50hertz.com
50hertz.com
Suchen-Icon
  • DE
  • EN
  • Media
    • Media library
    • Contact
    • Press releases
  • Career
    • Job Offers
    • About 50Hertz
    • Application Procedure
    • Job subscription
  • Investor Relations
  • Partners
    • Grid customers
      • Grid connection
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      • Interruptible loads
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      • Supplier portal
      • Frequently Asked Questions
      • Downloads
    • EEG registration
  • Company
    • Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
    • Sustainability
      • CSR Portal
      • Occupational safety
      • Engagement
      • Governance
    • Innovation
    • Partnerships
    • History
  • Grid
    • Grid developement
      • Onshore projects
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • SuedOstLink
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
      • Offshore projects
        • Combined Grid Solution
        • Hansa PowerBridge
        • Ostwind 2
        • Kontek 400-KV Grid Connection
      • Interconnectors and phase shifters
      • Concluded projects
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
        • Ostwind 1
      • Why expand the grid?
        • Frequently asked questions
        • 50Hertz Energy Transition Outlook 2035
      • Planning criteria
        • Protection for people and nature
        • Bird protection
        • Overhead line and cable
        • Cost-effectiveness
      • Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Compensations for municipalities
      • Projects of Common Interest (PCI)
      • BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
  • Market
    • European internal energy market
    • Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
    • EEG
  • Transparency
    • Grid Data
      • Production
        • Grid feed-in
        • Photovoltaics
        • Wind power
      • Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        • Measures as per § 13 para. 1 EnWG
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Outage planning
        • Outages
        • Redispatch Calculator SWKL
      • Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
    • Positions
  • Grid Data
    • Production
      • Grid feed-in
      • Photovoltaics
      • Wind power
    • Disclosure of EEG data
      • Annual EEG bill
      • Publications on EEG balancing group
    • Congestion management
      • Measures as per § 13 para. 1 EnWG
      • Measures as per § 13 para. 2 EnWG
      • Commercial transactions to balance the redispatch balancing group
      • Archive Measures as per § 13 EnWG
      • Outage planning
      • Outages
      • Redispatch Calculator SWKL
    • Balancing
      • Control reserve (capacity provision)
      • Control energy (activated balance energy)
  • Positions
Show All
Home/Transparency/Positions

Positions

Transparent political communications

50Hertz publicly shares its interests and positions with political stakeholders, as we consider the energy transition to be a shared task of society as a whole, which can only be achieved successfully through constructive dialogue with all social partners. 

In this context, 50Hertz regularly meets with political, administrative and regulatory representatives, at the European, federal and state level as well as at the district and municipal level. The focus lies on such themes as the general organisation of the energy transition, the security of the electricity supply in the context of the simultaneous increase in renewable energy and local grid expansion. 

CONTACT

Kerstin Maria Rippel

Head of Communications and Public Affairs
  • Tel:
    +49 (0) 30 5150-0
  • E-Mail:
    info@50hertz.com
CONTACT

Brigita Jeroncic

Head of Energy Policy
  • Tel:
    +49  (0) 30 5150-2794
  • E-Mail:
    brigita.jeroncic@50hertz.com
CONTACT

Christina Meinshausen

Energy Policy Federal States
  • Tel:
    +49 (0) 30 5150-3415
  • Fax:
    +49 30-5150-2199
  • E-Mail:
    christina.meinshausen@50hertz.com
CONTACT

Ullrich Rehder

Energy Policy Federal Government
  • Tel:
    +49 30 5150-2693
  • Email:
    ullrich.rehder@50hertz.com
CONTACT

Maximilian Schulze-Vorberg

EU affairs
  • Tel:
    +49 (0) 30 5150-3421
  • E-Mail:
    maximilian.schulze-vorberg@50hertz.com
Sarah-Juliane Prey
CONTACT

Sarah-Juliane Prey

Energy Policy
  • Tel:
    +49 30 5150-3932
  • Email:
    sarah-juliane.prey@50hertz.com
Nils Tohermes
CONTACT

Nils Tohermes

Energy Policy
  • Tel:
    +49 30 5150-3925
  • Email:
    nils.tohermes@50hertz.com

Position papers

09.10.2017 

50Hertz position on the proposals of the European Commission on Clean Energy for all Europeans

50Hertz welcomes the European Commission's endeavour to further reinforce the EU Internal Energy Market with its Clean Energy for All Europeans legislative package. The majority of the proposed measures offer a good basis. Nevertheless, 50Hertz feels that some of the proposals included in the package are not needed to further develop the EU Internal Energy Market.

READ MORE

  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf Twitter teilen
Login