50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Notices & Reports
      • Test Governance
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid developement
    • Onshore projects
      • SuedOstLink
      • SuedOstLink+
      • NordOstLink
      • 380 kV overhead line Pasewalk – Bertikow
      • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
      • 380-kV overhead line Perleberg – Wolmirstedt
      • 380 kV overhead line Pulgar – Vieselbach
      • 380-kV Berlin diagonal power link
      • 380 kV overhead line "Nordring Berlin"
      • Third interconnector
      • Grid connection of the Jessen/Nord substation
      • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
      • South-West Interconnector
      • Uckermark Line
      • Grid reinforcement Mecklar-Vieselbach
      • Eulenberg substation
      • Grid reinforcement Teltow-Fläming
    • Offshore projects
    • Interconnectors and phase shifters
    • Concluded projects
    • Planning criteria
    • Planning and approval process
    • Projects of Common Interest (PCI)
    • BESTGRID
    • compactLine
  • System control
  • Grid operations
  • MCCS
  • MCCS DSA
  • Market sounding: State Estimator MCCS NextGen
Home/Grid/Grid developement/Onshore projects

Onshore projects

The energy transition is changing the demand for the transmission grid of 50Hertz. To improve the transport of power to consumption centers, we want to replace a series of 220 and 380 kilovolt overhead lines onshore with ones with a higher capacity. We have implemented the South-West Interconnector as a new electricity link from north to south. Together with the transmission grid operator TenneT, we are planning the DC cable SuedOstLink, which will primarily transport renewable energy from the north to Bavaria. For the most important ongoing projects, you will find all important information on the planning status, maps, contact addresses and contact persons here if you have any questions or comments.

SuedOstLink

The SuedOstLink planned by 50Hertz is one of the most important new transmission lines between northern and southern Germany that are needed for a successful energy transition. This high voltage direct current (HVDC) power link between Saxony-Anhalt and Bavaria, with its approximated length of 540 kilometres, should be operational in 2025.

  • FURTHER INFORMATION

Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf

The existing 100 km-long 380-kV overhead line between Röhrsdorf in Saxony and Remptendorf in Thuringia is currently operated at 2500 ampere per electrical circuit. It should be upgraded to a current-carrying capacity of 3600 ampere in the future.

  • FURTHER INFORMATION

380-kV Berlin diagonal power link

As a result of the energy transition, certain current flows are changing considerably. This requires new lines, while other lines have to be reinforced. One of the lines in high demand due to the growth in renewables is the 380-kV diagonal power link running across Berlin. 50Hertz is planning an urgently needed capacity upgrade in the years to come.

  • FURTHER INFORMATION

380-kV overhead line Pulgar-Vieselbach

In the scope of the expansion and retrofitting of the transmission grid in the northern and eastern part of Germany, 50Hertz plans the construction of a replacement 380 kV overhead line between the substations Pulgar near Zwenkau (Saxony) and Vieselbach near Erfurt (Thuringia).

  • FURTHER INFORMATION

380-kV overhead line Bertikow – Pasewalk

The 380 kv overhead line connecting Pasewalk and Bertikow is intended to ensure security of supply in the region. To this end, 50Hertz is replacing the existing 220 kV EHV line between Pasewalk and Bertikow with a more powerful 380 kV overhead line.

  • FURTHER INFORMATION

380-kV overhead line Güstrow – Parchim Süd – Perleberg

A 220-kV overhead line runs between the substations of Güstrow in Mecklenburg-Western Pomerania and Perleberg in Brandenburg. Its capacity should be increased to 380 kV. The planned overhead line should for the most part run along the existing line route for about 100 kilometres.

  • FURTHER INFORMATION

380-kV overhead line Perleberg – Wolmirstedt

50Hertz is planning the replacement of the available 220-kV line between Wolmirstedt and Güstrow with a current-carrying capacity of 1,070 amperes by a more powerful 380-kV line with a 3,600 ampacity.

  • FURTHER INFORMATION

380-kV overhead line 'Nordring Berlin'


Along the A10 north of Berlin, 50Hertz is replacing the current 220 kV line with a 380 kV EHV overhead line, which will connect the Brandenburg substations of Neuenhagen bei Berlin and Wustermark.

  • FURTHER INFORMATION

The South-West Interconnector

The South-West Interconnector is a 380 kV overhead line, constructed by 50Hertz in three sections between Bad Lauchstädt (Saxony-Anhalt) and the Thuringian border with Bavaria.

  • FURTHER INFORMATION

Uckermark Line

50Hertz is planning an EHV line from the Prenzlau region to Neuenhagen bei Berlin. With this project, 50Hertz factors in the growing segment of renewables in Brandenburg.

  • FURTHER INFORMATION

Grid connection of the Jessen/Nord substation

The increasing share of electricity generated from renewable energy sources requires the reinforcement of the grid in the Falkenberg-Herzberg-Jessen region. To this end, 50Hertz is constructing a new substation near Jessen in Saxony-Anhalt.

  • FURTHER INFORMATION

380-kV overhead line 3rd interconnector

This overhead line of European significance, a transition between the German and Polish transmission systems, is being constructed between Eisenhüttenstadt in Germany and Plewiska in Poland. Polish TSO PSE-O and German TSO 50Hertz are working together as partners to ensure the success of this project.

  • FURTHER INFORMATION
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login