustments to the existing transport routes.
  • Synergies can also be established with the route for Ostwind 3. The cable conduits for the Ostwind 4 cable system, for instance, were already laid along the onshore route during the Ostwind 3 project.

The permit procedure

The approval of the planned converter in Stilow is now subject to an ongoing planning approval procedure. The application for planning approval for the Ostwind 4 onshore cable route, and with it approval for the planned Stilow converter and tap point, was submitted to the competent German Ministry for Economy, Infrastructure, Tourism and Labour of Mecklenburg-Western Pomerania in February of 2026.