50hertz.com
EN

Sprache auswählen

  • DE
  • EN
50hertz.com
EN
  • DE
  • EN
  • Media
    Media
    • Media library
    • Contact
    • Press releases
  • Career
  • Investor Relations
  • Partners
    Partners
    • Grid customers
      Grid customers
      • Grid access
    • Balancing group customers
    • Market communication
    • System services
      System services
      • Utilisation before limitation
      • Grid losses
      • Grid reserve
    • Standard contracts
    • Suppliers
      Suppliers
      • SAP Business Network
      • Frequently Asked Questions
      • Downloads
        Downloads
        • Principles
        • Previous versions of purchasing conditions
  • Company
    Company
    • Structure
      Structure
      • Management
      • Supervisory Board
    • Roles
    • Business locations
      Business locations
      • The 50Hertz Netzquartier
    • Sustainability and Human Rights
      Sustainability and Human Rights
      • CSR Portal
      • Occupational safety
      • Engagement
      • Notices & Reports
      • Test Governance
    • Innovation
    • Partnerships
      Partnerships
      • Scientific Advisory & Project Board (SAPB)
    • Strategy
      Strategy
      • Future. Renewable
      • Future. Economic
      • Future. Digital
      • Future. Thoughtful
  • Grid
    Grid
    • Grid developement
      Grid developement
      • Onshore projects
        Onshore projects
        • SuedOstLink
        • SuedOstLink Plus
        • NordOstLink
        • 380 kV overhead line Pasewalk – Bertikow
        • 380-kV overhead line Güstrow – Parchim Süd – Perleberg
        • 380-kV overhead line Perleberg – Wolmirstedt
        • 380 kV overhead line Pulgar – Vieselbach
        • 380-kV Berlin diagonal power link
          380-kV Berlin diagonal power link
          • Videos
        • 380 kV overhead line "Nordring Berlin"
        • Third interconnector
        • Grid connection of the Jessen/Nord substation
        • Grid reinforcement of 380-kV high-voltage transmission line Röhrsdorf-Weida-Remptendorf
        • South-West Interconnector
        • Uckermark Line
        • Grid reinforcement Mecklar-Vieselbach
        • Eulenberg substation
        • Grid reinforcement Teltow-Fläming
      • Offshore projects
        Offshore projects
        • Grid connection OST-6-1
        • Hansa PowerBridge
        • Ostwind 2
        • Ostwind 3
          Ostwind 3
          • Substations onshore/offshore
        • Ostwind 4
        • LanWin3
        • Bornholm Energy Island
      • Interconnectors and phase shifters
      • Concluded projects
        Concluded projects
        • Kontek 400-KV Grid Connection
        • Ostwind 1
        • Combined Grid Solution
        • 380-kV line Bärwalde – Schmölln
        • 380 kV grid connection to the Förderstedt substation
        • Baltic 1
        • Baltic 2
        • Wind Bus Bar
      • Planning criteria
      • Planning and approval process
        Planning and approval process
        • Grid Development Plan (GDP) and Federal Requirement Plan
        • Planning and licensing
        • Transparency and public participation
      • Projects of Common Interest (PCI)
      • BESTGRID
        BESTGRID
        • 50Hertz pilot project
        • Publications
      • compactLine
    • System control
      System control
      • Grid control
      • System balancing
      • Grid availability
      • Redispatch
    • Grid operations
    • MCCS
    • MCCS DSA
    • Market sounding: State Estimator MCCS NextGen
  • Market
    Market
    • European internal energy market
    • Grid usage and congestion management
      Grid usage and congestion management
      • Usage of interconnectors
      • Usage of 50Hertz grid
      • Congestion management international
      • Congestion management national
    • Balancing energy
    • Market roles
  • Transparency
    Transparency
    • Grid Data
      Grid Data
      • Installed capacity
        Installed capacity
        • Wind power
        • Photovoltaics
      • Production & grid feed-in
        Production & grid feed-in
        • Production
        • Grid feed-in
        • Wind power
        • Photovoltaics
      • Disclosure of EEG data
        Disclosure of EEG data
        • Annual EEG bill
        • Publications on EEG balancing group
      • Congestion management
        Congestion management
        • Measures as per § 13 para. 1 EnWG (Conventional power plants)
        • Measures as per § 13 Abs. 1 EnWG (EE and VNB)
        • Measures as per § 13 para. 2 EnWG
        • Commercial transactions to balance the redispatch balancing group
        • Archive Measures as per § 13 EnWG
        • Countertrading
        • Outage and Planning
      • Balancing
        Balancing
        • Control reserve (capacity provision)
        • Control energy (activated balance energy)
        • Archive control energy
    • Positions and Contact
  • Suppliers
  • Marketcommunication
  • Business Portal
  • Grid connection request

Sprache auswählen

  • DE
  • EN

  • Grid customers
  • Balancing group customers
  • Market communication
  • System services
  • Standard contracts
  • Suppliers
    • SAP Business Network
    • Frequently Asked Questions
    • Downloads
      • Principles
      • Previous versions of purchasing conditions
Home/Partners/Suppliers/Downloads

Downloads

Below you can find our purchasing conditions.

Which purchasing conditions apply for you as a supplier, is determined by contractual agreement. This page simply serves the aim of acquainting you with an overview of our purchasing conditions.

For any questions regarding our Purchasing Conditions, please get in touch with your usual contact within the Purchasing Department.

Principles

Which Purchasing Conditions apply for you as a Supplier, is determined by contractual agreement. Generally, different conditions apply according to the following criteria

  • Sourcing category
    The type of supplies, services or works delivered
  • Value of the purchase
    If the contract/PO's value remains below €100K, 50Hertz reserves its right to apply short version of General Purchasing Conditions (GPC) and Specific Purchasing Conditions (SPC).
  • Date of your contract/PO
    Depending on your contract/PO, the current or one of the older versions of terms & conditions applies.

Sourcing categories

For purchases from each of the sourcing categories, IT, Works, and Electrical Equipment (PO value ≥ €100k), we have developed tailored versions of the purchasing conditions. For smaller purchases (PO value < €100k) from these sourcing categories, we have developed a Short version of our purchasing conditions.

Depending on the type of purchases ordered by the Services department, the buyer may choose whether purchasing conditions (and if so, which set) shall apply or a stand-alone contract is to be concluded.

The Specific Purchasing Conditions (SPC) shall apply together with the General Purchasing Conditions (GPC) and shall be incorporated in Contracts with the Elia Group General Purchasing Conditions.

General Purchasing Conditions          + Specific Purchasing Conditions
      My contract is governed by
  DE EN   German law DE German law EN Belgian law EN
Electrical Equipment Allgemeine Einkaufsbedingungen für Elektrischer Ausrüstung (in German) (v 01/03/2022) General Purchasing Conditions for Electrical Equipment (binding version) (v 01/03/2022)* + Besondere Einkaufsbedingungen für Elektrischer Ausrüstung - Deutschland (in German) (v 01/03/2022) Specific Purchasing Conditions for Electrical Equipment - Germany (binding version) (v 01/03/2022)* Specific Purchasing Conditions for Electrical Equipment - Belgium (binding version) (v 01/03/2022)*
IT Allgemeine Einkaufsbedingungen für IT (in German) (v 01/03/2022) General Purchasing Conditions for IT (binding version) (v 01/03/2022)* + Besondere Einkaufsbedingungen für IT - Deutschland (in German) (v 01/03/2022) Specific Purchasing Conditions for IT - Germany (binding version) (v 01/03/2022)* Specific Purchasing Conditions for IT - Belgium (binding version) (v 01/03/2022)*
Works Allgemeine Bedingungen für Werkleistungen (in German) (v 01/03/2022) General Conditions for Works (binding version) (v 01/03/2022)* + Besondere Bedingungen für Werkleistungen - Deutschland (in German) (v 01/03/2022) Specific Conditions for Works - Germany (binding version) (v 01/03/2022)* Specific Conditions for Works - Belgium (binding version) (v 01/03/2022)*
Short version Allgemeine Einkaufsbedingungen Kurzfassung (in German) (v 10/08/2021)* General Purchasing Conditions Short Version (v 10/08/2021) + Besondere Einkaufsbedingungen Kurzfassung - Deutschland (in German) (v 01/03/2022)* Specific Purchasing Conditions Short Version - Germany (v 01/03/2022) Specific Purchasing Conditions Short Version - Belgium (v 30/06/2021)

 

Clauses in [square brackets] indicate provisions that expressly relate to installation services. Whether such services are part of the contract/PO in the individual case is determined by the respective contractual agreement.

* Unless indicated otherwise, this language version prevails in case of discrepancies between the language versions. For the Short version, the prevailing national language version is indicated on the PO/Contract. See clause 1 of the relevant GPC.

Other sourcing categories & Documents

  • 03 ENTSORGELEISTUNGEN STAND 03-2017 Download PDF (264.1 KB)
  • 04 ARBEITNEHMERÜBERLASSUNG STAND 03-2017 Download PDF (200.41 KB)
  • 08 ESCROW AGREEMENT Download PDF (65.96 KB)
  • 09 RECHNUNGSINHALTE UND MÖGLICHE RÜCKSENDEGRÜNDE STAND 03-2020 Download PDF (634.78 KB)
  • 10 VORLAGE VERTRAG DATENVERARBEITUNG NACH DSGVO STAND 03-2019.PDF Download PDF (192.08 KB)
  • 11 HANDOUT GUTSCHRIFTSVERFAHREN FÜR LIEFERANTEN STAND 12-2016 Download PDF (845.72 KB)
  • 12 VERHALTENSKODEX FÜR LIEFERANTEN.EN Download PDF (9.08 MB)
  • 13 NUTZUNGSBEDINGUNGEN VIRTUELLE IT ARBEITSUMGEBUNG STAND 08-2019 Download PDF (892.9 KB)

 

 

Previous versions of purchasing conditions

Conditions for IT, Electrical Equipment from July 2021 - February 2022

General Procurement Conditions         + Specific Procurement Conditions
      My contract is governed by
  DE EN   German law DE German law DE Belgian Law EN
Electrical Equipment Allgemeine Einkaufsbedingungen für Elektrischer Ausrüstung (in German) (v July 2021) General Purchasing Conditions for Electrical Equipment (binding version) (v July 2021)* + Besondere Einkaufsbedingungen für Elektrischer Ausrüstung - Deutschland (in German) (v July 2021) Specific Purchasing Conditions for Electrical Equipment - Germany (binding version) (v July 2021)* Specific Purchasing Conditions for Electrical Equipment - Belgium (binding version) (v July 2021)*
IT Allgemeine Einkaufsbedingungen für IT (in German) (v  July 2021) General Purchasing Conditions for IT (binding version) (v July 2021)* + Besondere Einkaufsbedingungen für IT - Deutschland (in German) (v 30/06/2021) Specific Purchasing Conditions for IT - Germany (binding version) (v 30/06/2021)* Specific Purchasing Conditions for IT - Belgium (binding version) (v 30/06/2021)*

 

Clauses in [square brackets] indicate provisions that expressly relate to installation services. Whether such services are part of the contract/PO in the individual case is determined by the respective contractual agreement.

All other previous versions of the purchasing conditions can be found below

  • 01 EINKAUFSBEDINGUNGEN ALLGEMEIN STAND 03-2017 Download PDF (233.1 KB)
  • 02 WERKLEISTUNGEN STAND 03-2017 Download PDF (285.58 KB)
  • 05 INGENIEURLEISTUNGEN STAND 03-2017 Download PDF (300.84 KB)
  • 06 INFORMATIONSTECHNISCHE LEISTUNGEN STAND 03-2017 Download PDF (270.81 KB)
  • 07 LIEFERUNG HOCHSPANNUNGSKOMPONENTEN STAND 03-2017 Download PDF (316.77 KB)

Documents for the 50Hertz supplier portal and the P2P process 

  • 01 FREQUENTLY ASKED QUESTIONS SAP BN Download PDF (1.08 MB)
  • 02 MANUAL ACCOUNT SET-UP SAP BN Download PDF (1.67 MB)
  • 03 MANUAL CREATE ORDER CONFIRMATION SAP BN Download PDF (1.3 MB)
  • 04 HANDOUT CREATE SHIP NOTICE SAP BN Download PDF (920.67 KB)
  • 05 HANDOUT SEND A SERVICE ENTRY SHEET SAP BN Download PDF (1019.97 KB)
  • 06 HANDOUT SEND AN INVOICE SAP BN Download PDF (1.02 MB)
  • 07 USER MANUAL SAP BUSINESS NETWORK Download PDF (1.85 MB)
  • 08 HANDOUT CREATE NEW USER SAP BN Download PDF (417.04 KB)
  • 09 RETRIEVE YOUR ORDER SAP BN Download PDF (1.84 MB)
CONTACT

50Hertz Purchasing

Heidestraße 2 | 10557 Berlin
  • Tel:
    +49 (0) 30 5150-0
  • E-Mail:
    purchasing@50hertz.com
  • Contact
  • Imprint
  • Data protection
  • Newsletter
  • Sitemap
  • per E-Mail teilen auf Facebook teilen auf X teilen
Login