DE
EN
Media
Media library
Contact
Press releases
Career
Job Offers
About
50Hertz
Application Procedure
Job subscription
Investor Relations
Partners
Grid customers
Grid connection
Grid access
Balancing group customers
Market communication
System services
Interruptible loads
Utilisation before limitation
Grid losses
Grid reserve
Standard contracts
Suppliers
Supplier portal
Frequently Asked Questions
Downloads
EEG registration
Company
Structure
Management
Supervisory Board
Roles
Business locations
Sustainability
CSR Portal
Occupational safety
Engagement
Governance
Innovation
Partnerships
Scientific Advisory & Project Board (SAPB)
History
Strategy
Future. Renewable
Future. Economic
Future. Digital
Future. Thoughtful
Grid
Grid developement
Onshore projects
380 kV overhead line Pasewalk – Bertikow
380-kV overhead line Güstrow – Parchim Süd – Perleberg
380-kV overhead line Perleberg – Wolmirstedt
380 kV overhead line Pulgar – Vieselbach
380-kV Berlin diagonal power link
380 kV overhead line "Nordring Berlin"
Third interconnector
Grid connection of the Jessen/Nord substation
Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
SuedOstLink
South-West Interconnector
Uckermark Line
Grid reinforcement Mecklar-Vieselbach
Offshore projects
Combined Grid Solution
Hansa PowerBridge
Ostwind 2
Kontek 400-KV Grid Connection
Ostwind 3
Interconnectors and phase shifters
Concluded projects
380-kV line Bärwalde – Schmölln
380 kV grid connection to the Förderstedt substation
Baltic 1
Baltic 2
Wind Bus Bar
Ostwind 1
Why expand the grid?
Frequently asked questions
50Hertz
Energy Transition Outlook 2035
Planning criteria
Protection for people and nature
Bird protection
Overhead line and cable
Cost-effectiveness
Planning and approval process
Grid Development Plan (GDP) and Federal Requirement Plan
Planning and licensing
Transparency and public participation
Compensations for municipalities
Projects of Common Interest (PCI)
BESTGRID
50Hertz
pilot project
Publications
compactLine
System control
Grid control
System balancing
Grid availability
Redispatch
Grid operations
Market
European internal energy market
Grid usage and congestion management
Usage of interconnectors
Usage of
50Hertz
grid
Congestion management international
Congestion management national
Balancing energy
Market roles
EEG
Transparency
Grid Data
Production
Grid feed-in
Photovoltaics
Wind power
Disclosure of EEG data
Annual EEG bill
Publications on EEG balancing group
Congestion management
Measures as per § 13 para. 1 EnWG
Measures as per § 13 para. 2 EnWG
Commercial transactions to balance the redispatch balancing group
Archive Measures as per § 13 EnWG
Outage planning
Outages
Redispatch Calculator SWKL
Balancing
Control reserve (capacity provision)
Control energy (activated balance energy)
Positions
Show All
Home
/
News
/
Full article: News of 50Hertz
The news article could not be found. The article may have been moved or deleted. Please check the URL and try again.
Press Contact
Dr. Danuta Kneipp
Leiterin Öffentlichkeitsbeteiligung
Phone:
+49 (0) 30 5150-2198
Mail:
Danuta.Kneipp@50hertz.com